Production & Operations Management

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/25

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering core concepts, tools, and processes in production and operations management, including production control, manufacturing systems, facility layouts, inventory management, and planning charts.

26 Terms

1
New cards

Production

The creation of goods using land, labor, materials, capital, entrepreneurship, and knowledge (the factors of production).

2
New cards

Production Management

All the activities managers engage in to help firms create goods.

3
New cards

Operations Management

A specialized area in management that converts or transforms resources into goods and services, including inventory management, quality control, production scheduling, and follow-up services.

4
New cards

Production Control

The phase of the production process that coordinates operations through planning, routing, scheduling, dispatching, and follow-up to turn inputs into outputs.

5
New cards

Process Manufacturing

The part of production that physically or chemically changes materials (such as shaping plastic using heat and pressure).

6
New cards

Assembly Process

The part of production that puts together components to create a finished good.

7
New cards

Continuous Process

A production process characterized by long production runs that turn out finished goods over time.

8
New cards

Intermittent Process

A production process where production runs are short and the producer adjusts machines frequently to make different products.

9
New cards

Computer-Aided Design (CAD)

The use of computers in the design of products.

10
New cards

Computer-Aided Manufacturing (CAM)

The use of computers in the manufacturing of products.

11
New cards

Computer-Integrated Manufacturing (CIM)

The uniting of computer-aided design with computer-aided manufacturing, which can cut up to 80%80\% of the time needed to program machines to make parts.

12
New cards

Mass Customization

Tailoring products to meet the needs of a large number of individual customers.

13
New cards

Nanomanufacturing

A manufacturing approach capable of manipulating materials on a molecular level.

14
New cards

Facility Layout

The physical arrangement of resources, including people, to most efficiently produce goods and provide services.

15
New cards

Assembly Line Layout

A facility layout in which workers do only a few tasks at a time as products move through the sequence of production.

16
New cards

Modular Layout

A facility layout where teams of workers produce more complex units of a final product.

17
New cards

Fixed-Position Layout

A facility layout that allows workers to congregate around a stationary product being assembled.

18
New cards

Purchasing

The operational function that searches for high-quality material resources, finds the best suppliers, and negotiates the best price for goods and services.

19
New cards

Just-in-Time (JIT) Inventory Control

A production process in which a minimum of inventory is kept on hand and parts, supplies, and other needs are delivered just in time to go on the assembly line.

20
New cards

Quality

Consistently producing what the customer wants while reducing errors before and after delivery.

21
New cards

Six Sigma Quality

A quality control measure and standard that allows only 3.43.4 defects per million opportunities.

22
New cards

Lean Manufacturing

The production of goods using fewer resources compared to mass production, typically requiring 12\frac{1}{2} the human effort, 13\frac{1}{3} the engineering effort, 12\frac{1}{2} the floor space, 90%90\% less inventory, and having half the defects.

23
New cards

Program Evaluation and Review Technique (PERT)

A project management method for analyzing the tasks involved in completing a given project and estimating the time needed for each task.

24
New cards

Critical Path

The sequence of tasks in a PERT network that takes the longest time to complete.

25
New cards

Gantt Chart

A bar graph showing the progress of current production projects and their completion status.

26
New cards

Urethane

A common industrial chemical sprayed on a hot tub's acrylic and plastic shell to add rigidity.