Grid & Distribution / Power Industry Terms

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/153

flashcard set

Earn XP

Description and Tags

Comprehensive vocabulary flashcards covering power industry, grid, and distribution terms, voltage classifications, operational alerts, loss definitions, and regulatory planning concepts.

Last updated 8:00 AM on 10/6/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

154 Terms

1
New cards

Fast Start

The capability of a Generating Unit or Generating Plant to start and synchronize with the Grid within 15 minutes15\,\text{minutes}.

2
New cards

Backup Reserve

A Fast Start generating unit that can synchronize with the Grid and provide its declared capacity for a minimum period of 8 hours8\,\text{hours}; also called Cold Standby Reserve.

3
New cards

Spinning Reserve

The component of Contingency Reserve synchronized to the Grid and ready to take on Load; also called Hot Standby Reserve.

4
New cards

Contingency Reserve

Generating capacity intended to take care of the loss of the largest Synchronized Generating Unit or power import from a single Grid interconnection, whichever is larger; includes Spinning Reserve and Backup Reserve.

5
New cards

Primary Response

The automatic response of a Generating Unit to frequency changes released increasingly from 0 to 5 s0\text{ to }5\,\text{s} from the time of frequency change, fully available for the next 25 s25\,\text{s}.

6
New cards

Secondary Response

The automatic response to frequency fully available 25 s25\,\text{s} from the time of frequency change to take over from Primary Response, sustainable for at least 30 min30\,\text{min}.

7
New cards

Blue Alert

A notice issued by the System Operator when a tropical disturbance is expected to make landfall within 24 hours24\,\text{hours}.

8
New cards

Demand Control Imminent Warning

A warning from the System Operator issued when a Demand reduction is expected within the next 30 minutes30\,\text{minutes}.

9
New cards

Planned Activity Notice

A notice issued by a User to the Grid Owner and System Operator for any planned activity or shutdown at least 7 days7\,\text{days} prior to the actual activity.

10
New cards

Schedule Day

The period from 0000H0000\text{H} to 2400H2400\text{H} each day.

11
New cards

Critical Loading

The condition when the loading of transmission lines or substation equipment is between 90%90\% and 100%100\% of the continuous rating.

12
New cards

Imminent Overloading

The condition when the loading of transmission lines or substation equipment is above 100%100\% up to 110%110\% of the continuous rating.

13
New cards

Emergency State

The Grid operating condition when a Multiple Outage Contingency has occurred without resulting in Total System Blackout and a generating deficiency exists, voltages are outside 0.900.90 to 1.101.10, or equipment loading is above 110%110\% of continuous rating.

14
New cards

Low Voltage (LV)

A voltage level not exceeding 1000 V1000\,\text{V} (1 kV1\,\text{kV}).

15
New cards

Medium Voltage (MV)

A voltage level exceeding 1 kV1\,\text{kV} up to 34.5 kV34.5\,\text{kV}.

16
New cards

High Voltage (HV)

A voltage level exceeding 34.5 kV34.5\,\text{kV} up to 230 kV230\,\text{kV}.

17
New cards

Extra High Voltage (EHV)

A voltage level exceeding 230 kV230\,\text{kV} up to 765 kV765\,\text{kV}.

18
New cards

Overvoltage

A Long Duration Voltage Variation where the RMS value of the voltage is greater than or equal to 110%110\% of the nominal voltage.

19
New cards

Undervoltage

A Long Duration Voltage Variation where the RMS value of the voltage is less than or equal to 90%90\% of the nominal voltage.

20
New cards

Short Duration Voltage Variation

A variation of the RMS value of the voltage from its nominal value for a time greater than one-half cycle of the power frequency but not exceeding 1 minute1\,\text{minute}.

21
New cards

Long Duration Voltage Variation

A variation of the RMS value of the voltage from nominal voltage for a time greater than 1 minute1\,\text{minute}.

22
New cards

Voltage Sag

A Short Duration Voltage Variation where the RMS value of the voltage decreases to between 10%10\% and 90%90\% of nominal voltage; also known as Voltage Dip.

23
New cards

Voltage Swell

A Short Duration Voltage Variation where the RMS value of the voltage increases to between 110%110\% and 180%180\% of nominal voltage.

24
New cards

Voltage Fluctuation

Systematic or random RMS voltage envelope changes where the RMS value of the voltage is between 90%90\% and 110%110\% of the nominal value.

25
New cards

Large Generator

A Generation Company whose generating facility at the Connection Point has an aggregate capacity in excess of 20 MW20\,\text{MW}.

26
New cards

Small Generator

A Generation Company whose generating facility at the Connection Point has an aggregate capacity of 20 MW20\,\text{MW} or below.

27
New cards

Large Customer

A customer with a demand of at least 1 MW1\,\text{MW}, or the threshold value specified by the ERC.

28
New cards

System Loss

The total Energy injected into the Grid or Distribution System minus the total Energy delivered to Distributors and End-Users.

29
New cards

Technical Loss

The component of System Loss inherent in the physical delivery of electric energy, including conductor loss, transformer core loss, and technical errors in meters.

30
New cards

Non-Technical Loss

The component of System Loss not related to physical electrical characteristics, caused primarily by human error, meter tampering, and erroneous meter reading.

31
New cards

Administrative Loss

The component of System Loss referring to energy used in proper Grid operation (e.g., station service) that is not classified as Technical or Non-Technical Loss.

32
New cards

Total Harmonic Distortion (THD)

The ratio of the root-mean-square value of harmonic content to the root-mean-square value of the fundamental quantity, expressed in percent.

33
New cards

Total Demand Distortion (TDD)

The ratio of the root-mean-square value of harmonic content to the root-mean-square value of the rated or maximum demand fundamental quantity, expressed in percent.

34
New cards

Momentary Average Interruption Frequency Index (MAIFI)

The total number of momentary customer power interruptions within a given period divided by the total number of customers served within the same period.

35
New cards

Negative Sequence Unbalance Factor (NSUF)

The ratio of the magnitude of the negative sequence component of voltages to the magnitude of the positive sequence component, expressed in percent.

36
New cards

Zero-Sequence Unbalance Factor (ZSUF)

The ratio of the magnitude of the zero sequence component of voltages to the magnitude of the positive sequence component, expressed in percent.

37
New cards

Total System Blackout

The condition when all generation in the Grid has ceased, the entire System has Shutdown, and the System Operator must implement a Black Start.

38
New cards

Partial System Blackout

The condition when a part of the Grid is isolated from the rest of the Grid and all generation in that part has Shutdown.

39
New cards

Black Start

The process of recovery from Total System Blackout using a Generating Unit with the capability to start and synchronize without an external power supply.

40
New cards

Isolation

The electrical separation of a part or Component from the rest of the electrical system to ensure safety when maintaining or when service is not required.

41
New cards

Grounding

A conducting connection by which an electrical circuit or Equipment is connected to earth or to a conducting body of relatively large extent.

42
New cards

Outage

The state of a Component when it is not available to perform its intended function due to some event directly associated with that Component.

43
New cards

Interruption

The loss of service to a Customer or group of Customers or other facilities resulting from one or more Component Outages.

44
New cards

Merit Order Table

The list showing offer prices and corresponding capacity of Scheduled Generating Units arranged such that the lowest offer price is at the top of the list.

45
New cards

Captive Market

Refers to electricity End-users who do not have the choice of a Supplier of electricity, as determined by the ERC.

46
New cards

Contestable Market

Refers to electricity End-users who have a choice of a Supplier of electricity, as determined by the ERC.

47
New cards

Open Access

Refers to the system of allowing any qualified Person the use of transmission and/or distribution systems and associated facilities subject to approved wheeling rates.

48
New cards

Grid Code

The set of rules, requirements, procedures, and standards governing the safe, reliable, secured, and efficient operation, maintenance, and development of the high-voltage backbone Transmission System.

49
New cards

Distribution Code

A compilation of rules and regulations governing electric utilities in the operation, maintenance, and development of their Distribution System.

50
New cards

Reliability

The probability that a System or Component will perform a required task for a specified time; the ability of a power System to continuously provide service to its Customers.

51
New cards

Security

The continuous operation of a power system in the Normal State, ensuring safe and adequate supply of power to End-Users, even when some parts or Components are on Outage.

52
New cards

Stability

The ability of the dynamic Components of the power System to return to a normal or stable operating point after being subjected to some form of change or disturbance.

53
New cards

Yellow Alert

A notice issued by the System Operator when Contingency Reserve is less than the capacity of the largest Synchronized Generating Unit or power import from a single interconnection, whichever is higher.

54
New cards

Red Alert

An alert issued by the System Operator when Grid Contingency Reserve is zero, a generation deficiency exists, or there is Critical Loading or Imminent Overloading.

55
New cards

Security Red Alert

A notice issued by the System Operator when peace and order problems exist which may affect Grid operations.

56
New cards

Power Development Program (PDP)

The indicative plan for managing Demand through energy-efficiency programs and upgrading, expanding, rehabilitating, repairing, and maintaining power generation and transmission facilities, formulated yearly by the DOE.

57
New cards

Philippine Energy Plan (PEP)

The overall energy program formulated and updated yearly by the DOE and submitted to Congress pursuant to R.A. 7638.

58
New cards

Transmission Development Plan (TDP)

The program for expansion, reinforcement, and rehabilitation of the Transmission System prepared by the Grid Owner and submitted to the DOE for integration with PDP and PEP.

59
New cards

Wholesale Electricity Spot Market (WESM)

The electricity market established by the DOE pursuant to Section 30 of the Act.

60
New cards

Grid Owner

The party that owns the high voltage backbone Transmission System and is responsible for maintaining adequate Grid capacity in accordance with the Grid Code.

61
New cards

System Operator

The party responsible for generation Dispatch, the provision of Ancillary Services, and operation and control to ensure safety, Power Quality, Stability, Reliability, and Security of the Grid.

62
New cards

Market Operator

An independent group whose task includes the operation and administration of the Wholesale Electricity Spot Market in accordance with the Market Rules.

63
New cards

Supplier

Any person or entity authorized by the ERC to sell, broker, market, or aggregate electricity to the End-users.

64
New cards

Distribution Utility

Any EC, private corporation, government owned utility or existing local government unit which has an exclusive franchise to operate a Distribution System in accordance with its franchise and the Act.

65
New cards

Fast Start

The capability of a Generating Unit or Generating Plant to start and synchronize with the Grid within 15 minutes15\,\text{minutes}.

66
New cards

Backup Reserve

A Fast Start generating unit that can synchronize with the Grid and provide its declared capacity for a minimum period of 8 hours8\,\text{hours}; also called Cold Standby Reserve.

67
New cards

Spinning Reserve

The component of Contingency Reserve synchronized to the Grid and ready to take on Load; also called Hot Standby Reserve.

68
New cards

Contingency Reserve

Generating capacity intended to take care of the loss of the largest Synchronized Generating Unit or power import from a single Grid interconnection, whichever is larger; includes Spinning Reserve and Backup Reserve.

69
New cards

Primary Response

The automatic response of a Generating Unit to frequency changes released increasingly from 0 to 5 s0\text{ to }5\,\text{s} from the time of frequency change, fully available for the next 25 s25\,\text{s}.

70
New cards

Secondary Response

The automatic response to frequency fully available 25 s25\,\text{s} from the time of frequency change to take over from Primary Response, sustainable for at least 30 min30\,\text{min}.

71
New cards

Blue Alert

A notice issued by the System Operator when a tropical disturbance is expected to make landfall within 24 hours24\,\text{hours}.

72
New cards

Demand Control Imminent Warning

A warning from the System Operator issued when a Demand reduction is expected within the next 30 minutes30\,\text{minutes}.

73
New cards

Planned Activity Notice

A notice issued by a User to the Grid Owner and System Operator for any planned activity or shutdown at least 7 days7\,\text{days} prior to the actual activity.

74
New cards

Schedule Day

The period from 0000H0000\text{H} to 2400H2400\text{H} each day.

75
New cards

Critical Loading

The condition when the loading of transmission lines or substation equipment is between 90%90\% and 100%100\% of the continuous rating.

76
New cards

Imminent Overloading

The condition when the loading of transmission lines or substation equipment is above 100%100\% up to 110%110\% of the continuous rating.

77
New cards

Emergency State

The Grid operating condition when a Multiple Outage Contingency has occurred without resulting in Total System Blackout and a generating deficiency exists, voltages are outside 0.900.90 to 1.101.10, or equipment loading is above 110%110\% of continuous rating.

78
New cards

Low Voltage (LV)

A voltage level not exceeding 1000 V1000\,\text{V} (1 kV1\,\text{kV}).

79
New cards

Medium Voltage (MV)

A voltage level exceeding 1 kV1\,\text{kV} up to 34.5 kV34.5\,\text{kV}.

80
New cards

High Voltage (HV)

A voltage level exceeding 34.5 kV34.5\,\text{kV} up to 230 kV230\,\text{kV}.

81
New cards

Extra High Voltage (EHV)

A voltage level exceeding 230 kV230\,\text{kV} up to 765 kV765\,\text{kV}.

82
New cards

Overvoltage

A Long Duration Voltage Variation where the RMS value of the voltage is greater than or equal to 110%110\% of the nominal voltage.

83
New cards

Undervoltage

A Long Duration Voltage Variation where the RMS value of the voltage is less than or equal to 90%90\% of the nominal voltage.

84
New cards

Short Duration Voltage Variation

A variation of the RMS value of the voltage from its nominal value for a time greater than one-half cycle of the power frequency but not exceeding 1 minute1\,\text{minute}.

85
New cards

Long Duration Voltage Variation

A variation of the RMS value of the voltage from nominal voltage for a time greater than 1 minute1\,\text{minute}.

86
New cards

Voltage Sag

A Short Duration Voltage Variation where the RMS value of the voltage decreases to between 10%10\% and 90%90\% of nominal voltage; also known as Voltage Dip.

87
New cards

Voltage Swell

A Short Duration Voltage Variation where the RMS value of the voltage increases to between 110%110\% and 180%180\% of nominal voltage.

88
New cards

Voltage Fluctuation

Systematic or random RMS voltage envelope changes where the RMS value of the voltage is between 90%90\% and 110%110\% of the nominal value.

89
New cards

Large Generator

A Generation Company whose generating facility at the Connection Point has an aggregate capacity in excess of 20 MW20\,\text{MW}.

90
New cards

Small Generator

A Generation Company whose generating facility at the Connection Point has an aggregate capacity of 20 MW20\,\text{MW} or below.

91
New cards

Large Customer

A customer with a demand of at least 1 MW1\,\text{MW}, or the threshold value specified by the ERC.

92
New cards

System Loss

The total Energy injected into the Grid or Distribution System minus the total Energy delivered to Distributors and End-Users.

93
New cards

Technical Loss

The component of System Loss inherent in the physical delivery of electric energy, including conductor loss, transformer core loss, and technical errors in meters.

94
New cards

Non-Technical Loss

The component of System Loss not related to physical electrical characteristics, caused primarily by human error, meter tampering, and erroneous meter reading.

95
New cards

Administrative Loss

The component of System Loss referring to energy used in proper Grid operation (e.g., station service) that is not classified as Technical or Non-Technical Loss.

96
New cards

Total Harmonic Distortion (THD)

The ratio of the root-mean-square value of harmonic content to the root-mean-square value of the fundamental quantity, expressed in percent.

97
New cards

Total Demand Distortion (TDD)

The ratio of the root-mean-square value of harmonic content to the root-mean-square value of the rated or maximum demand fundamental quantity, expressed in percent.

98
New cards

Momentary Average Interruption Frequency Index (MAIFI)

The total number of momentary customer power interruptions within a given period divided by the total number of customers served within the same period.

99
New cards

Negative Sequence Unbalance Factor (NSUF)

The ratio of the magnitude of the negative sequence component of voltages to the magnitude of the positive sequence component, expressed in percent.

100
New cards

Zero-Sequence Unbalance Factor (ZSUF)

The ratio of the magnitude of the zero sequence component of voltages to the magnitude of the positive sequence component, expressed in percent.