Safety, Risk and NFPA 241

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/27

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:33 PM on 10/6/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

28 Terms

1
New cards

What is the goal of risk management?

To prevent or reduce (mitigate) losses — losses cost money

2
New cards

Probability, mode, frequency, severity

Probability = if it will occur; Mode = how; Frequency = how often; Severity = how much damage

3
New cards

Risk management definition

A process of proactive decision making that minimizes the adverse effects of unanticipated losses (key words: proactive efforts and decision making)

4
New cards

First step of risk management

Identify the hazard or potential loss

5
New cards

Four phases of risk management

Risk management, risk control, loss control, loss management

6
New cards

Risk control

A conscious effort, action, or decision NOT to act that reduces the frequency, severity, or unpredictability of losses — management chooses to act or not act

7
New cards

Loss control

Steps taken right AFTER a loss to control its effects and keep the organization functioning at the same level

8
New cards

Loss management

Returning the organization as close as possible to its pre-loss state (it will never be exactly the same)

9
New cards

What is NFPA 241?

Standard for Safeguarding Construction, Alteration, and Demolition Operations — minimum standards; fire departments shall be consulted

10
New cards

Risk Evaluation Pyramid (1 / 100 / 1,000 / 10,000)

1 = death, major loss, major litigation; 100 = serious injury, large loss; 1,000 = non-serious injury, minor loss; 10,000 = near misses / close calls

11
New cards

US construction fires and deaths (2022)

About 4,500 fires; 1,069 deaths (9.6 fatality rate)

12
New cards

Who designates the Fire Prevention Program Manager (FPPM)?

The owner (NFPA 241 4.1.1)

13
New cards

FPPM responsibilities

Carry the fire program to completion, enforce standards, be a competent person in fire codes, protect life and property, and conduct DAILY inspections

14
New cards

NFPA 241 4.2.2 pre-incident plan includes

Emergency communication, hot work operations, reporting emergencies, evacuation, on-site security

15
New cards

How often must construction sites be safeguarded?

Around the clock

16
New cards

Consequences of not complying with NFPA 241

Work stoppage, delays, or costly fines

17
New cards

NFPA 1 vs. NFPA 5000

NFPA 1 = Fire Code; NFPA 5000 = Building Construction and Safety Code

18
New cards

Three emergency action plan requirements

1) Procedures for reporting emergencies and evacuating (type of evacuation, exit routes); 2) Procedures for employees running critical operations before they evacuate; 3) Account for all employees before, during, and after evacuation

19
New cards

What is a risk?

An uncertainty or an unknown — you can't know for sure if, how, how often, or how badly a loss will occur

20
New cards

What is the one thing certain in every business?

Losses will occur — a smart manager prepares to reduce or mitigate them

21
New cards

When does loss control begin?

After the loss occurs — it is the immediate steps management takes to control the effects

22
New cards

What does risk control require management to do?

Do something to avoid further loss

23
New cards

Who has the authority to enforce NFPA 241 provisions on site?

The Fire Prevention Program Manager (FPPM) — NFPA 241 4.1.2

24
New cards

About how many construction injuries occur, and how many result in days away from work?

About 150,000 (upwards of 203,000); over 66,000 result in days away from work, just over 10,000 of them back injuries

25
New cards

Which chapter of NFPA 241 covers General Requirements?

Chapter 4

26
New cards

NFPA 241 Chapters 6 and 7

Chapter 6 = Utilities; Chapter 7 = Processes and Hazards

27
New cards

NFPA 241 Chapter 10

Safeguarding Roofing Operations

28
New cards

Four areas of action and compliance

Storage for equipment, identifying processes and hazards, control of utilities, fire protection