what is item 200?

Aggregate Sub-Base Course

2
New cards

What is sub-base course?

is an integral layer (crucial layer) in construction roads, airfields, other pavement structures.

3
New cards

Materials used for sub-base course?

  1. Granular

  2. Recycled

  3. Stabilized


4
New cards

a material that is Gravel, crushed stone, other aggregate materials

Granular Material

5
New cards

a material that is recycled concrete, asphalt, other construction material

Recycled Materials

6
New cards

a material that is treated with binders like cement, lime, asphalt to improve their load bearing capacity and durability

Stabilized Materials

7
New cards

thickness of sub-grade

150mm - 300mm

8
New cards

thickness of sub-base

100-300mm

9
New cards

thickness of base course

100mm-300mm

10
New cards

thickness of Binder course

(50mm-100mm)

11
New cards

a coat that is between base and binder course

prime coat

12
New cards

a coat that is between binder and surface course

tack coat

13
New cards

thickness of surface course

25 - 50mm

14
New cards

a coat used for surface course

seal coat.

15
New cards

what is item 201

aggregate base course

16
New cards

a layer of material in construction of a road. primary function is to provide stable base for the pavement, facilitate drainage and distribute loads

Aggregate Base Course

17
New cards

composition of base course

mixture of crushed stone, gravel and sand

18
New cards

Type of aggregate base coure

Unbound ; stabilized

19
New cards

Made of granular materials without any binding agents

unbound

20
New cards

includes binding agents like cement or asphalt to improve strength and stability

stabilized

21
New cards

Refers to process of compacting and stabilizing the material

Damping

22
New cards

aggregate base course material is evenly distributed across the road surface

spreading

23
New cards

proper curing ensures material gains strength overtime

curing

24
New cards

additives or stabilizer are mixed with aggregate

mixing

25
New cards

the surface is level to achieve uniform thickness

Leveling

26
New cards

it ensures proper slope and drainage

Grading

27
New cards

This is the crucial damping process. It is used to compress the aggregate, reducing voids and increasing density

Compaction

28
New cards

Quality control involves measuring the compacted density using _____

FDT Method (Field Density Test)

29
New cards

One of the most common methods that are used for field density test in highway construction

Sand Cone Method

30
New cards

Calculation for FDT

V hole = M_sand / Density of used sand

Wet Density = M_wet soil / V_hole

Dry Density =( (Wet Density x 100%) / Moisture Content ) + 100

Degree of COmpaction = (Dry Density x 100%) / Max Dry Density

31
New cards

What is Item 202

Crushed Aggregate Base Course

32
New cards

type of recycled concrete that is produced by crushing concrete that has been removed from old buildings, roads, other construction projects

Crushed Aggregate

33
New cards

What is item 203

Lime Stabilized road mix base course

34
New cards

type of base course in road construction where lime is used to improve engineering properties of base material

A lime - stabilized road mix base course

35
New cards

Hydrated lime shall be uniformly spread at specified percent using the _________

Dry or slurry (wet) methods

36
New cards

A typical slurry ratio is ______

1-ton lime to 2 cubic meter (1:2)

37
New cards

trial section shall be constructed ________ before actual base construction

atleast 2 weeks

38
New cards

if excavated materials are wasted, the volume involved shall be reported so that quality control requirements maybe adjusted accordingly. Submit project engineer _________

Certificate of waste

39
New cards

what is item 204

Portland cement stabilized road mix base course

40
New cards

Type of base layer used in road construction. This technique involves mixing portland cement with the existing or imported aggregate base materials to enhance their strength and durability

Portland Cement Stabilized Road Mix Base Course

41
New cards

For Item 204

Proportioning:

the amount of cement added to soil aggregate is from ________ of dry soil. Exact percentage shall be fixed by the Engineer based on preliminary tests and trial mixes.

6 -10 mass percent

42
New cards

What is item 205

Asphalt Stabilized Road Mix Base Course

43
New cards

Asphalt stabilized road mix base course which is also known as______

Asphalt - Treated Base

44
New cards

Construction technique where asphalt binder is mixed with aggregate to create a stable and durable base layer for roadways

Asphalt Stabilized Road Mix Base Course

45
New cards

For Item 205

Proportioning:

the amount of asphaltic material to be added to the soil aggregate shall be from _________ of the dry soil aggregate

4 -7 mass percent

46
New cards

What is item 206

Chemically Stabilized Road Mix Sub Base or Base Courses

47
New cards

Involve the use of chemical additives to improve the engineering properties of soil or aggregate materials used in the construction of road foundations.

Chemically Stabilized Road Mix Sub Base/Base Course

48
New cards

For Item 206:

Important Points:

Consist of __________ to improve the strength and other properties of ordinary soil for use as sub-base/surfacing materials

Application of polymer - based chemical soil additive

49
New cards

Polymer - based chemical soil additive shall be ________

less than 2% by weight of soil

50
New cards

the rate of dilution in each layer shall be __________ or one - part polymer - based chemical soil additive 5 to 9 parts of water

1:5 to 1:9

51
New cards

what is item 207

Portland Cement Treated Plant Mix Base Course

52
New cards

For item 207

Important notes:


The salvaged or new soil aggregate shall be pulverized until _________ of all material other than stone or gravel will pass a 4.75mm or sieve No.4

Atleast 80% mass percent

53
New cards

For item 207

Important notes:

The completed cement treated base shall be cured with a _______

Bituminous Curing Seal

54
New cards

For item 207

Important notes:

The rate of application of curing seal shall be between __________ and maitained ___________

0.5 to 1.0 L/m² ; atleast 5 days

55
New cards

Any material retained on a __________ and other unsuitable material shall be removed

50 mm sieve (2”)

56
New cards

What is item 208

Aggregate Stockpile

57
New cards

is a large, organized heap of aggregate stored for use in construction projects.

Aggregate Stockpile

58
New cards

Item 200: Aggregate Sub base course

Test Requirements

For every 300m³:

1G

1P (LL, PL, PI)


For every 1500m³

1C


For every 2500 m³

1-CBR


For every layer of 200mm


Atleast 1 group of 3 in-situ density tests for each 500m²

59
New cards

Item 201: Aggregate base course

Test Requirements

For every 300m³:

1G

1P (LL, PL, PI)


For every 1500m³

1C

1 Q (Grading, Plasticity, and Abrasion)


For every 2500 m³

1-CBR


For every layer of 200mm


Atleast 1 group of 3 in-situ density tests for each 500m²

60
New cards

Item 202: Crushed Aggregate base course

Test Requirements

For every 1500m³:

1F (Fractured Face)

61
New cards

Item 203: Lime Stabilized Road Mix Base Course

Test Requirements

Soil Aggregate For every 300m³

1G

1P (LL, PL, PI)


For every 1500 m³

1Q


Mix of every 300m³

1C (laboratory Compaction Test)

1-UC (Unconfined Compression Test)

1-CBR


Compacted Base Course. For every layer of 200mm compacted depth

1D
1T


Hydrated lime. For every 100

1Q


62
New cards

Item 204: Portland Cement Stabilized Road Mix Base Course

Test Requirements

Soil aggregate - Same as 203


Cement:

1Q - for every 2000 bags


Water

1Q - Project Engineer’s Certificate


Mix. For every 300m³

1C

1 - UC

1 CBR


Compacted Base Course

1D - FDT for every 150m

1T - thickness determination for every 150mm

63
New cards

Item 205: Asphalt Stabilized Road Mix Base Course

Proportioning of Mixture


the amount of asphaltic material to be added to the soil-aggregate shall be from ___________ of the dry soil aggregate

4 to 7 mass percent

64
New cards

What is item 205

Asphalt Stabilized Road Mix Base Course

65
New cards

what is item 206

Chemically stabilized road mix sub base/base course

66
New cards

involve the use of chemical additives to improve the engineering properties of soil or aggregate materials used in construction of road foundations

Chemically Stabilized Road Mix Sub Base or Base Course

67
New cards

item 206: Chemically stabilized road mix sub base/base course

Important notes


Consists of __________________ to improve the strength and other properties of ordinary soil for use as subbase surfacing materials

Application of polymer - based chemical soil additive

68
New cards

item 206: Chemically stabilized road mix sub base/base course

Important notes


Polymer-based chemical soil additive shall be ____________

less than 2 % by weight of soil

69
New cards

item 206: Chemically stabilized road mix sub base/base course

Important notes


The rate of dilution in each layer shall be _______or one part polymer-based chemical soil additive 5 to 9 parts of water.

1:5 to 1:9

70
New cards

item 206: Chemically stabilized road mix sub base/base course


Unit of measurement is

LITER

71
New cards

is a versatile, durable, composite material made by mixing a variety of mineral fillers with synthetic or natural resin binding agent

Polymer Concrete

72
New cards

what is item 207

Portland Cement Treated Plant Mix Base Course

73
New cards

item 207: Portland Cement Treated Plant Mix Base Course


important notes:


The salvaged or new soil aggregate shall be pulverized until ___________ of all material other than stone or gravel will pass a 4.75 mm or sieve No. 4

At least 80% mass percent

74
New cards

item 207: Portland Cement Treated Plant Mix Base Course


important notes:

The completed cement treated base shall be cured with a

Bituminous Curing Seal

75
New cards

item 207: Portland Cement Treated Plant Mix Base Course


important notes:


The rate of application of curing seal shall be between ________ and maintained at least ______

0.5 to 1 liter/m² ; 5 days

76
New cards

item 207: Portland Cement Treated Plant Mix Base Course


important notes:

Any material retained on a ________ and other unsuitable material shall be removed

50mm sieve (2”)

77
New cards

what is item 208

Aggregate Stockpile

78
New cards

is a large, organized heap of aggregate stored for use in construction projects

Aggregate Stockpile