Urban Planning and Transportation Engineering Examination Review

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/37

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering core concepts in transportation engineering, urban and regional planning, and national economic development from the Planning (Degree) Examination.

38 Terms

1
New cards

Route Assignment

The fourth step in conventional transport modeling that determines the specific route for each trip.

2
New cards

Transportation Forecasting

The process of estimating the number of travelers or vehicles that will use a given transportation facility in the future.

3
New cards

Trip Generation

The stage in transportation planning that estimates the number of trips produced from given origins and attracted to given destinations.

4
New cards

Trip Distribution

The transportation planning stage that determines the destination for each trip originating from a given zone.

5
New cards

Camber

The transverse slope or convexity provided to the road surface to ensure effective lateral drainage.

6
New cards

Super Elevation

The inward transverse inclination or amount by which the outer edge of a curve on a road or railway is banked above the inner edge to counteract centrifugal force.

7
New cards

Average Lane Width

A fundamental geometric design parameter of a highway or road cross-section.

8
New cards

Highway Traffic Noise Level Intensity

The acoustic noise level produced by a roadway, which depends on the kind of traffic, vehicle speed, and the hourly rate of vehicle movements.

9
New cards

Urban Collector Road Design Speed (IRC)

The standard design speed recommended by the Indian Roads Congress for collector streets in urban areas, which is 50 km/hr50\,\text{km/hr}.

10
New cards

Signal Cycle

The total duration of time taken to complete one full sequence of all signal display indications and phases.

11
New cards

Major Road Visibility Distance (50 km/hr50\,\text{km/hr}, 8 seconds8\,\text{seconds})

The sight distance required on a major road for a design speed of 50 km/hr50\,\text{km/hr} corresponding to an 8 seconds8\,\text{seconds} travel time, equal to 110 m110\,\text{m}.

12
New cards

Signalised Intersection Capacity Formula

The equation used to determine intersection capacity given by Capacity=g×sc vehicles per hour\text{Capacity} = \frac{g \times s}{c}\,\text{vehicles per hour}, where gg is green time, ss is saturation flow, and cc is cycle time.

13
New cards

Highway Conflict

The point at which a highway user crossing, merging with, or diverging from a road or driveway conflicts with another highway user using the same road or driveway.

14
New cards

Cycle Track Minimum Width (IRC)

The minimum roadway width allocated for a dedicated bicycle track as prescribed by the Indian Roads Congress, equal to 1.5 m1.5\,\text{m}.

15
New cards

Theoretical Lane Capacity (50 kmph50\,\text{kmph}, 18 m18\,\text{m} Spacing)

The maximum theoretical flow rate of a one-way traffic lane with an average centre-to-centre vehicle spacing of 18 m18\,\text{m} at 50 kmph50\,\text{kmph}, calculated as 2778 vehicles per hour2778\,\text{vehicles per hour}.

16
New cards

Traffic Actuated Signal

A traffic control signal whose phase timings vary in each cycle in direct response to detected vehicular and pedestrian demand.

17
New cards

Minimum Length of Overtaking Zone (96 kmph96\,\text{kmph})

The required length of an overtaking section on a one-way road designed for 96 kmph96\,\text{kmph} (with acceleration of 0.69 m/s20.69\,\text{m/s}^2 and reaction time of 2 sec2\,\text{sec}), which equals 1026 m1026\,\text{m}.

18
New cards

Grade Effect on Overtaking Sight Distance

The longitudinal gradient effect that increases the safe overtaking sight distance on descending grades and decreases it on ascending grades.

19
New cards

Minimum Spacing of Vehicles

The longitudinal clearance maintained between vehicles in a traffic stream, which increases as the speed of the traffic stream increases.

20
New cards

Vehicle Length Influence

The vehicle dimension that directly governs the extra widening of pavements required on curves and determines the minimum turning radius.

21
New cards

Traffic Volume Equation

The fundamental macroscopic traffic flow relationship defining traffic volume as Traffic Volume=Traffic Density×Traffic Speed\text{Traffic Volume} = \text{Traffic Density} \times \text{Traffic Speed}.

22
New cards

Maximum Lane Capacity Variation

The operational response of maximum lane capacity to increasing speed, which first increases and then decreases after reaching a maximum value at optimum speed.

23
New cards

Theoretical Maximum Capacity (10 m/s10\,\text{m/s}, 18 m18\,\text{m} Stopping Distance, 6 m6\,\text{m} Length)

The traffic capacity calculated under a speed of 10 m/s10\,\text{m/s}, vehicle length of 6 m6\,\text{m}, and stopping distance of 18 m18\,\text{m}, equal to 1500 vehicles per hour1500\,\text{vehicles per hour}.

24
New cards

Jam Density Condition

The traffic state where vehicle speed falls to zero, causing traffic density to reach its maximum value while traffic volume drops to zero.

25
New cards

Basic Lane Capacity (50 kmph50\,\text{kmph}, 20 m20\,\text{m} Spacing)

The maximum number of vehicles passing a point per hour with an average centre-to-centre vehicle spacing of 20 m20\,\text{m} at 50 kmph50\,\text{kmph}, equal to 2500 vehicles per hour2500\,\text{vehicles per hour}.

26
New cards

Urban Area Criteria in India

The official census parameters used to define an urban settlement, comprising population size, population density, and the percentage of the male working population engaged in non-agricultural pursuits.

27
New cards

Formal Regions

Geographical territories defined and bounded by internal homogeneity in their physical environment and natural resources.

28
New cards

Functional Regions

Geographical areas demarcated by dynamic interdependence, movement patterns, and strong economic linkages.

29
New cards

Slum Networking

A planning concept that aims to promote holistic physical and social improvements across entire slum settlements by integrating infrastructure networks.

30
New cards

Eminent Domain

The sovereign legal power of the state to expropriate, acquire, and take possession of private property in order to serve the public interest.

31
New cards

Land Pooling

A land development mechanism involving the assembly of privately owned land parcels for infrastructure provision, replanning, and redistribution to original owners.

32
New cards

Incentive Zoning

A zoning system that awards additional Floor Area Ratio (FAR) or development rights to developers in exchange for the provision of public spaces or amenities.

33
New cards

HRIDAY

A central urban development program by the Government of India standing for Heritage City Development and Augmentation Yojana.

34
New cards

Perspective Plan (URDPFI Guidelines)

A long-term strategic spatial development framework prepared for a plan period of 20–30 Years20\text{--}30\,\text{Years} as per URDPFI guidelines.

35
New cards

Twelfth Five Year Plan Objective

The overarching vision adopted for India's 12th Plan (2012–2017), defined as 'Faster, sustainable and more inclusive growth.'

36
New cards

Economic Planning

The deliberate public mechanism responsible for the coordinated allocation of economic resources to attain designated growth targets.

37
New cards

Origin of Five Year Plans (India)

The Union of Soviet Socialist Republics (USSR), from which India adopted the model of centralized five-year developmental planning.

38
New cards

Architect of the Second Five Year Plan

Prasanta Chandra Mahalanobis, the Indian statistician who formulated the economic development model focused on rapid industrialization and heavy industries.