Practice flashcards covering core production, operations management, supply chain, and facility planning concepts from BA 101 Class 7.

70 Terms

1
New cards

Production

Creating goods using land, labor, materials, capital, entrepreneurship, and knowledge.

2
New cards

Production management

Activities managers perform to help a firm create goods.

3
New cards

Operations management

Managing the transformation of resources into goods and services; includes scheduling, inventory, quality, and follow-up.

4
New cards

Main takeaway of operations

Products are created and distributed through many connected processes and suppliers.

5
New cards

Operations management goals

Meet customer demand with high-quality products, efficient processes, fewer delays, and lower costs.

6
New cards

Inputs to production

Land, labor, materials, capital, entrepreneurship, and knowledge.

7
New cards

Production control steps

Planning, routing, scheduling, dispatching, and follow-up.

8
New cards

Outputs of operations

Goods, services, and ideas.

9
New cards

Process manufacturing

Physically or chemically changing materials; example: shaping plastic using heat and pressure.

10
New cards

Process manufacturing example

Shaping plastic using heat and pressure.

11
New cards

Assembly process

Putting separate components together; example: assembling parts into a hot tub.

12
New cards

Assembly process example

Assembling parts into a hot tub.

13
New cards

Continuous production

Long runs producing goods over time; example: a beverage bottling line.

14
New cards

Continuous production example

A beverage bottling line.

15
New cards

Intermittent production

Short runs with frequent machine adjustments to make different products.

16
New cards

Supply chain

Connected suppliers, production sites, transport, and distribution steps that move materials and products.

17
New cards

Hot tub case: parts

The lecture example uses about 1,850 parts sourced across 7 countries and 14 states.

18
New cards

Hot tub case: transport

Parts arrive by container ship, truck, and train; delays at any stage can affect production.

19
New cards

Supply-chain bottleneck

A shortage or delay at one stage that slows the rest of production or delivery.

20
New cards

CAD (Computer-Aided Design)

Computer software used to design products, including accurate 2D and 3D drawings.

21
New cards

CAM (Computer-Aided Manufacturing)

Computers used to control or support the manufacturing of products.

22
New cards

CAD versus CAM

CAD designs the product; CAM helps manufacture it.

23
New cards

CIM (Computer-Integrated Manufacturing)

Integrates CAD and CAM; costly but can sharply reduce machine-programming time.

24
New cards

Flexible manufacturing

Machines can switch tasks or make different products with relatively quick adjustments.

25
New cards

Mass customization

Making products at scale while tailoring selected features to individual customers.

26
New cards

Mass customization example

Customers customize shoe colors or features while the underlying shoe design stays standardized.

27
New cards

Robotics benefits

Can operate around the clock, perform repetitive work, lower labor costs, and improve consistency.

28
New cards

Sensors in manufacturing

Detect production problems quickly so changes can be made.

29
New cards

Nanomanufacturing

Manipulating materials at the molecular level.

30
New cards

Facility location

Choosing where operations occur; costs, labor, suppliers, and logistics matter.

31
New cards

Outsourcing

Using outside companies to perform work or supply goods or services.

32
New cards

Remote work

Performing work away from the workplace using computers and communication technology.

33
New cards

Facility layout

Physical arrangement of workers, equipment, and resources for efficient production or service.

34
New cards

Assembly-line layout

Workers or stations each perform a small number of repeated tasks as products move along.

35
New cards

Modular layout

Teams or work cells produce more complex units of the final product.

36
New cards

Fixed-position layout

The product stays in one place while workers and equipment come to it.

37
New cards

Fixed-position example

Building an aircraft or a large ship where moving the product is difficult.

38
New cards

Purchasing

Finding high-quality materials and suppliers and negotiating favorable prices.

39
New cards

Inventory control

Managing how much material or stock is held and when to replenish it.

40
New cards

JIT (Just-in-Time inventory)

Keeping minimal inventory and receiving parts right when needed for production.

41
New cards

JIT requirement

Excellent supplier coordination and reliable delivery timing.

42
New cards

JIT risk

A delayed shipment can halt production because little backup inventory is stored.

43
New cards

ERP (Enterprise Resource Planning)

Integrated software for coordinating business information and resources across departments.

44
New cards

Materials requirements planning

Determining what materials are needed, how much, and when for planned production.

45
New cards

Quality control

Ensuring products consistently meet customer needs and reducing errors.

46
New cards

Six Sigma quality

A quality benchmark of 3.4 defects per million opportunities.

47
New cards

Lean manufacturing

Producing with fewer resources and less waste while maintaining customer value.

48
New cards

Lean manufacturing examples

Less inventory, less floor space, less effort, and fewer defects than traditional mass production.

49
New cards

PERT (Program Evaluation and Review Technique)

Plans project tasks and estimates completion time.

50
New cards

PERT steps

List and sequence tasks; estimate task times; draw network; identify critical path.

51
New cards

Critical path

Longest sequence of dependent tasks; determines shortest possible project completion time.

52
New cards

Gantt chart

Bar chart showing project tasks, timelines, and completion progress.

53
New cards

PERT versus Gantt

PERT emphasizes dependencies and critical path; Gantt shows tasks on a timeline.

54
New cards

Mike's Bikes: competitor analysis

Compare competitors and consider how pricing, marketing, and other choices affect results.

55
New cards

Mike's Bikes: market research

Use research on awareness, price, and customer preferences to guide decisions.

56
New cards

Mike's Bikes: retail price

Price affects demand, revenue per bike, and competitiveness; a low price may boost unit demand.

57
New cards

Mike's Bikes: sales forecast

Estimate units likely to sell before deciding production and inventory.

58
New cards

Mike's Bikes: advertising

Allocate budget among channels such as social media and search based on target customers.

59
New cards

Mike's Bikes: shareholder value

Aim to improve business performance and value for shareholders over time.

60
New cards

Mike's Bikes: inventory planning

Compare projected demand with existing stock to avoid overproduction or shortages.

61
New cards

Supplier oversight

Operations managers purchase parts, supervise suppliers, and try to prevent delays.

62
New cards

Efficiency in operations

Improving processes can reduce production cost while preserving customer experience.

63
New cards

Scenario: factory shapes raw plastic

Process manufacturing: the material is physically changed.

64
New cards

Scenario: factory joins finished parts

Assembly process: separate components are put together.

65
New cards

Scenario: custom orders in short batches

Intermittent production: short runs and frequent adjustments.

66
New cards

Scenario: identical bottles all day

Continuous production: long runs of the same product.

67
New cards

Scenario: workers travel to a large product

Fixed-position layout: the product remains stationary.

68
New cards

Scenario: parts arrive just before assembly

JIT inventory: minimal stored inventory and precise deliveries.

69
New cards

Scenario: a project has dependent tasks

Use PERT (Program Evaluation and Review Technique) to identify sequencing and the critical path.

70
New cards

Scenario: track project progress by date

Use a Gantt chart to see task schedules and completion.