Practice flashcards covering core production, operations management, supply chain, and facility planning concepts from BA 101 Class 7.
Production
Creating goods using land, labor, materials, capital, entrepreneurship, and knowledge.
Production management
Activities managers perform to help a firm create goods.
Operations management
Managing the transformation of resources into goods and services; includes scheduling, inventory, quality, and follow-up.
Main takeaway of operations
Products are created and distributed through many connected processes and suppliers.
Operations management goals
Meet customer demand with high-quality products, efficient processes, fewer delays, and lower costs.
Inputs to production
Land, labor, materials, capital, entrepreneurship, and knowledge.
Production control steps
Planning, routing, scheduling, dispatching, and follow-up.
Outputs of operations
Goods, services, and ideas.
Process manufacturing
Physically or chemically changing materials; example: shaping plastic using heat and pressure.
Process manufacturing example
Shaping plastic using heat and pressure.
Assembly process
Putting separate components together; example: assembling parts into a hot tub.
Assembly process example
Assembling parts into a hot tub.
Continuous production
Long runs producing goods over time; example: a beverage bottling line.
Continuous production example
A beverage bottling line.
Intermittent production
Short runs with frequent machine adjustments to make different products.
Supply chain
Connected suppliers, production sites, transport, and distribution steps that move materials and products.
Hot tub case: parts
The lecture example uses about 1,850 parts sourced across 7 countries and 14 states.
Hot tub case: transport
Parts arrive by container ship, truck, and train; delays at any stage can affect production.
Supply-chain bottleneck
A shortage or delay at one stage that slows the rest of production or delivery.
CAD (Computer-Aided Design)
Computer software used to design products, including accurate 2D and 3D drawings.
CAM (Computer-Aided Manufacturing)
Computers used to control or support the manufacturing of products.
CAD versus CAM
CAD designs the product; CAM helps manufacture it.
CIM (Computer-Integrated Manufacturing)
Integrates CAD and CAM; costly but can sharply reduce machine-programming time.
Flexible manufacturing
Machines can switch tasks or make different products with relatively quick adjustments.
Mass customization
Making products at scale while tailoring selected features to individual customers.
Mass customization example
Customers customize shoe colors or features while the underlying shoe design stays standardized.
Robotics benefits
Can operate around the clock, perform repetitive work, lower labor costs, and improve consistency.
Sensors in manufacturing
Detect production problems quickly so changes can be made.
Nanomanufacturing
Manipulating materials at the molecular level.
Facility location
Choosing where operations occur; costs, labor, suppliers, and logistics matter.
Outsourcing
Using outside companies to perform work or supply goods or services.
Remote work
Performing work away from the workplace using computers and communication technology.
Facility layout
Physical arrangement of workers, equipment, and resources for efficient production or service.
Assembly-line layout
Workers or stations each perform a small number of repeated tasks as products move along.
Modular layout
Teams or work cells produce more complex units of the final product.
Fixed-position layout
The product stays in one place while workers and equipment come to it.
Fixed-position example
Building an aircraft or a large ship where moving the product is difficult.
Purchasing
Finding high-quality materials and suppliers and negotiating favorable prices.
Inventory control
Managing how much material or stock is held and when to replenish it.
JIT (Just-in-Time inventory)
Keeping minimal inventory and receiving parts right when needed for production.
JIT requirement
Excellent supplier coordination and reliable delivery timing.
JIT risk
A delayed shipment can halt production because little backup inventory is stored.
ERP (Enterprise Resource Planning)
Integrated software for coordinating business information and resources across departments.
Materials requirements planning
Determining what materials are needed, how much, and when for planned production.
Quality control
Ensuring products consistently meet customer needs and reducing errors.
Six Sigma quality
A quality benchmark of 3.4 defects per million opportunities.
Lean manufacturing
Producing with fewer resources and less waste while maintaining customer value.
Lean manufacturing examples
Less inventory, less floor space, less effort, and fewer defects than traditional mass production.
PERT (Program Evaluation and Review Technique)
Plans project tasks and estimates completion time.
PERT steps
List and sequence tasks; estimate task times; draw network; identify critical path.
Critical path
Longest sequence of dependent tasks; determines shortest possible project completion time.
Gantt chart
Bar chart showing project tasks, timelines, and completion progress.
PERT versus Gantt
PERT emphasizes dependencies and critical path; Gantt shows tasks on a timeline.
Mike's Bikes: competitor analysis
Compare competitors and consider how pricing, marketing, and other choices affect results.
Mike's Bikes: market research
Use research on awareness, price, and customer preferences to guide decisions.
Mike's Bikes: retail price
Price affects demand, revenue per bike, and competitiveness; a low price may boost unit demand.
Mike's Bikes: sales forecast
Estimate units likely to sell before deciding production and inventory.
Mike's Bikes: advertising
Allocate budget among channels such as social media and search based on target customers.
Mike's Bikes: shareholder value
Aim to improve business performance and value for shareholders over time.
Mike's Bikes: inventory planning
Compare projected demand with existing stock to avoid overproduction or shortages.
Supplier oversight
Operations managers purchase parts, supervise suppliers, and try to prevent delays.
Efficiency in operations
Improving processes can reduce production cost while preserving customer experience.
Scenario: factory shapes raw plastic
Process manufacturing: the material is physically changed.
Scenario: factory joins finished parts
Assembly process: separate components are put together.
Scenario: custom orders in short batches
Intermittent production: short runs and frequent adjustments.
Scenario: identical bottles all day
Continuous production: long runs of the same product.
Scenario: workers travel to a large product
Fixed-position layout: the product remains stationary.
Scenario: parts arrive just before assembly
JIT inventory: minimal stored inventory and precise deliveries.
Scenario: a project has dependent tasks
Use PERT (Program Evaluation and Review Technique) to identify sequencing and the critical path.
Scenario: track project progress by date
Use a Gantt chart to see task schedules and completion.