Chapter 21 - Operations Management Tools & Technique

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/68

encourage image

There's no tags or description

Looks like no tags are added yet.

69 Terms

1
New cards

What is a queueing system?


A system in which customers wait in a line to receive service.

2
New cards

What is a single-channel, single-phase queue?

A queue with one service facility and one stage of service.

3
New cards

What is a multiple-channel, single-phase queue?


Multiple service facilities operate simultaneously, with each customer receiving service from only one facility.

4
New cards

What is a multiple-parallel-server system with multiple queues?


Each server has its own separate queue, and customers are served independently.

5
New cards

What is a service facility in a series?


A system in which customers pass through different service centres sequentially.

6
New cards

What is FIFO?


First In First Out – the customer who arrives first is served first.

7
New cards

What is LIFO?


Last In First Out – the customer who arrives last is served first.

8
New cards

What is SIRO?


Service In Random Order – customers are served randomly.

9
New cards

What is reneging in queueing theory?


When a customer joins a queue but leaves before receiving service.

10
New cards

What is balking?


When a customer decides not to join a queue after observing its length.

11
New cards

What is service rate (μ)?


The number of customers served per unit of time.

12
New cards

What is arrival rate (λ)?


The number of customers arriving per unit of time.

13
New cards

What is the relationship between service rate and service time?


They are reciprocals of each other.

<p>They are reciprocals of each other.</p>
14
New cards

What is a deterministic queueing model?


A model in which customer arrival times and service times are known with certainty.

15
New cards

What happens when λ is greater than μ in a deterministic queueing model?


A waiting line forms, and the system may fail.

16
New cards

What happens when λ is less than or equal to μ?


No waiting line forms under the simplified deterministic model.

17
New cards

What is the average utilisation or traffic intensity?


The proportion of time the service facility is busy.

<p>The proportion of time the service facility is busy.</p>
18
New cards

What happens when traffic intensity (ρ) exceeds 1?


The system becomes unstable.

19
New cards

What happens when traffic intensity (ρ) is less than 1?


The system operates properly under the standard steady-state model.

20
New cards

What is a probabilistic queueing model?


A model in which customer arrival rates and service times are probabilistic rather than certain.

21
New cards

Which distribution is commonly used for customer arrivals in a probabilistic queueing model?


Poisson distribution.

22
New cards

Which distribution is commonly used for service times?


Exponential distribution.

23
New cards

What is the probability that exactly n customers arrive during a given time interval?


<p></p>
24
New cards

What is the probability that no customer arrives during time T?

knowt flashcard image
25
New cards

What is the formula for expected time in the system?

knowt flashcard image
26
New cards

What is the expected waiting time in the queue?

knowt flashcard image
27
New cards

What is the expected number of customers in the system?

knowt flashcard image
28
New cards

What is the expected length of the waiting line?

knowt flashcard image
29
New cards

What is the probability of having more than K customers in the system?

knowt flashcard image
30
New cards

What are the principles used in decision-making under uncertainty?


Maximax principle

Maximin principle

Laplace principle

Hurwicz principle

31
New cards

What is the Maximax principle?


An optimistic decision-making criterion that selects the alternative with the highest possible payoff.

32
New cards

What is the Maximin principle?


A pessimistic decision-making criterion that selects the alternative with the best worst-case payoff.

33
New cards

What is the Laplace principle?


Assumes all states of nature are equally likely and selects the alternative with the highest average payoff.

34
New cards

What is the Hurwicz principle?


A criterion that combines optimism and pessimism using a coefficient of optimism.

35
New cards

What are the decision criteria under risk?


Maximum likelihood principle

Expectation principle

Posterior analysis or Bayesian rule

36
New cards

What is the Maximum Likelihood principle?


Selects the alternative that gives the highest payoff under the most probable state of nature.

37
New cards

What is the Expectation principle?


Selects the alternative with the highest expected monetary value (EMV).

38
New cards

What is EVPI?


Expected Value of Perfect Information – the maximum amount a decision-maker should be willing to pay for perfect information.

39
New cards

What does PERT stand for?


Programme Evaluation and Review Technique.

40
New cards

What does CPM stand for?


Critical Path Method.

41
New cards

Who developed PERT?


PERT was developed by the US Navy's Polaris missile project team.

42
New cards

Who developed CPM?


James E. Kelley Jr. and Morgan R. Walker.

43
New cards

What is PERT?


A project management technique used for planning, scheduling and controlling projects involving uncertain activity durations.

44
New cards

What is CPM?


A project management technique used to identify the longest path and critical activities in a project, generally using deterministic activity times.

45
New cards

What is the critical path?


The longest-duration path between the starting and ending events of a project.

46
New cards

What is the significance of the critical path?


It determines the minimum time required to complete the entire project.

47
New cards

How is an activity represented in an AOA network?


By an arrow (→).

48
New cards

What is an event in PERT?


A point in time representing the beginning or completion of an activity. It does not consume time or resources.

49
New cards

What is a tail event?


The event from which an activity begins.

50
New cards

What is a head event?

The event at which an activity ends.

51
New cards

What is a merge event?


An event where two or more activities are completed.

52
New cards

What is a burst event?


An event from which two or more activities originate.

53
New cards

What is a dummy activity?


An artificial activity represented by a dashed arrow, used to show logical dependency. It consumes neither time nor resources.

54
New cards

What are the three time estimates used in PERT?


Optimistic time (a)

Most likely time (m)

Pessimistic time (b)

55
New cards

What is optimistic time?


The minimum time required to complete an activity under ideal conditions.

56
New cards

What is most likely time?


The time required under normal working conditions.

57
New cards

What is pessimistic time?


The maximum time required under unfavourable conditions.

58
New cards

What is the expected time formula in PERT?

knowt flashcard image
59
New cards

What is the variance formula in PERT?

knowt flashcard image
60
New cards

What is the standard deviation formula in PERT?

knowt flashcard image
61
New cards

What is earliest start time (ES)?


The earliest time at which an activity can begin.

62
New cards

What is earliest finish time (EF)?


The earliest time at which an activity can be completed.


EF = ES + Activity Duration

63
New cards

What is latest finish time (LF)?


The latest time an activity can finish without delaying the project.

64
New cards

What is latest start time (LS)?


The latest time an activity can begin without delaying the project.


LS = LF - Activity Duration

65
New cards

What is total float?


The amount of time an activity can be delayed without delaying the overall project completion.


TF = LS - ES = LF - EF

66
New cards

What is free float?


The time an activity can be delayed without affecting the earliest start time of its succeeding activity.


FF = ES next activity - EF current activity

67
New cards

What is the float of a critical activity?


Zero total float.

68
New cards

What is a PERT network?


A graphical representation of project activities and their logical dependencies.

69
New cards

What is the difference between PERT and CPM?

PERT CPM

Probabilistic Deterministic

Three time estimates. One time estimate

Suitable for uncertain projects Suitable for relatively predictable projects

Event-oriented traditionally Activity-oriented traditionally