1/21
Looks like no tags are added yet.
Cost-Plus Pricing
Companies charge customers a certain percentage above their costs for goods and services.
Job Costing/Job-Order Costing
A way to assign costs to unique products. Works well for companies that produce goods and services
Activity-Based Costing
Builds on the basis of job costing. Assigns costs in a more targeted way on the basis of cost-driving activities. Used by companies that have high amounts of overhead costs and varying products and volume.
Process Costing
Accumulates cost by production process. Ideal for companies that produce mass quantities of the same product.
What costs are included in manufacturing overhead?
Indirect materials, indirect labor, and all other indirect production costs.
Allocated Manufacturing Overhead
An estimate of manufacturing overhead costs.
It’s recorded by crediting the Manufacturing Overhead account.
Job Cost Sheet
Details when a job was started and completed, basic information about the job and all production costs associated with the job.
Actual Costing
Costs are calculated by summing actual direct materials, actual direct labor, and actual manufacturing overhead.
Normal Costing
This is when firms use an estimate of manufacturing overhead.
How to determine predetermined overhead rate?
Estimate total manufacturing overhead costs for overhead costs for a reporting period.
Estimate the allocation or application base. Can be things like direct material, direct labor, or direct machine hours.
Total estimated manufacturing overhead costs/Estimated allocation base
Cost Driver
An allocation base that is associated with production costs.
How to tell if Manufacturing Overhead was overapplied or underapplied?
If Manufacturing Overhead has a debit balance it was underapplied. If it has a credit, it was overapplied.
Adjusting Manufacturing Overhead
There are two options:
Adjust Cost of goods sold. (debit if overapplied, credit if underapplied).
Adjust the inventory accounts proportionally. So add up the totals f work-in-process inventory, finished goods inventory, and cost of goods sold. Then divide each inventory by the total. This percentage is then multiplied by the amount of overhead overapplied/underapplied. Then adjust accordingly.
Single-Stage Overhead Allocation
A single allocation base is used. Then overhead is allocated based on that base.
Two-Stage Overhead Allocation
Subdivide manufacturing overhead into cost pools based on allocation bases/
Compute allocation rates for each cost pool and multiply by actual base.
Activity Based Costing
A two-stage costing system that assigns indirect costs to activities and then allocates activity costs to cost objects such as jobs or products.
Very big on cause and effect. There has to be a relationship between the cost and the activity.
What are the different activity cost pools?
Unit-Level Costs
Batch-Level Costs
Product Line-Level Costs
Facility Level Costs
Unit Level Costs
These are tied to production volume and rise with each unit produced.
Batch-Level Costs
Costs incurred on a group of jobs or products.
Product Line-Level Costs
Associated with producing a line of product or services. This includes things like product engineering costs and costs of patenting a product design.
Facility-Level Costs
True fixed costs. So things like building depreciation and factory rent.
How to determine a job’s cost using activity based costing?
Group costs by cost pool.
Allocating costs to cost objects.