BCP and DR

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/28

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:31 PM on 9/13/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

29 Terms

1
New cards

Business Continuity Planning (BCP)

A strategic process of assessing risks to organizational processes and creating plans to minimize the impact of realized risks.

2
New cards

Redundancy

A tactical approach involving the implementation of multiple systems to perform the same task, eliminating single points of failure.

3
New cards

Disaster Recovery (DR)

The technical solution designed to enact specific BCP scenarios in the event of a disaster, with a primary focus on data restoration.

4
New cards

Four Primary Steps of BCP

Project Scope & Planning, Business Impact Analysis, Continuity Planning, and Approval and Implementation.

5
New cards

Business Organization Analysis Purpose

To identify every department and individual with a stake in the BCP process to ensure representatives from every group are selected.

6
New cards

Identifying 'Crown Jewels'

Evaluated through qualitative and quantitative decision-making during a Business Impact Analysis to determine the most critical applications.

7
New cards

RTO vs. MTD Relationship

RTO is time to restore a system; MTD is total time a business can survive without it. Recovery strategy ensures RTO is less than MTD.

8
New cards

Six Key Stages of Incident Response (IR)

Preparation, Detection & Analysis, Containment, Eradication, Recovery, and Lessons Learned.

9
New cards

Importance of Top Executive Approval

Promotes buy-in and cooperation across departments and provides authority to deploy resources for plan implementation.

10
New cards

Advantages and Disadvantages of Redundancy

Ensures no single points of failure, but can become very expensive to maintain multiple systems for the same task.

11
New cards

Hot, Warm, and Cold Failover Scenarios

Hot is running and sharing load; Warm is ready but takes time to activate; Cold is not running and takes days or weeks to bring online.

12
New cards

DR Site Geographical Location Factors

Ensure a single regional event (e.g., hurricane) cannot affect both the main site and the DR site by using different cities, states, or the cloud.

13
New cards

Chaos Engineering

The discipline of experimenting on a distributed system to build confidence in its ability to withstand turbulent production conditions.

14
New cards

Asset Value (AV)

The qualitative or quantitative value assigned to a specific business asset.

15
New cards

Business Impact Analysis (BIA)

A BCP step used to identify priorities, critical applications ('Crown Jewels'), and recovery objectives.

16
New cards

Differential Backup

A data backup strategy that saves all information that has changed since the last full backup.

17
New cards

Failover

The process of switching to a redundant system (Hot, Warm, or Cold) when a primary system fails.

18
New cards

Incremental Backup

A data backup strategy that saves only the information that has changed since the last incremental backup.

19
New cards

Playbook

Detailed, step-by-step instructions generated for specific identified risks to guide incident response.

20
New cards

RAID

Redundant Array of Independent Disks; the use of multiple drives that appear as one to an OS, used for speed and redundancy.

21
New cards

Recovery Point Objective (RPO)

The maximum age of files that must be recovered from backup storage for operations to resume.

22
New cards

Service-Level Agreement (SLA)

A contract between a service provider and a customer that defines the level of service expected.

23
New cards

UPS (Uninterruptible Power Supply)

A device that provides emergency power when the main power source fails.

24
New cards

Resource Prioritization

Ordering the risk list in descending priority and assigning resources until out.

25
New cards

Incident Response (IR)

The process for detecting, analyzing, containing, and recovering from a security threat.

26
New cards

Full Backup Strategy

A data backup method that creates a complete backup every time.

27
New cards

Separation of Duties in DR

Ensuring different people have access to production systems and DR data.

28
New cards

Simian Army (Netflix)

Chaos engineering programs like ChaosMonkey that delete servers, zones, or regions.

29
New cards

Disaster Recovery Drills

Periodic, realistic exercises conducted quarterly, semi-annually, or annually.