AVMG 408 Part 139 (Part 1)

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/49

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 6:20 PM on 10/11/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

50 Terms

1
New cards

Part 139 Primary Objective

Ensure safety in air transportation by regulating airport operation and maintenance.

2
New cards

Scheduled Operations Part 139 Threshold

Passenger-carrying aircraft designed for more than 9 passenger seats.

3
New cards

Unscheduled Operations Part 139 Threshold

Passenger-carrying aircraft designed for at least 31 passenger seats.

4
New cards

Class 1 Airport

Scheduled operations of large air carriers (31 seats or more).

5
New cards

Class 2 Airport

Scheduled small air carrier operations (10-30 seats) and unscheduled large air carrier operations.

6
New cards

Class 3 Airport

Only scheduled small air carrier operations (10-30 seats).

7
New cards

Class 4 Airport

Only unscheduled operations of large air carrier aircraft (31 seats or more).

8
New cards

Airport Certification Manual (ACM)

A document explaining how an airport complies with Part 139.

9
New cards

ACM Approval Levels

Approved by both the Airport Operator and the FAA.

10
New cards

Airport Operating Certificate (AOC)

Issued by FAA upon approving the ACM, identifying the airport class.

11
New cards

ACM Compliance Responsibility

Placed directly on the airport operator.

12
New cards

Part 139 Operational Window

Must comply from 15 minutes before until 15 minutes after air carrier operations.

13
New cards

Unsafe Conditions Responsibility

Operator must halt air carrier operations if unsafe conditions exist.

14
New cards

Deviation Definition

Departing from Part 139 regulatory requirements due to emergency conditions.

15
New cards

Deviation Reporting

Manager must inform the FAA in writing within 14 days of occurrence if requested.

16
New cards

Poor Planning and Deviations

Poor planning is never considered a valid deviation.

17
New cards

Core of Part 139

The self-inspection process conducted primarily by the airport operator.

18
New cards

Daily Inspection Areas

Includes pavement, safety areas, lighting, fueling, nav aids, ARFF, and wildlife.

19
New cards

Continuous Inspection Activities

Fueling, construction, vehicles, snow/ice, public protection, wildlife, and FOD.

20
New cards

Periodic Condition Inspection Intervals

Weekly, monthly, or quarterly depending on the specific activity or facility.

21
New cards

Periodic Condition Evaluation Examples

Rubber buildup, tree growth, faded signs, nav aids, and ARFF response times.

22
New cards

Special Inspection Triggers

Conducted after complaints, unusual meteorological events, or aircraft accidents/incidents.

23
New cards

Inspector Training Area 1

Airport familiarization.

24
New cards

Inspector Training Area 2

The Airport Emergency Plan (AEP).

25
New cards

Inspector Training Area 3

NOTAM procedures.

26
New cards

Inspector Training Area 4

Pedestrian and ground vehicle procedures in movement areas.

27
New cards

Inspector Training Area 5

Airport inspection procedures, techniques, and discrepancy reporting.

28
New cards

Inspector Training Area 6

Correct radio communication phraseology and procedures from the AIM.

29
New cards

Self-Inspection Training Frequency

Must occur at least every 12 months.

30
New cards

Self-Inspection Training Records

Must be kept for 24 consecutive months.

31
New cards

Inspection Records Retention

Must be kept for 12 months.

32
New cards

Grant Assurances 11 and 19

Obligations for effective pavement maintenance and management programs over pavement life.

33
New cards

Pavement Management Program (PMP)

Regular or recurring work necessary to sustain pavement in good condition.

34
New cards

PMP Routine Work Examples

Cleaning, crack sealing, patching, seal coating, edge grading, and marking restoration.

35
New cards

Pavement Rehabilitation Timing

Rehabilitating at 11-15 years extends life at lower cost than replacing at 20.

36
New cards

Asphalt Signs of Failure Categories

Cracking, disintegration, distortion, and loss of skid resistance.

37
New cards

Longitudinal vs Transverse Cracking

Longitudinal is more severe because aircraft tires can get stuck.

38
New cards

Pavement Hole Definition

Opening >5 inches wide, >3 inches deep, with side slope >45 degrees.

39
New cards

Pavement Friction Evaluation Frequency

Airports with jet traffic should schedule annual friction evaluations.

40
New cards

Friction Measuring Equipment Types

Decelerometers (DEC) and Continuous Friction Measuring Equipment (CFME).

41
New cards

Dynamic Hydroplaning Cause

A wedge of water builds up in front of tires, lifting them off.

42
New cards

Viscous Hydroplaning Cause

Oil or rubber combined with water forms an impenetrable liquid layer.

43
New cards

Runway Grooving Benefits

Reduces hydroplaning, maintains tire contact, and aids directional and braking control.

44
New cards

Rubber Removal Methods

Chemical solvents, high-pressure water, and high-velocity impact methods (shot blasting).

45
New cards

Airport Condition Reporting Rule

Section 139.339 requires timely collection and dissemination of deficient conditions.

46
New cards

NOTAM Primary System

Notice to Air Missions used to convey safety information to airport users.

47
New cards

ARFF Structural Fire Requirements

Part 139 does not require minimum personnel or equipment for structural fires.

48
New cards

ARFF Index Calculation Criteria

Based on longest air carrier aircraft length and frequency of service.

49
New cards

Dry Chemical ARFF Agent Action

Directly inhibits the chemical chain reaction of the fire tetrahedron (e.g., Purple K).

50
New cards

AFFF Extinguishing Agent Mechanism

Foam blanket blocks oxygen, liquid forms aqueous film, water cools, expands 6-10x.