URP 3510 Study Guide - Specific Plans, Subdivision Map Act, and CEQA

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/22

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering Specific Plans, the Subdivision Map Act, and CEQA concepts from URP 3510 Quiz 2 review.

Last updated 11:03 AM on 10/7/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

23 Terms

1
New cards

Specific Plan (SP)

A planning instrument that implements the General Plan (GP) for a particular geographic area by providing a focused vision and customized zoning, development standards, and guidelines.

2
New cards

RED (Resolution)

The formal approval or certification of an environmental document associated with a specific plan.

3
New cards
<p>OSP (Ordinance Specific Plan)</p>

OSP (Ordinance Specific Plan)

The official approval of a specific plan enacted through local ordinance.

4
New cards

Specific Plan Standards

Mandatory, legally binding development requirements that a project MUST satisfy, including maximum building heights, minimum parking ratios, setbacks, and floor area ratios.

<p>Mandatory, legally binding development requirements that a project MUST satisfy, including maximum building heights, minimum parking ratios, setbacks, and floor area ratios.</p>
5
New cards

Specific Plan Guidelines

Flexible advisory recommendations that a project SHOULD try to meet, such as preferred architectural styles and street furniture types.

6
New cards
<p>Specific Plan Applications</p>

Specific Plan Applications

Focus types for specific plans, including Master Planned Communities, Large Scale Multiple Owners, and Revitalization or TOD (Transit-Oriented Development).

7
New cards
<p>Subdivision</p>

Subdivision

The division of any unit or units of improved or unimproved land, or any portion shown on the latest assessment roll as a unit or as contiguous units, for the purpose of sale, lease, or financing.

8
New cards

Vesting Tentative Tract Map

A type of subdivision map similar to a Tentative Map, except that its approval confers a vested, absolute right to proceed with development in compliance with codes in place at the time of approval.

9
New cards

Final (Tract) Map

A map in substantial conformance with an approved or conditionally approved Tentative Tract Map (TTM), prepared in compliance with the City Subdivision Code and the Subdivision Map Act.

10
New cards

Parcel Map

A map required for the subdivision of 44 or fewer parcels, which does not require city or county engineer approval or a public hearing after original approval.

11
New cards
<p>Tract Map</p>

Tract Map

A map required for the subdivision of 55 or more parcels, requiring approval from both the City/County Engineer and the City Council/Board of Supervisors, as well as a public hearing.

12
New cards

Numbered Lots

Lots designated on a subdivision map that are privately owned.

13
New cards

Lettered Lots

Lots designated on a subdivision map that are community owned.

14
New cards

CEQA Mitigation Measures

Actions designed to avoid, minimize, rectify, reduce or eliminate, or compensate for potential environmental damage caused by a project.

15
New cards

Statutory Exemption

A CEQA exemption where an entire class of projects is determined by the State Legislature to be too important to be changed, requiring no environmental review.

16
New cards

Categorical Exemption

A CEQA exemption applied to an entire class of projects that typically do not have a significant effect on the environment.

17
New cards

Initial Study Checklist

A preliminary analysis tool used under CEQA to summarize analysis, determine whether an EIR or Negative Declaration must be prepared, and identify potential environmental effects.

18
New cards

Negative Declaration (Neg. Dec.)

An environmental document prepared under CEQA when a project results in no impact or a less than significant impact on the environment.

19
New cards

Mitigated Negative Declaration (MND)

An environmental document prepared under CEQA when potential environmental impacts are identified but reduced to less than significant levels with mitigation incorporated.

20
New cards

Environmental Impact Report (EIR)

A detailed CEQA document prepared when a project has any potentially significant impact, analyzing environmental effects and discussing ways to mitigate or avoid them.

21
New cards

CEQA Addendum

A document making minor technical changes or additions to an adopted Negative Declaration or certified EIR when minor project or document changes occur.

22
New cards

Supplemental or Subsequent EIR

A revised environmental review prepared when substantial project/document changes occur, new information of substantial importance arises, or new significant impacts/mitigation measures become feasible.

23
New cards

CEQA Consistency Analysis

An evaluation comparing a revised project against the original project to determine if the new project's environmental impacts were analyzed in the previous document.