What does WBS stand for?
Work Breakdown Structure.
2
New cards
What is WBS?
A hierarchy of tasks needed to complete the project.
3
New cards
What does WBS represent?
The physical breakdown of work to be performed.
4
New cards
Does WBS sequence work?
No, it divides the project into manageable work packages.
5
New cards
Is WBS a schedule?
No.
6
New cards
What is a work package?
A fundamental element needed to complete work under contract.
7
New cards
Why is WBS needed?
To prevent task omissions and make the project easier to comprehend.
8
New cards
What is WBS the backbone of?
Project control or tracking system.
9
New cards
What are the benefits of WBS?
Organization, communication, and querying of Plan/Schedule information.
10
New cards
What are the requirements of WBS?
Clear, useful, comprehensive; allow elaboration; conform to reporting requirements.
11
New cards
What does developing a WBS begin with?
Definition of major systems or components.
12
New cards
How detailed should a WBS become?
Until the task reaches a measurable piece of work with a single responsibility.
13
New cards
How can a WBS divide a project?
Area, phase, function, or other means.
14
New cards
What does UniFormat organize by?
Building Systems/Assemblies.
15
New cards
What does MasterFormat organize by?
Materials/Work Results.
16
New cards
What is UniFormat best used for?
Cost estimation and early planning.
17
New cards
What is MasterFormat best used for?
Later design stages.
18
New cards
How many divisions does MasterFormat have?
50 divisions.
19
New cards
What are the three UniFormat levels?
Major Group Elements, Group Elements, Individual Elements.
20
New cards
Who publishes MasterFormat and UniFormat?
Construction Specifications Institute (CSI).
21
New cards
What is a good source for developing schedule activities?
Technical specifications.
22
New cards
What are technical specifications?
A written description of the work that complements drawings.
23
New cards
What is used as a basis for capturing all activities?
Work Breakdown Structure (WBS).
24
New cards
Whose work must be captured in the schedule?
Owner and contractors.
25
New cards
What is a milestone?
A point in time representing a key event or accomplishment.
26
New cards
What is the duration of a milestone?
Zero duration.
27
New cards
Do milestones consume resources?
No.
28
New cards
What two milestones should every schedule include?
Project start (NTP) and finish (Substantial Completion).
29
New cards
What is a best practice for milestones?
Include milestones only for major events or deliverables.
30
New cards
Why should too many milestones be avoided?
They may mask activities and prevent proper progress recording.
31
New cards
What is a detail activity?
Actual discrete work planned in the program.
32
New cards
Where are detail activities located in the WBS?
At the lowest level.
33
New cards
Do detail activities have durations?
Yes, an estimated duration.
34
New cards
How should detail activities be linked?
To preceding and succeeding activities and milestones.
35
New cards
What is a summary activity?
A grouping of lower-level activities showing the time required.
36
New cards
Where do summary activities get their start and finish dates?
From lower-level activities.
37
New cards
Should summary activities have logic relationships?
No, they should never be linked to or from other activities.
38
New cards
What are the best practices for activity names?
Unique, descriptive, and unambiguous.
39
New cards
How should activity names be phrased?
Present tense with verb-noun combinations.
40
New cards
What should milestone names describe?
An event or deliverable.
41
New cards
Why should repetitive or vague activity names be avoided?
They make communication between teams difficult.
42
New cards
How should abbreviations be used in activity names?
Minimally; define them in the WBS dictionary or schedule basis document.
43
New cards
What is an activity code?
A unique alphanumeric code identifying an activity.
44
New cards
What should activity codes be consistent with?
WBS elements, contractor, location, phase, and other key documents.
45
New cards
What should an activity code preserve?
The hierarchical relationship with its parent elements.
46
New cards
What must be determined when ordering activities?
Which activities precede, follow, or occur concurrently.
47
New cards
What types of constraints affect activity ordering?
Physical, resource, productivity, safety, financial, environmental, management, contractual, regulatory.
48
New cards
What are the effects of excessive constraints?
Less flexibility, longer duration, higher cost, confused scheduling logic.
49
New cards
What is a predecessor activity?
An activity that must start or finish before its successor.
50
New cards
What is a successor activity?
An activity whose timing depends on a predecessor.
51
New cards
What does FS stand for?
Finish-to-Start.
52
New cards
What does FF stand for?
Finish-to-Finish.
53
New cards
What does SS stand for?
Start-to-Start.
54
New cards
What does SF stand for?
Start-to-Finish.
55
New cards
What is a Finish-to-Start (FS) relationship?
The predecessor must finish before the successor can start.
56
New cards
What is a Finish-to-Finish (FF) relationship?
The predecessor must finish before the successor can finish.
57
New cards
What is a Start-to-Start (SS) relationship?
The predecessor must start before the successor can start.
58
New cards
What is a Start-to-Finish (SF) relationship?
The predecessor must start before the successor can finish.
59
New cards
What is the default relationship in most scheduling programs?
Finish-to-Start (FS).
60
New cards
Why are FS relationships preferred?
More intuitive, easier to implement, and easier to trace.
61
New cards
Which activity relationship is not recommended for practical engineering schedules?
Start-to-Finish (SF).
62
New cards
Why is complete network logic essential?
To correctly forecast the start and finish dates of activities.
63
New cards
What can missing or incorrect network logic cause?
Damage to the entire schedule network.
64
New cards
What is the general rule for activity relationships?
Every activity should have at least one predecessor and one successor.
65
New cards
What are the exceptions to the predecessor-successor rule?
Start milestone has no predecessor; finish milestone has no successor.
66
New cards
What are the four types of incomplete and dangling logic?
Circular, Redundant, Dangling, Summary.
67
New cards
What is circular logic?
Two activities depend on each other, creating an endless loop.
68
New cards
What is redundant logic?
Unnecessary logic links between activities.
69
New cards
What is dangling logic?
Incomplete logic that interferes with schedule forecasting.
70
New cards
What should drive each activity's start date?
A predecessor activity, except for the start milestone.
71
New cards
What should each activity's finish date drive?
A successor activity's start or finish, except for the finish milestone.
72
New cards
What is summary logic?
Logic linked to summary activities, which should have no logic relationships.
73
New cards
What is a date constraint?
A calendar restriction on when an activity can start or finish.
74
New cards
When should date constraints be used?
Only when necessary and justified in schedule documentation.
75
New cards
What are the two categories of date constraints?
Soft Constraints and Hard Constraints.
76
New cards
What are the soft date constraints?
Start No Earlier Than (SNET) and Finish No Earlier Than (FNET).
77
New cards
What are the hard date constraints?
Start No Later Than (SNLT), Finish No Later Than (FNLT), Must Finish On (MFO), Must Start On (MSO).
78
New cards
What does ASAP stand for?
As Soon As Possible.
79
New cards
What does ALAP stand for?
As Late As Possible.
80
New cards
What does ASAP do?
Schedules the task to begin as early as possible.
81
New cards
What does ALAP do?
Schedules the task as late as possible without delaying subsequent tasks.
82
New cards
What does SNET mean?
Start No Earlier Than — start on or after a specified date.
83
New cards
What does FNET mean?
Finish No Earlier Than — finish on or after a specified date.
84
New cards
What does SNLT mean?
Start No Later Than — start on or before a specified date.
85
New cards
What does FNLT mean?
Finish No Later Than — finish on or before a specified date.
86
New cards
What does MFO mean?
Must Finish On — finish on a specified date.
87
New cards
What does MSO mean?
Must Start On — start on a specified date.
88
New cards
What is a lag?
A delay in the successor activity.
89
New cards
What is a lead?
A negative lag that accelerates the successor activity.
90
New cards
What is the difference between lag and lead?
Lag delays the successor; lead accelerates the successor.
91
New cards
What is float?
The amount of time an activity can be delayed.
92
New cards
Are lag and float the same?
No, link lag values should not be confused with float.