Shipboard Damage Control: Drainage, Shoring, Pipe Patching, and Sounding

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/32

flashcard set

Earn XP

Description and Tags

Vocabulary practice flashcards covering naval damage control systems, including installed and portable drainage, shoring techniques, pipe patching kits and procedures, and tank sounding operations.

33 Terms

1
New cards

Main Drainage System

7 main drainage educators rated at 2,000 gpm that can dewater 19 spaces

2
New cards

Secondary Drainage System

22 secondary drainage eductors rated at various gpm that dewater 25 spaces.

3
New cards

Electrical Submersible Pump (ESP)

Runs off 440V AC

2 ½ suction and discharge fittings

140 gpm at with a 70 foot static head

200 gpm at with a 50 foot static head

Can be hooked up in tandem indefinite suction lift

4
New cards

Closed Space Eductor Hazard

Any eductor ran inside of a closed space will begin to remove air when all liquid is removed. It may remove enough oxygen to the point where it may not sustain life

5
New cards

Rise (K-Type Shoring)

The distance from the center of damage to the deck, marked on the thick side of a carpenter square using a scale ratio of 1 inch=1 foot1\text{ inch} = 1\text{ foot}.

6
New cards

Run (K-Type Shoring)

The distance from the bulkhead to the anchoring point on the deck, marked on the thin side of a carpenter square using a scale ratio of 1 inch=1 foot1\text{ inch} = 1\text{ foot}.

7
New cards

Length of Shore (Carpenter Square Method)

The length of the shore (third side of the triangle) determined by measuring across the carpenter square from the outside of the RUN mark to the outside of the RISE mark.

8
New cards

Shoring Watch

Personnel posted to continuously inspect installed shores for slipping and collapsing, tasked with standing back if a shore bows, reporting to the controlling station, and preparing additional shoring.

9
New cards

Peri-Jet Eductor

Powered by the Firemain system with a 2 ½ inlet

4” discharge, and a 4” suction

Capable of passing debris up to 4”

10
New cards

Minimum Operating Pressure Formula (Eductor)


11
New cards

S-Type Eductor

Firemain-powered

1 ½ “ inlet hose and a 2 ½ “ discharge hose

Equipped with a built-in strainer that prevents debris from passing.

12
New cards

Steel Shoring (3ft−5ft3\text{ft} - 5\text{ft})

4 in each Locker

3ft 20,000 Ibs - 5ft 12,000 Ibs

Requires no cutting, and can be welded in place for semipermanent repairs


13
New cards

Steel Shoring (6ft−11ft6\text{ft} - 11\text{ft})

4 in each locker

6ft 20,000 Ibs - 11ft 6,000 Ibs

Requires no cutting, and can be welded in place for semipermanent repairs


14
New cards

Fuel Line Rupture Repair

Emergency procedure requiring line isolation, purging with steam or nitrogen before welding, using EWARP only as a last resort, or applying a Jubilee patch when the line cannot be isolated.

15
New cards

Soft Patch

Rated up to 150 psi

Made from wedges, oakum, rubber sheet, and marline

Recommended for low-pressure steam (rubber vulcanizes to seal) and prohibited on flammable liquid lines.

16
New cards

Jubilee Patch

Holds up to 294 PSI

Comes in various sizes


17
New cards

Banding Kit

Rated to 150 PSI

18
New cards

EWARP (Emergency Water Activated Repair Patch)


2” x 5’ and 4” x 15’ sizes

Rated up to 150 PSI and 300 degrees

Soaked for 20 seconds20\text{ seconds} in lukewarm water

Wrapped in 8 layers, and allowed 30 minutes to set

19
New cards

Sounding Cap Air Test

Escaping air indicates potential flooding, while rushing-in air indicates a hole between spaces or fire in the tank

20
New cards

Sounding

The damage control procedure conducted daily to check fluid levels and executed after battle damage to investigate tanks and voids for flooding.

21
New cards

Damage Control Officer (DCO)

CDR Carter

22
New cards

Damage Control Assistant (DCA)

LCDR Miller

23
New cards

Fire Marshal

DCCS Rhaney

24
New cards

Locker Leader

The personnel in charge of the repair locker and its crew, tasked with directing the Scene Leader and reporting status to DC Central and the DCA.

25
New cards

On-Scene Leader (OSL)

The leader who directs the attack team and support team, controls compartment access and efforts, and reports directly to the Locker Leader.

26
New cards

On-Scene Leader (OSL)

The leader who directs the attack team and support team, controls compartment access and efforts, and reports directly to the Locker Leader.

27
New cards

Investigators

Damage control personnel who travel in pairs—with at least one member fully qualified—to locate and report progressive structural damage and casualties.

28
New cards

Ram Fan 2000

Firemain-powered

1 ½ “ inlet and outlet connections

2000 CFM with 10-in duct

Attach grounding to metal surface before using

29
New cards

Super Vac Box Fan

Powered by 115 volts

Rated at 3,200 CFM

30
New cards

P-100 Pump

Primarily as an emergency source of firefighting water

Rated at 100 GPM at 83 PSI

22 ft suction lift

3” suction hose, and a 2 ½ “ discharge.

31
New cards

Eductor Valve Operating Sequence

The specific sequence required when starting an eductor to prevent backflow open Discharge, open Firemain, and open Suction (DFS).

32
New cards

Self-Contained Breathing Apparatus (SCBA) Pressure Stages

A respiratory system pressurized to 4,500 psi4{,}500\text{ psi} of Grade D air with a 7,200 psi7{,}200\text{ psi} burst disk; reduced to 100 psi100\text{ psi} by the first-stage reducer and to 0.05 psi0.05\text{ psi} by the second-stage regulator.

33
New cards

Emergency Escape Breathing Device (EEBD)

A hood apparatus providing 10 minutes10\text{ minutes} of breathable oxygen for escape or awaiting rescue; donned around the neck with mouthpiece inserted and nose clip secured, and never authorized for firefighting or maintenance.