Vocabulary practice flashcards covering naval damage control systems, including installed and portable drainage, shoring techniques, pipe patching kits and procedures, and tank sounding operations.
Main Drainage System
7 main drainage educators rated at 2,000 gpm that can dewater 19 spaces
Secondary Drainage System
22 secondary drainage eductors rated at various gpm that dewater 25 spaces.
Electrical Submersible Pump (ESP)
Runs off 440V AC
2 ½ suction and discharge fittings
140 gpm at with a 70 foot static head
200 gpm at with a 50 foot static head
Can be hooked up in tandem indefinite suction lift
Closed Space Eductor Hazard
Any eductor ran inside of a closed space will begin to remove air when all liquid is removed. It may remove enough oxygen to the point where it may not sustain life
Rise (K-Type Shoring)
The distance from the center of damage to the deck, marked on the thick side of a carpenter square using a scale ratio of 1 inch=1 foot.
Run (K-Type Shoring)
The distance from the bulkhead to the anchoring point on the deck, marked on the thin side of a carpenter square using a scale ratio of 1 inch=1 foot.
Length of Shore (Carpenter Square Method)
The length of the shore (third side of the triangle) determined by measuring across the carpenter square from the outside of the RUN mark to the outside of the RISE mark.
Shoring Watch
Personnel posted to continuously inspect installed shores for slipping and collapsing, tasked with standing back if a shore bows, reporting to the controlling station, and preparing additional shoring.
Peri-Jet Eductor
Powered by the Firemain system with a 2 ½ inlet
4” discharge, and a 4” suction
Capable of passing debris up to 4”
Minimum Operating Pressure Formula (Eductor)
S-Type Eductor
Firemain-powered
1 ½ “ inlet hose and a 2 ½ “ discharge hose
Equipped with a built-in strainer that prevents debris from passing.
Steel Shoring (3ft−5ft)
4 in each Locker
3ft 20,000 Ibs - 5ft 12,000 Ibs
Requires no cutting, and can be welded in place for semipermanent repairs
Steel Shoring (6ft−11ft)
4 in each locker
6ft 20,000 Ibs - 11ft 6,000 Ibs
Requires no cutting, and can be welded in place for semipermanent repairs
Fuel Line Rupture Repair
Emergency procedure requiring line isolation, purging with steam or nitrogen before welding, using EWARP only as a last resort, or applying a Jubilee patch when the line cannot be isolated.
Soft Patch
Rated up to 150 psi
Made from wedges, oakum, rubber sheet, and marline
Recommended for low-pressure steam (rubber vulcanizes to seal) and prohibited on flammable liquid lines.
Jubilee Patch
Holds up to 294 PSI
Comes in various sizes
Banding Kit
Rated to 150 PSI
EWARP (Emergency Water Activated Repair Patch)
2” x 5’ and 4” x 15’ sizes
Rated up to 150 PSI and 300 degrees
Soaked for 20 seconds in lukewarm water
Wrapped in 8 layers, and allowed 30 minutes to set
Sounding Cap Air Test
Escaping air indicates potential flooding, while rushing-in air indicates a hole between spaces or fire in the tank
Sounding
The damage control procedure conducted daily to check fluid levels and executed after battle damage to investigate tanks and voids for flooding.
Damage Control Officer (DCO)
CDR Carter
Damage Control Assistant (DCA)
LCDR Miller
Fire Marshal
DCCS Rhaney
Locker Leader
The personnel in charge of the repair locker and its crew, tasked with directing the Scene Leader and reporting status to DC Central and the DCA.
On-Scene Leader (OSL)
The leader who directs the attack team and support team, controls compartment access and efforts, and reports directly to the Locker Leader.
On-Scene Leader (OSL)
The leader who directs the attack team and support team, controls compartment access and efforts, and reports directly to the Locker Leader.
Investigators
Damage control personnel who travel in pairs—with at least one member fully qualified—to locate and report progressive structural damage and casualties.
Ram Fan 2000
Firemain-powered
1 ½ “ inlet and outlet connections
2000 CFM with 10-in duct
Attach grounding to metal surface before using
Super Vac Box Fan
Powered by 115 volts
Rated at 3,200 CFM
P-100 Pump
Primarily as an emergency source of firefighting water
Rated at 100 GPM at 83 PSI
22 ft suction lift
3” suction hose, and a 2 ½ “ discharge.
Eductor Valve Operating Sequence
The specific sequence required when starting an eductor to prevent backflow open Discharge, open Firemain, and open Suction (DFS).
Self-Contained Breathing Apparatus (SCBA) Pressure Stages
A respiratory system pressurized to 4,500 psi of Grade D air with a 7,200 psi burst disk; reduced to 100 psi by the first-stage reducer and to 0.05 psi by the second-stage regulator.
Emergency Escape Breathing Device (EEBD)
A hood apparatus providing 10 minutes of breathable oxygen for escape or awaiting rescue; donned around the neck with mouthpiece inserted and nose clip secured, and never authorized for firefighting or maintenance.