Hazard
Anything in a workplace that poses a danger or risk to the health and safety of people in the workplace; often the root cause of farm incidents
Root cause
The primary issue or hazard that led to an incident; the conditions in place that allowed it to happen (e.g., improper training, disorganized workplace, improper chemical storage, repetitive motions)
Near miss / close call
An unplanned event that could have caused, but did not cause, human injury or environmental or equipment damage
How many steps does OSHA outline for identifying and addressing hazards?
6
OSHA hazard ID Action Item 1
Collect existing information about workplace hazards (equipment manuals, SDS, past injury/illness records, incident investigations, worker input, job hazard analyses)
OSHA hazard ID Action Item 2
Inspect the workplace for safety hazards: inspect all operations, equipment, work areas and facilities with workers; take photos; use facility maps and checklists
OSHA hazard ID Action Item 3
Identify health hazards, including 'unseen' hazards: chemical, physical, biological and ergonomic
OSHA hazard ID Action Item 4
Conduct incident investigations of injuries, illnesses, close calls/near misses and reported concerns; done as a team, asking 'why' and 'what led to…'
OSHA hazard ID Action Item 5
Identify hazards associated with emergency and nonroutine situations
OSHA hazard ID Action Item 6
Characterize the nature of identified hazards, identify interim control measures, and prioritize hazards for control
Outside sources of hazard information
OSHA, NIOSH, CDC website, labor unions, worker advocacy groups, safety and health consultants
Examples of 'unseen' health hazards
Gases and vapors, odorless hazards, long-term exposures such as asbestos and lead paint
Chemical health hazards: what should you review?
The SDS (Safety Data Sheet) of all chemicals present, including volatility
Physical health hazards (examples)
Excessive noise, high heat exposure, atmospheric conditions such as low oxygen or phosphine
Biological health hazards (examples)
Infectious diseases, molds, toxic or poisonous plants, animal materials such as manure pits
Ergonomic risk factors (examples)
Heavy lifting, work above shoulder height, repetitive motions, tasks with vibration
Examples of emergency / nonroutine situations
Fires/explosions, chemical releases, hazmat spills, startups after shutdowns, infrequent maintenance, structural collapse, disease outbreaks, weather emergencies, medical emergencies, workplace violence
Two factors used to evaluate (prioritize) a hazard
Severity of potential outcomes and likelihood of the event/exposure occurring (plus how many workers may be exposed)
Interim control measures
Temporary measures that protect workers until permanent solutions can be implemented
Employer's ongoing obligation
To control all serious recognized hazards
Hierarchy of Controls (most to least effective)
Elimination, Substitution, Engineering Controls, Administrative Controls, PPE
Elimination
Physically remove the hazard (most effective control)
Substitution
Replace the hazard with something less hazardous
Engineering controls (hierarchy definition)
Isolate people from the hazard
Administrative controls
Change the way people work
PPE (in the hierarchy)
Protect the worker with personal protective equipment; the least effective control
Engineering controls
Protect workers by removing hazardous conditions or placing a barrier between the worker and the hazard; built into the design of a building, equipment or process
Engineering controls vs. PPE
Engineering controls don't interfere with productivity or comfort and make the work easier; PPE relies on the worker wearing it
4 steps to implement engineering controls
1) Observe processes (Hazard ID) 2) Hazard analysis 3) Develop plan 4) Observe and determine success of controls
Engineering controls Step 1: Observe processes - what do you watch for?
Worker interactions with each other, tools, environment and equipment; fatigue (strain, repetitive motion, noise); contact with moving parts (gears, chains, PTO shafts); airborne contaminants (dust, vapors, aerosols)
Engineering controls Step 2: Hazard analysis
Identify the relationship between employee, task, tools and environment; classify each hazard; use the analysis as the basis for the control plan
Engineering controls Step 3: Develop plan
Identify needed guarding/isolation/processes; fix Major and Serious concerns first; compare automation vs. conventional costs; estimate total cost and timeline; set short-term controls (PPE)
Engineering controls Step 4: Observe and determine success
Watch tasks with new controls, confirm they're used properly and working, check whether workers are adapting, decide if administrative controls are also needed
Three basic types of engineering controls
Process control, enclosure/isolation, ventilation
Process control
Changing the way a job or process is done; monitor before and after to ensure success
Examples of process controls
Water on concrete saws, vacuums or wet sweeping, steam cleaning instead of solvent degreasing, airless paint, automation (automated milkers), conveyors for objects over 50 lbs, electric instead of gas/diesel motors
Steam cleaning instead of solvent degreasing - tradeoff
Removes the chemical hazard but may introduce a heat stress hazard
Enclosure
Keeps the chemical 'in' and the worker 'out'; physically separates the hazard; tightly sealed, opened only during locked-out maintenance (e.g., abrasive blasting cabinets, enclosed CNC mills)
Isolation
Moves the hazard geographically away from the employee (e.g., paint booth, grinding room, welding room)
Ventilation (engineering control)
Strategic addition or removal of air in the workspace to remove or dilute a contaminant
4 parts of a local exhaust ventilation system
Hood (captures contaminant at the source), ductwork, fan, air cleaning device
Fall protection: guardrails required on platforms taller than…
4 feet
Fall protection: cages required on ladders taller than…
20 feet
Guards vs. safeguarding
Guards are physical barriers preventing access to danger areas; safeguarding prevents or detects operator contact with the point of operation and may stop the machine (e.g., SawStop)
Trench work engineering controls
Reinforce trench walls, purge utility lines first, test the atmosphere, avoid moving loads over workers, move equipment away from the trench
General Industry standards
29 CFR 1910
Agriculture standards
29 CFR 1928
1910 Subpart H
Hazardous Materials (e.g., anhydrous ammonia, 1910.111)
Anhydrous ammonia container marking rule
All containers must be marked 'Anhydrous Ammonia' on the container and system nameplate
1910.142
Temporary Labor Camps (migrant/seasonal worker camps: sewage, living conditions, lighting, food and dining)
1910.145
Specifications for accident prevention signs and tags (includes slow-moving vehicle emblem)
Sign wording requirements (1910.145(e)(2))
Easily read, concise, enough info to be understood, positive rather than negative suggestion, accurate in fact
1910.266
Logging Operations (all types of logging regardless of end use; does NOT cover cable yarding systems)
1910.1027
Cadmium (all industries except construction, which is 29 CFR 1926.63)
Cadmium
Silver-white metal extracted during copper, lead and zinc production; highly toxic and carcinogenic
1910.1200
Hazard Communication (HazCom): classify chemical hazards and communicate them via labels, SDS and training; strong impact on pesticide regulations
1910.1201
Retention of DOT markings, placards and labels until packaging is cleaned of residue and purged of vapors
1928 Subpart A
General: purpose and scope of ag safety standards
1928 Subpart B (1928.21)
Applicability of Standards: refers back to 29 CFR 1910 general industry standards
Agricultural tractor (1928.51 definition)
2- or 4-wheel drive or track vehicle over 20 hp designed to pull, carry, propel or drive implements (excludes self-propelled implements)
ROPS
Rollover Protective Structure; employer must provide one for each tractor operated by an employee
ROPS requirement applies to tractors manufactured after…
October 25, 1976
Seatbelt anchorage must withstand…
1,000 lb static tensile load
ROPS field-upset test
Side and rear upset tests on a dry, firm soil bank
ROPS pendulum test
4,410 lb weight on a pendulum suspended 22 feet above the point of impact
1928.57
Guarding of farm field equipment, farmstead equipment, and cotton gins (moving machinery parts)
Farm field equipment vs. farmstead equipment
Field = tractors and implements; farmstead = equipment used in a stationary manner
1928.57(a)(6)(iii)
No riders on farm field equipment
1928.110
Field Sanitation
Field sanitation applies when…
11 or more employees do hand-labor in the field on any given day
Field sanitation requirements
Potable drinking water, handwashing facility (potable water, soap, single-use towels), toilet facility
1928.1027
Cadmium (agriculture): exposure limits, monitoring, PPE, exposure notification
NESC
National Electrical Safety Code: rules for installing, operating and maintaining electric power for the utility company (substations, overhead and underground lines)
NEC
National Electrical Code: standard for safe installation of electrical wiring and equipment; used by electricians to be 'up to code'
Overhead lines above a grain bin (portable auger systems, NESC)
At least 18 feet above the tallest point of the bin
Powerline post distance on the loading side of a grain bin
Minimum 38 feet from the bin
Fixed grain-handling systems: lines serving the transformer
At least 12.5 feet above the roof (if not easily accessible); 18 feet above highest point if roof is accessible
NESC clearance where ag equipment travels
18.5 feet above the ground
NEC clearances
8 feet above an easily accessible roof; 18 feet above roadways
Step potential
The voltage between the span of one step
Where is ground voltage highest after a line contact?
At the source; it fades as energy moves across the ground
Why is step potential dangerous?
Stepping on two different voltages at the same time may electrocute you
If you see a downed line, the safest place is…
Inside the cab or on the equipment
Number to call before digging
811
Cable type for damp ag buildings
Type NMC or UF cable (no paper insulation layer, can stay damp without corroding)
Wire gauge is determined by…
Length of the run and the power demand of the connected equipment
15 amp fuse: copper and aluminum wire size (NMC/UF)
20 amp fuse: copper and aluminum wire size (NMC/UF)
30 amp fuse: copper and aluminum wire size (NMC/UF)
Preferred conduit type for ag buildings and why
PVC: resists corrosion from moisture and is cheaper than metal
Purpose of conduit
Extra protection for cable from livestock, rodents and general wear
GFCI
Ground-fault circuit interrupter: a breaker that prevents shock to people or animals in wet/damp conditions
How a GFCI works
The two supply wires should carry equal current; if current takes a different path (ground wire or a body), the imbalance trips the GFCI and stops the flow
Ag facility wiring placement rules
Run cables in open areas for easy inspection; keep switches and devices out of reach of livestock
Extension cord safe use checklist
Don't use in wet areas; don't repair damaged cords (replace them); keep away from sharp objects, heat, oil, solvents; inspect before use; don't overload
Telehandler (other names)
Telescopic handler or boom lift
Telehandler key feature
Attachments can be lifted vertically and extended away from the machine; capacity varies with boom extension and angle
Common telehandler attachments
Pallet forks, bucket, grapple, winch
Skid steer (other name)
Compact tracked loader
How does a skid steer turn?
Not by turning wheels like a car; it skids/steers by varying wheel speed on each side