XDR Bootcamp Study Guide - Day 6 - Construction Shops & Demo

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/38

flashcard set

Earn XP

Description and Tags

Vocabulary practice flashcards covering construction terminology, qualifying rules, formulas, roles, and demo takeaways from Day 6 of the XDR Bootcamp.

39 Terms

1
New cards

Construction Project Manager (PM)

Runs the project from start to finish: schedule, budget, crews and keeping the GC and customer updated

2
New cards

Construction Estimator

Office-based. Does take-offs and builds the bids

3
New cards

Crew Lead

Leads a small crew (usually 2-3 people) on the job site

4
New cards

Installer

Does the hands-on install work on the job site

5
New cards

Bid

The price a construction shop submits to win a project

6
New cards

Project

A construction job that runs over many days or weeks, broken into phases

7
New cards

Change order

A change to the original scope of a project, which changes the price

8
New cards

Take-off

Counting all the materials and labor needed from the plans to build a bid

9
New cards

Retainage

A % of each payment held back until the project is done, then collected at the end

10
New cards

AIA billing

Progress billing on a standard form (application for payment) that bills a % of the job as work gets done

11
New cards

Trim out

A later phase of a project where final fixtures and finishes go in (after rough-in)

12
New cards

Construction phases

Rough-in, trim-out, startup

13
New cards

Construction pain point 1

Managing projects: tracking schedule, budget and status across many jobs

14
New cards

Construction pain point 2

Field-to-office coordination: getting time, progress and changes from the job site back to the office

15
New cards

Construction pain point 3

Tedious invoicing: progress billing, AIA forms and retainage done by hand

16
New cards

0-30% construction

Service & Replacement (S/R) opportunity

17
New cards

31-99% construction

Construction opportunity (Comm+)

18
New cards

100% construction

DQ

19
New cards

Retrofit question

"How much of that construction work involves anything beyond retrofit and installs?"

20
New cards

Some construction is beyond retrofit

Keep going with the construction questions (accounting software, revenue)

21
New cards

All construction is retrofit/install

Treat it as Service & Replacement

22
New cards

Construction accounting software

Must be on the approved list, for example QuickBooks, Sage Intacct, Viewpoint Vista/Spectrum, Computerease, or no software. Sage 100 = DQ

23
New cards

Construction techs formula

TAR×% construction/$500K=construction techs\text{TAR} \times \%\,\text{construction} / \$500\text{K} = \text{construction techs}

24
New cards

When you need GMV

TAR over $1M, 31-99% construction, and at least 1 MT doing 20%+ service

25
New cards

$20M+ construction GMV

Goes to Enterprise. Not ours

26
New cards

Construction DM

Owner / Co-Owner

27
New cards

Construction approved non-DMs

President / Co-President, C-Level, GM, Director of Operations

28
New cards

MDR-only construction titles

Operations Manager, VP of Operations

29
New cards

Old lesson rule: subcontractors

Lesson still expects "3 or less subcontractors." The current 8/4 sheet dropped this question, so go by the sheet

30
New cards

Demo: Pure Mechanical

Mechanical shop: 12 service techs, 13 construction installers/foremen, about $8M construction revenue

31
New cards

Demo: their #1 pain

They only looked at job costing after a project was done. They wanted to see it the whole way through

32
New cards

Demo: budget vs actual

Breaks project costs into labels (phases, materials, equipment, labor, subs) and updates in real time

33
New cards

Demo: mobile time tracking

Techs clock into the right phase on the app. Offline mode syncs later, and the office can edit hours

34
New cards

Demo: procurement

POs can be made right from the estimate. Costs hit the project as invoices come in

35
New cards

Demo: reports

At-risk project and WIP reports can be scheduled to their inbox weekly

36
New cards

Demo: construction pricing

Unlimited construction licenses priced off construction revenue, so they can grow without paying per head

37
New cards

Demo: service pricing

Service techs are priced per license (Essentials or Works package)

38
New cards

Demo: implementation

About 8-12 weeks. They wanted to go live before their March/April busy season

39
New cards

Demo takeaway

The SE asked discovery questions first, then built the demo around their answers and their own phases