Environmental Impact Assessment, Environmental Legislation, and Global Climate Agreements

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/56

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering the Environmental Impact Assessment (EIA) process and methodologies, Indian environmental statutes (EPA 1986, Air Act 1981, Water Act 1974, Forest Conservation Act 1980, Wildlife Protection Act 1972), international climate treaties (UNFCCC, Kyoto Protocol, Paris Agreement), and the Sustainable Development Goals (SDGs).

57 Terms

1
New cards

Environmental Impact Assessment (EIA)

A formal planning process used to identify, predict, and evaluate the potential environmental, social, cultural, and human health consequences of a proposed development project prior to its execution, aimed at mitigating adverse impacts.

2
New cards

Initial Screening (EIA)

The first stage of the EIA process that determines whether a proposed development project requires an EIA and establishes the specific level of assessment required.

3
New cards

Scoping (EIA)

The EIA phase that identifies critical environmental issues and potential impacts for further investigation while establishing the geographic, temporal, and thematic boundaries and defining the Terms of Reference (ToR).

4
New cards

Environmental Management Plan (EMP)

A documented plan integrated into project design detailing how prescribed mitigation measures will be implemented, including monitoring schedules, reporting mandates, emergency response procedures, and assigned institutional responsibilities.

5
New cards

Post Monitoring (EIA)

The surveillance stage following project commissioning that verifies environmental impacts remain within legal standards and confirms that mitigation measures are executed as stated in the approved EIA report.

6
New cards

Checklist Method

An EIA methodology utilizing structured lists of environmental parameters (simple descriptive, questionnaire, or weighted) to assess whether a project will affect those factors without illustrating cause-effect interactions.

7
New cards

Leopold Matrix

A two-dimensional semi-quantitative grid developed in 1971 that links project actions along the columns with environmental factors along the rows, scoring each cell for impact magnitude and importance on scales of 1 to 101\text{ to }10 or −10 to +10-10\text{ to }+10.

8
New cards

Network Analysis (EIA)

An assessment method that maps cause-effect linkages into interconnected flowcharts to identify primary, secondary, tertiary, indirect, and cumulative environmental impacts.

9
New cards

Environmental Modeling Techniques

Quantitative mathematical or computer simulations (such as AERMOD, QUAL2K, and SWAT) used to forecast pollutant dispersion, hydrological changes, noise levels, and ecological risk scenarios.

10
New cards

Bhopal Gas Tragedy

The industrial disaster occurring on the night of December 2–3, 1984, in Bhopal, Madhya Pradesh, where a massive leak of toxic Methyl Isocyanate (MIC\text{MIC}) gas from a Union Carbide pesticide plant killed thousands and prompted the enactment of India's Environment (Protection) Act, 1986.

11
New cards

Environment (Protection) Act, 1986 (EPA)

Enacted on November 19, 1986, following the 1972 Stockholm Conference and the Bhopal disaster, this umbrella legislation provides comprehensive central authority to protect and improve air, water, and land quality.

12
New cards

Umbrella Legislation

A broad, overarching legislative framework—exemplified by India's EPA, 1986—that unifies environmental governance across land, water, and air, empowering the Central Government to set universal regulatory standards and coordinate enforcement.

13
New cards

Section 3 (EPA, 1986)

The central provision of the Environment (Protection) Act, 1986 granting sweeping powers to the Central Government to formulate national programs, establish environmental standards, restrict industrial locations, and mandate inspections.

14
New cards

Section 7 (EPA, 1986)

The statutory clause prohibiting any person or industrial operator from discharging or emitting environmental pollutants in excess of the prescribed numerical standards.

15
New cards

Section 8 (EPA, 1986)

The mandatory provision regulating the production, handling, storage, transport, and disposal of hazardous substances in compliance with specified procedural safeguards.

16
New cards

EIA Notification 2006 Categorization

A regulatory classification dividing projects into Category A (national-level appraisal by the Impact Assessment Agency and Expert Appraisal Committee) and Category B (state-level appraisal by SEIAA and SEAC).

17
New cards

Air (Prevention and Control of Pollution) Act, 1981

A sector-specific Indian law enacted in 1981 to prevent, control, and abate atmospheric pollution, establishing a two-tier enforcement structure through the CPCB and SPCBs.

18
New cards

Air Pollutant (Section 2(a), Air Act)

Any solid, liquid, or gaseous substance present in the atmosphere in concentrations injurious to humans, living creatures, plants, property, or the environment, legally amended in 1987 to include noise.

19
New cards

Air Pollution Control Area (Section 19, Air Act)

A designated geographic territory declared by a State Government in consultation with the SPCB where stringent fuel restrictions, mandatory consent rules, and heightened emission standards apply.

20
New cards

Section 21 (Air Act, 1981)

The preventive consent clause prohibiting industrial operations from discharging emissions within an air pollution control area without obtaining prior written approval from the State Pollution Control Board.

21
New cards

Section 31A (Air Act, 1981)

An emergency administrative power authorizing State Pollution Control Boards to direct the immediate closure, suspension, or regulation of any industrial operation or utility supply in cases of acute pollution risk.

22
New cards

Electrostatic Precipitator (ESP)

An air pollution control device that applies high-voltage electrostatic charges to remove fine particulate matter from industrial flue gases.

23
New cards

Cyclone Separator

An industrial device that uses centrifugal force within a vortex to separate coarse dust and solid particles from gas and air streams.

24
New cards

Wet Scrubber

A pollution control system that contacts dirty gas streams with liquid solutions to absorb, neutralize, and capture harmful gaseous pollutants.

25
New cards

Bag Filter

A fabric filter system that collects airborne solid particulate matter from industrial exhaust streams by passing gas through fabric filter bags.

26
New cards

Water (Prevention and Control of Pollution) Act, 1974

Enacted on March 23, 1974, under Article 252 of the Constitution, this foundational water quality statute created India's original regulatory board architecture to restore and maintain the wholesomeness of water.

27
New cards

Central Pollution Control Board (CPCB)

The national apex pollution control authority established under Section 3 of the Water Act, 1974, responsible for setting national environmental standards, advising the Central Government, and coordinating State Boards.

28
New cards

State Pollution Control Board (SPCB)

The state-level regulatory body created under Section 4 of the Water Act, 1974, responsible for inspecting facilities, granting industrial consent, monitoring ambient quality, and enforcing environmental compliance.

29
New cards

Section 24 (Water Act, 1974)

A statutory prohibition that makes it unlawful to knowingly discharge poisonous, noxious, or polluting matter into any stream, well, sewer, or land.

30
New cards

Section 25 (Water Act, 1974)

The mandate requiring industrial operations to obtain prior consent from the State Pollution Control Board before establishing any new outlet or initiating any discharge of sewage or trade effluent.

31
New cards

Section 43 (Water Act, 1974)

A penal provision imposing mandatory imprisonment ranging from 1.5 to 6 years1.5\text{ to }6\text{ years} plus a fine for contravening Section 24 by discharging unauthorized polluting matter into water bodies.

32
New cards

Section 45 (Water Act, 1974)

A recurring penalty provision levying an additional fine of up to ₹5,000/day\text{₹}5{,}000/\text{day} for continuing violations following an initial conviction under the Act.

33
New cards

Section 46 (Water Act, 1974)

The corporate liability clause holding directors, managers, and engineers in charge personally liable for offenses committed by a company, unless they prove the offense occurred without their knowledge or that due diligence was exercised.

34
New cards

Minimum National Standards (MINAS)

Baseline national effluent discharge standards formulated by the Central Pollution Control Board (CPCB) which State Boards can make more stringent, but not more lenient.

35
New cards

Forest (Conservation) Act, 1980

An act passed to prevent deforestation that stripped state governments of unilateral power to divert forest land, requiring mandatory prior approval from the Central Government for any non-forest use.

36
New cards

Compensatory Afforestation Fund Management and Planning Authority (CAMPA)

The administrative body managing funds deposited by project proponents to finance afforestation over equivalent non-forest land or twice the area of degraded forest when forest lands are diverted.

37
New cards

Godavarman Judgment (1996)

A Supreme Court ruling expanding the jurisdiction of the Forest (Conservation) Act, 1980 to all tracts meeting the dictionary meaning of 'forest', regardless of administrative classification or ownership status.

38
New cards

Wildlife (Protection) Act, 1972

A national statute enacted in 1972 providing comprehensive legal protection to wild animals, birds, and plants, establishing protected area networks, and banning commercial hunting and unauthorized trade.

39
New cards

Schedule I (Wildlife Protection Act)

The highest statutory protection tier under Indian wildlife law (covering tigers, elephants, rhinos, snow leopards, and great Indian bustards), carrying mandatory penalties of 3 to 7 years3\text{ to }7\text{ years} imprisonment for hunting or trading.

40
New cards

CITES

The Convention on International Trade in Endangered Species of Wild Fauna and Flora; a 1973 global treaty entered into force in 1975 (joined by India in 1976) regulating cross-border commercial trade in wild animal and plant specimens.

41
New cards

National Board for Wildlife (NBWL)

An apex wildlife authority chaired by the Prime Minister of India whose statutory clearance is required for development projects located within 10 km10\,\text{km} of a national park or wildlife sanctuary.

42
New cards

United Nations Framework Convention on Climate Change (UNFCCC)

The parent international climate treaty adopted at the 1992 Rio Earth Summit to stabilize atmospheric greenhouse gas concentrations without initially imposing legally binding emissions caps.

43
New cards

Common But Differentiated Responsibilities and Respective Capabilities (CBDR-RC)

A foundational climate diplomacy principle acknowledging that all states share the obligation to address climate change, but developed nations bear greater historical responsibility and financial/technological capacity.

44
New cards

Kyoto Protocol

Adopted on December 11, 1997, at COP3 and entering into force on February 16, 2005, this first legally binding climate treaty committed Annex I industrialized nations to aggregate emission cuts of at least 5%5\% below 1990 levels during 2008–2012.

45
New cards

Annex I Countries

The group of industrialized nations listed under the Kyoto Protocol (including the EU, Japan, Russia, and Australia) subject to legally binding greenhouse gas reduction targets.

46
New cards

Clean Development Mechanism (CDM)

A Kyoto Protocol flexible mechanism under which Annex I developed countries invest in emission-reduction projects in Non-Annex I developing nations to earn Certified Emission Reduction (CER) credits.

47
New cards

Joint Implementation (JI)

A Kyoto Protocol market mechanism allowing an Annex I industrialized country to invest in emission-reduction projects in another Annex I nation to earn emission reduction units (ERUs) toward its target.

48
New cards

Emissions Trading

A cap-and-trade market mechanism under the Kyoto Protocol enabling countries that reduce emissions below assigned allowances to sell surplus units to other nations struggling to meet their targets.

49
New cards

Paris Agreement (2015)

A universal climate agreement adopted at COP21 by 196 parties to limit global temperature rise to well below 2∘C2^\circ\text{C}, while pursuing efforts toward 1.5∘C1.5^\circ\text{C} above pre-industrial levels, via bottom-up national commitments.

50
New cards

Nationally Determined Contributions (NDCs)

Autonomous, bottom-up national climate action plans submitted by countries under the Paris Agreement outlining mitigation targets, adaptation strategies, and financing needs.

51
New cards

Ratchet Mechanism

A procedural rule in the Paris Agreement requiring all member parties to submit updated NDCs every 5 years5\text{ years}, with each subsequent submission required to be more ambitious than the last.

52
New cards

Net-Zero Emissions

A state achieved under Article 4 of the Paris Agreement where anthropogenic greenhouse gas emissions entering the atmosphere are balanced by an equal quantity removed via natural sinks or engineered technologies.

53
New cards

Global Stocktake

A collective assessment mandated every 5 years5\text{ years} under Article 14 of the Paris Agreement to evaluate global progress toward long-term temperature, adaptation, and finance goals, first completed at COP28 in 2023.

54
New cards

Sustainable Development

Development that meets the needs of the present without compromising the ability of future generations to meet their own needs, as framed by the Brundtland Commission.

55
New cards
<p>Sustainable Development Goals (SDGs)</p>

Sustainable Development Goals (SDGs)

A universal set of 17 interconnected global development goals adopted by the United Nations in New York in September 2015 to eradicate poverty, safeguard the environment, and ensure prosperity by 2030.

56
New cards
<p>Environmental Impact Assessment Process</p>

Environmental Impact Assessment Process

A linear, staged workflow comprising Initial Screening, Scoping, Impact Assessment, Mitigation Measures, Public Consultation, Review and Decision Making, Implementation of Project and EMP, and Monitoring and Evaluation.

57
New cards
<p>Economic Activity and the Environment Framework</p>

Economic Activity and the Environment Framework

A macroeconomic relationship from the World Development Report 1992 demonstrating that environmental quality is determined by the Scale of the economy (income per capita ×\times population) ×\times output structure ×\times input-output efficiency ×\times environmental damage per unit of output.