Lesson 24 - Explain Elements of the Risk Management Process

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/47

encourage image

There's no tags or description

Looks like no tags are added yet.

48 Terms

1
New cards

Risk

uncertainty of an outcome

2
New cards

Risk Volatility

extent to which the level of risk is likely to change over time

3
New cards

Risk Velocity

- measures how fast an exposure can impact and organization

- time between the event and when the organization first feels its effects

4
New cards

Cascading Risk

- principle that risks are often linked, and failing to address one risk could cause a chain reaction

- can be parallel, serial, or mixed

5
New cards

Risk Appetite

the level of risk that a company is comfortable engaging in

6
New cards

Expansive Risk Appetite

willingness to take on a high degree of risk

7
New cards

Conservative Risk Appetite

preference for low risk activities and a focus on minimizing losses

8
New cards

Neutral Risk Appetite

balancing risk and reward in pursuit of both long-term stabilitiy and growth

9
New cards

Risk Tolerance

acceptable variance in outcomes related to specific performance measures

10
New cards

Risk Assessment

- structured method of understanding risk

Identification -> Analysis -> Evaluation -> Response

11
New cards

Risk Analysis

process of determining likelihood, impact, and risk level

12
New cards

Risk Evaluation

process of comparing result of risk analysis with the organization's risk appetite and risk tolerance

13
New cards

Inherent Risk

level of risk before controls are implemented

14
New cards

Residual Risk

level of risk after controls are implemented

15
New cards

4 Options for Risk Assesment Frequency

ad hoc, recurring, one time, continuous

16
New cards

Qualitative Risk Analysis

- uses well-define descriptiver terminology to indicate likelihood, impact, and residual risk

- good for when there are non-tangible elements of risk (e.g. reputation)

17
New cards

Quantitative Risk Analysis

assisgns numerical values to all elements of the analysis

18
New cards

AV (Asset Value)

monetary value of the resource

19
New cards

EF (Exposure Factor)

percent of the asset value that would be impacted

20
New cards

SLE (Single Loss Expectancy)

- SLE = AV X EF

- financial impact of a single event

21
New cards

ARO (Annualized Rate of Occurence)

how many times and event is expected to occur within a single year

22
New cards

ALE (Annual Loss Expectancy)

ALE = SLE X ARO

- financial impact on an annualized basis

23
New cards

Risk Response

the responsibility to determine how to respond to the outcome of a risk analysis

24
New cards

Risk Treatment

to select one or more options for addressing an identified risk

25
New cards

4 Risk Treatment Options

Avoid, Transfer, Mitigate, Accept

26
New cards

Avoid Risk

eliminate the cause or terminate the associated activity

27
New cards

Transfer Risk

- assign the risk to another party, generally via insurance

- typically done when the likelihood is low but the impact is high

28
New cards

Mitigate Risk

reduct the impact or likelihood by implemented controls or safeguards

29
New cards

Accept Risk

acknowledge and accept the level of risk and monitor it

30
New cards

Risk Exception

formal acknowledgment that a risk has been identified but its not feasible/practical to implement controls

31
New cards

Exception Handling

process of approving an exception on a temporary or permanent basis

32
New cards

Risk Exemption

- formal decision not to address a risk at all

- when potential impact is low and mitigation cost is disproportionate to impact

33
New cards

Risk Monitoring

continuous activity used to identify trends, failures, or opportunitites and respond in an efficient and appropriate manner

34
New cards

Risk Reporting

process of communicating real-time risk and performance data to stakeholders

35
New cards

Risk Register

dynamic, central repository for all risk-related documentation, tracking, and accountability including acceptance, exceptions, and exemptions

36
New cards

Heat Map

visualization tool to convey likelihood of impact

37
New cards

Dashboard

visualization tool to convery security posture

38
New cards

Metrics

predefined measures usually int he form of KRIs (Key Risk Indicators

39
New cards

KRI (Key Risk Indicator)

predictor of unfavorable events

40
New cards

Leading Indicator

- predicitive in nature

- looks forward at future outcomes

41
New cards

Lagging Indicator

- historical in nature

- looks back on what has happened

- based on historical measure to identify trends

42
New cards

BIA (Business Impact Analysis)

used to determine criticality and impact, recovery requirements, and recovery priority of system components and interdepencies

43
New cards

MTD (Maximum Tolerable Downtime)

maximum time a service can be down without causing significants damage to the business

- a.k.a Max Tolerable Outage

44
New cards

SDO (Service Delivery Objective)

- acceptable level of operations in alternate processing mode

- operations are less than normal but enough to sustain business functions until full recovery

45
New cards

RTO (Recovery Time Objective)

- amount of time allocated for system recovery before negatively impacting other systems

- combined RTO of all impacted systems should be less than MTD

46
New cards

RPO (Recovery Point Objective)

- the acceptable data loss

- the point in time, prior to the disruption that data can be recovered

47
New cards

MTTR (Mean Time to Repair)

- average time it takes to repair a failed component or device

- this metric typically comes from the manufacturer

48
New cards

MTBF (Mean Time Between Failures)

- measure of reliability (stated in hours)

- this metric typically comes from the manufacturer