1/57
Looks like no tags are added yet.
RA 6541
Original NBCP enacted in 1972.
1972
In what year was RA 6541 enacted?
PD 1096
This Presidential Decree revised RA 6541.
1977
In what year was PD 1096 issued?
PD 1096 revised RA 6541
Which statement correctly describes the relationship between RA 6541 and PD 1096?
To provide detailed rules for implementing PD 1096
What is the primary purpose of the IRR of PD 1096?
2005
When did the Revised IRR of PD 1096 become effective?
Ordinances by LGU
Hierarchy of Laws
May supplement but must not contradict any national law.
Administrative Issuances to Implement National Laws
Hierarchy of Laws
e.g. Presidential Proclamations, Letters of Instruction, EO, Administrative Orders, Memorandum Circulars.
National Laws and International Treaties / Agreements
Hierarchy of Laws
e.g. Acts, Commonwealth Acts, BP, RA, PD issued during the Marcos era and EO issued by President Aquino prior to the 1987 Constitution)
Philippine Constitution
Highest level in the hierarchy of laws.
Constitution, National, Admin, Local
Hierarchy of Laws (from highest to lowest)
General Provisions
Rule 1
Administration and Enforcement
Rule 2
Permits and Inspection
Rule 3
Types of Construction
Rule 4
Requirements of Fire Zones
Rule 5
Fire-Resistive Requirements in Construction
Rule 6
Classification and General Requirements of All Buildings
Rule 7
Light and Ventilation
Rule 8
Sanitation
Rule 9
Building Projection Over Public Street
Rule 10
Protection of Pedestrians During Construction or Demolition
Rule 11
NBCP
Its purpose is to safeguard life, health, property, and public welfare, consistent with the principles of sound environmental management and control.
NBCP
Its purpose is to provide for all buildings minimum standards and requirements to regulate and control their location, site, design, quality of materials, construction, use, occupancy, and maintenance.
Traditional Indigenous Dwellings and BP 220 Projects
NBCP covers everything related to buildings EXCEPT _________________.
Addition
Any new construction which increases the height and / or floor area of existing buildings / structures.
Alteration
Works in buildings / structures involving changes in the materials used, partitioning, location / size of openings, structural parts, existing utilities and equipment but does not increase the building height and / or floor area.
Building Official
The Executive Officer of the OBO appointed by the Secretary.
Secretary
The Building Official of the OBO is appointed by the _______________.
Building Permit
A document issued by the Building Official (BO) to an owner / applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, moving, demolition or other work activity of a specific project / building / structure.
Construction
All on-site work done in the site preparation, excavation, foundation, assembly of all the components and installation of utilities, machineries and equipment of buildings / structures.
Conversion
A change in the use or occupancy of buildings / structures or any portion / s thereof, which has different requirements.
Demolition
The systematic dismantling or destruction of a building / structure, in whole or in part.
Office of the Building Official (OBO)
The Office authorized to enforce the provisions of the Code and its IRR in the field as well as the enforcement of orders and decisions made pursuant thereto.
Renovation
Any physical change made on buildings / structures to increase the value, quality, and / or to improve the aesthetic.
Repair
Remedial work done on any damaged or deteriorated portion/s of building / structure to restore to its original condition.
Moving
The transfer of buildings / structures or portions thereof from original location or position to another, either within the same lot or to a different one.
National Building Code Development Office
NBCDO
Technical Staff
The NBCDO shall serve as the _______________ of the Secretary.
NBCDO as Technical Staff
Duties:
Assist secretary
Review, evaluate, and take final action
Conduct seminar on the Code and BP344
Secretary
Duties:
Formulate policies
Issue additional rules and regulations
Review appeals over decisions of BO
Evaluation and approval of codes
Appoint BO in all Cities and Municipalities
Building Officials
Duties:
Carry out and enforcement of code in the field.
Administrative supervision of building works in his area.
Processing of permits
Issuance of certificates
Annual inspections
Issuance, suspension, revocation of permits
Stoppage of work
Submit quarter reports to Secretary
Prescribe
Secretary ___________ rate of fees.
Collects
Building official ___________ fees.
20%
Percentage retained for office Operational cost.
80%
General fund of municipality.
Public buildings, traditional dwellings with native materials not more than 15k
Exemption of fees.
10k
Fine for:
Construction without building permit
Unauthorized change during the construction
Non-compliance with work stoppage
Non-compliance with demolition order
Use of building without Certificate of Occupancy
Failure to post Certificate of Occupancy
Change in type of construction without permit
Light Violation 5k
Fine for:
Failure to post Certificate of Occupancy
Failure to post Building Permit
Failure to provide Safety measures for workers
Less Grave Violation 8k
Fine for:
Non-compliance with work stoppage for repair order
Use of building without Certificate of Occupancy
Grave Violations 10k
Fine for:
Unauthorized change during construction
Non-compliance with order to demolish
Non-compliance with work stoppage for construction / demolition without permit
Change in occupancy
Excavation left open more than 120 days
10% of building permit fees
Penalty for excavation for foundation.
25% of building permit fees
Penalty for construction of foundation (including pile driving and laying of reinforcing bars).
50% of building permit fees
Penalty for construction of superstructure UP TO 2m above established grade.
100% of building permit fees
Penalty for construction of superstructure ABOVE 2m.
Dangerous Buildings
Declared as such or are structurally unsafe or a fire hazard and dangerous to human life.
written notice, 15 days
After the declaration of BO that the building is dangerous, a _______________ shall be served to the occupants and the occupants should vacate within _______ for repair, or demolition of the building.