1/17
Vocabulary practice cards covering assessor oral questioning, scenarios, and hardware/networking troubleshooting concepts for the TESDA Computer Systems Servicing (CSS) NC II assessment.
BIOS / UEFI
The firmware software configured on a computer prior to installing the operating system.
Boot Sequence
The BIOS/UEFI setting configured to determine the order of boot devices (such as a USB flash drive) so the OS and server services load correctly.
Bootable USB Installer
The installation medium created to install Windows on a client computer that lacks a DVD drive.
Power-Related Issue
The probable diagnosis when a desktop computer displays no lights, emits no beeps, and has no fan movement.
Voltmeter
The tool used to measure and verify whether a Power Supply Unit (PSU) delivers the correct voltage output.
Client–Server Network
The network architecture recommended for environments connecting more than 100 computers.
Peer-to-Peer Network
The network type best suited for environments connecting only a few personal computers.
LAN Cable Tester
The diagnostic tool used to check whether a suspected network patch cable is defective.
Windows Network Diagnostics
The built-in Windows utility that assists in troubleshooting and diagnosing network connection problems.
Dual-Boot Setup (Win7 and Server 2008)
The installation procedure consisting of: Partition drive → Install Win7 → Install Server 2008.
RID Master
An Active Directory domain role, of which exactly one (1) exists per domain.
Memory Diagnostic Tools
Software tools used to test RAM when a computer repeatedly encounters Blue Screen of Death (BSOD) errors or random crashes.
UPS (Uninterruptible Power Supply)
A hardware device deployed to protect computer equipment in areas where voltage fluctuations are common.
USB Flash Drive Troubleshooting Procedure
The scenario troubleshooting sequence when a PC does not detect a bootable drive: Check BIOS → Test USB flash drive on another port → Recreate installer.
Office Network Outage Action Sequence
The immediate troubleshooting process when multiple users report no internet: Restart router → Check cabling → Verify DHCP → NIC troubleshooting.
App Freezing Diagnostic Sequence
The evaluation process when a PC freezes when opening large applications: Check RAM → Check storage health → Check PSU → Run diagnostics.
Newly Built PC No-Display Troubleshooting
The diagnostic sequence when a newly assembled system produces no display: Check power → Reseat RAM → Check output ports → Check monitor cable.
TESDA CSS NC II Competency Areas
The four core areas covered in oral questioning: installing & configuring systems, cabling & network setup, server setup, and maintenance & repair.