How can erosion be stopped or slowed down?
Hard engineering
Soft engineering
What is hard engineering?
Man-made structures to prevent erosion.
What is soft engineering?
A sustainable approach to managing the coast without using artificial, man-made structures.
Name the 4 examples of hard engineering
Sea walls
Rock armour
Groynes
Gabions
What is a Sea wall?
A barrier between the waves and the land.
A recurved wall turns waves back to the sea, reducing the energy so it is less explosive.
Name a few positives of Sea walls
Gives people a sense of security
Can last many years if well maintained
Opportunities for developing the top of the wall into a walkway/stalls.
Name a few negatives of Sea walls
Can be considered ugly
Do not prevent movement of sediment along the coast
Restricts access to the beach
Reflected waves scour the beach below the sea wall, this can undermine the foundations if not repaired
What are Groynes?
Long wooden or stone structures built along the beach
Built at 90ā° to the beach, roughly 50m apart
Trap sediment transported by longshore drift
Create larger beaches which protects the land behind form erosion
Name a few positives of Groynes
A larger beach attracts more tourists
Very effective at trapping sand and making the beach wider
What is Rock armour?
Thousands of tonnes of huge boulders of hard rock, that provides a barrier between the sea and the land
The rock is imported in from Norway
Water enters the gaps between boulders, releasing pressure and the waves energy
Name a few positives of Rock armour
Relatively cheap
Quick to build
Easy to maintain
Name a few negatives of Rock armour
Makes access to the beach difficult
It can be considered ugly
Imported rocks donāt blend in with local rocks
What are Gabions?
Steel wire/mesh cages filled with pebbles or rocks
Placed at the back of a sandy beach to create a low-wall structure
Water enters the cage and this absorbs waveās the energy
Name a few of the positives of Gabions
Relatively cheap and easy to construct (Ā£500/metre)
Blend in better than than other hard engineering methods - vegetation often covers them
Name a few of the negatives of Gabions
Damaged gabions can injure birdās feet
Can only be used on sandy beaches, as shingle thrown at them would damage them
Easy to damage so need to be regularly maintained
Only last around 10 years before they start to rust
What are the 4 examples of soft engineering
Beach nourishment
Beach reprofiling
Sand dune regeneration
Coastal realignment (managed retreat)
What is Beach nourishment?
Replacing sediment that has been lost from a beach
Name a few positives of Beach nourishment
Makes wider beaches so wave energy is absorbed and dissipated
Beaches are a natural defence against erosion
Wider beaches for users
Retains natural appearance of the beach
Name a few negatives of Beach nourishment
High costs (Ā£300,000 to hire a dredger)
Affects offshore ecosystems
Increases erosion elsewhere
Constant maintenance and profiling is required, particularly after winter storms
What is Beach reprofiling?
Moving sand from the lower to the upper part of the beach. This occurs after winter, when bulldozers move sediment back up the beach
Name a few of the positives of Beach reprofiling
Fewer waves reach the back of the beach, so rate of erosion is slowed
Widens beach
Cheap and simple
Name a few of the negatives of Beach reprofiling
Only works when wave energy is low
Constant maintenance is required, especially after winter storms
What is Sand dune regeneration and give one example?
The artificial creation of new sand dunes or the restoration of existing dunes
Formby
Name a few of the positives of Sand dune regeneration
Sand dunes absorb wave energy and act as a barrier between sea and land
Natural process
Attracts tourism
May increase biodiversity
Name a few of the negatives of Sand dune regeneration
Costs £4-£20 per metre
Time consuming to plant grass and maintain the area
Constant maintenance and reprofiling required, particularly after winter storms
What coastal realignment process was used in Medmerry?
Managed retreat
What is Managed retreat?
When a decision is made to no longer āhold the lineā
All existing sea defences are removed, allowing the land behind to to flood
People are moved out, buildings demolished and a beach is made in the existing sea defences
What was the problem in Medmerry?
The Environment Agency (EA) considered the area to the west of Selsey to be the area of South-East England most at risk of flooding due to climate change
What strategy was used in Medmerry?
Build a new embankment 2km inland from the shore to protect properties behind
Behind the embankment a channel was built to collect draining water, which flows into intertidal area
Rock armour was placed on the seaward edges of the embankment
One the embankment and rock armour were in place a 110m beach was made in the shingle bank to allow the sea to flood the land and create an intertidal area
Name a few of the positives of the Medmerry project
Selsey now has 1 in 1,000 chance of costal flooding
Tourism, the main contributor to the local economy, is expected to increase
The area is turning into a huge nature reserve managed by the RSPB
Name a few of the negatives of the Medmerry project
Ā£38 million spent on scheme
Despite planning, habitats of existing species such as badgers would have been disturbed
3 farms had to be abandoned
Losing good farming land was viewed by some people as āwastefulā