Deck 15 - Disaster Recovery

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/12

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 8:52 PM on 9/25/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

13 Terms

1
New cards

RPO

Recovery Point Objective: the maximum acceptable amount of data loss that a business can tolerate, measured in units of time

2
New cards

RTO

Recovery Time Objective: the maximum acceptable length of time a system, application, or service can remain offline after an unexpected disruption before the business impact becomes unacceptable.

3
New cards
RPO vs RTO (key exam distinction)
RPO measures the tolerable amount of data loss before a disaster; RTO measures the tolerable amount of downtime after a disaster before service is restored.
4
New cards

MTBF

Mean Time Between Failure: the average working time between unplanned breakdowns of a repairable system; a higher MTBF suggests greater reliability and stability.

5
New cards

MTTR

Mean Time to Repair: The average time required to repair a failed component or device and return it to normal operations; a lower MTTR indicates more efficient fault recovery.

6
New cards
Cold Site
The most affordable recovery site type, but takes the most time to recover; contains no equipment, connections, or data, requiring days to weeks to recover.
7
New cards
Warm Site
A recovery site more expensive than a cold site but offering faster recovery; contains some equipment and connections, but with out-of-date configurations and data sets, requiring hours to days to recover.
8
New cards
Hot Site
The most expensive recovery site type but offers the fastest recovery time; contains all equipment, connections, and recent configurations and data sets, requiring minutes to hours to recover.
9
New cards
Active-Active Configuration
A setup where both systems run simultaneously, distributing the load to maximize performance and availability.
10
New cards
Active-Passive Configuration
A setup where one system is operational while the other stands by, ready to take over if the primary system fails, ensuring continuity but with potential downtime during the switchover.
11
New cards
Disaster Recovery Testing
A critical component of disaster recovery planning that ensures recovery procedures are effective and up-to-date; regular testing helps organizations prepare for and manage potential disruptions.
12
New cards
Tabletop Exercises
Discussion-based sessions where team members walk through various disaster scenarios to evaluate the effectiveness of the disaster recovery plan, without activating actual resources.
13
New cards
Validation Tests
Tests that involve the actual execution of disaster recovery processes to verify that systems and data can be restored in accordance with recovery objectives.