Manufacturing Metrics and Economics

0.0(0)Studied by 0 people
Build your Mastery score
multiple choiceMultiple Choice & FRQ
call kaiCall Kai
Card Sorting

1/17

flashcard set

Earn XP

Description and Tags

Production performance metrics, manufacturing costs

Last updated 1:31 AM on 10/15/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

18 Terms

1
New cards

Operation Cycle Time

Time spent on one work unit being processed/assembled. Cycle time does not include set up time but does include Processing time for operations, Handling time from machining, and tool handling time for changing tools.

2
New cards
<p>Discrete Production</p>

Discrete Production

a) Job shop

b) Sequential Batch Production

c) Simultaneous Batch Production

d) Quantity Mass Production

e) Flow-line Mass Production

3
New cards

Production Rate

Expressed as an hourly rate or work units completed every hour

4
New cards

Sequential Batch +Simultaneous Batch + Quantity Type Processing

Tb=Tsu+QTc

Tp=Tb/Q

Rc=60/Tc

5
New cards

Flow Line Mass Production

Tc=MAXTo+Tr

Rc=60/Tc

Where To is operation time at bottle neck and Tr is time to transfer work units between stations

6
New cards

Job Shop Equation

Tp=Tsu+Tc

Rp=60/Tp

Q=1

where Tp is average production time and Rp is Production Rate

7
New cards

Availability

A=(MTBF−MTTR)MTBFA=\frac{\left(MTBF-MTTR\right)}{MTBF} Where MTBF is mean time between failures and MTTR is mean time to repair

8
New cards

Production Capacity

Maximum rate of output that a production facility is able to produce under a given set of operating conditions.

PC=nHpcRpPC=nH_{pc}R_{p} Where Hpc is # hours in period

<p>Maximum rate of output that a production facility is able to produce under a given set of operating conditions.</p><p>$$PC=nH_{pc}R_{p}$$ Where H<sub>pc </sub>is  # hours in period </p>
9
New cards

Utilization

Time that a productive resource is used relative to the time available under definition of plant capacity

<p>Time that a productive resource is used relative to the time available under definition of plant capacity</p>
10
New cards

Workload (WL)

WL=ΣQTpWL=\Sigma QT_{p}

Total hours required to produce a given number of units during a given week or period

<p>$$WL=\Sigma QT_{p}$$ </p><p>Total hours required to produce a given number of units during a given week or period </p>
11
New cards

Adjust plant capacity short term

Increase/decrease # of workers

Increase/decrease shifts per week

Increase/decrease hours per shift

12
New cards

Adjust plant capacity long term

Increase number of machines

Increase production rate Rp

13
New cards

Manufacturing Lead Time (MLT)

Total time required to process a given part or product through the plant including time for delays, material handling, queues before machines


<p>Total time required to process a given part or product through the plant including time for delays, material handling, queues before machines</p><p></p>
14
New cards

Work In Progress (WIP)

Quantity of parts currently located in the factory that are being processed or are between processing operations

<p>Quantity of parts currently located in the factory that are being processed or are between processing operations</p>
15
New cards

Major Categories of manufacturing costs

Fixed costs - remain constant for any output level

Variable costs - vary in proportion to production output level

<p>Fixed costs - remain constant for any output level</p><p>Variable costs - vary in proportion to production output level</p>
16
New cards

Overhead Rate

knowt flashcard image
17
New cards

Cost of Equipment Usage

knowt flashcard image
18
New cards

Cost of a Manufactured Part

knowt flashcard image