RAWS (1C873) 7-Lvl CDC STQs

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
full-widthPodcast
1
Card Sorting

1/108

encourage image

There's no tags or description

Looks like no tags are added yet.

109 Terms

1
New cards

Who appoints the CFM?

AF/A3O.

2
New cards

Which FM position monitors the health and manning of their career field, within their command, and elevates concerns?

MFM.

3
New cards

Which FM position reports manning information to the MFM for an accurate portrayal of base staffing?

BFM.

4
New cards

Manpower reflects what skill-levels are needed to accomplish the required workload?

The minimum essential level.

5
New cards

Who is the approval authority for all manpower standards applicable to Air National Guard units?

NGB/J1/OM.

6
New cards

What does the AF consider as the primary indicator of experience and/or effectiveness required for assigning enlisted personnel?

Enlisted skill level.

7
New cards

State four products utilized to administer manpower at the unit level.

(1) UMD. (2) UPMR. (3) PEC. (4) ACR.

8
New cards

Why are manpower studies conducted?

To establish or change existing manning within a MAJCOM, base, or work center.

9
New cards

What is the purpose of the AF OA program?

To equip senior leaders and managers of AF personnel and training programs with objective and factual information about AF occupations and civilian occupational series.

10
New cards

What does the airfield operations flight provide to the OSS?

Airfield management and air traffic operations services to the base flying wing, transient, and civil users to include control tower, RAWS, and base operations functions.

11
New cards

Name the OSS flight that coordinates wing combat mission planning and sortie allocation.

OSO.

12
New cards

During contingencies, which squadrons provide the theater AF commander a rapid reaction mobile air control system and a control and reporting center?

Air control squadrons.

13
New cards

What entity creates procedures and applies criteria to worldwide airfield operations throughout the AF?

AFFSA.

14
New cards

What three systems form a complete airfield package?

The AN/TPN-19, together with the AN/MSN-7, and the TACAN.

15
New cards

Who provides in-theater wartime and emergency peacetime restoration of communications and information systems?

The 85 EIS.

16
New cards

What ability does the GTACS provide to the deployable mission?

The ability to rapidly detect and identify airborne targets with minimal or no support.

17
New cards

Who is responsible for developing the MTP?

Supervisors, assisted by the UTM.

18
New cards

What is the backbone of the training plan?

MTL.

19
New cards

Who ensures that trainers are providing a quality OJT product?

Supervisors.

20
New cards

What type of feedback describes what a trainee is doing correctly?

Positive feedback.

21
New cards

Who is able to perform evaluations in the work center?

A MSgt, work center supervisor, or 7-level technician as long as the evaluator is not the individual's trainer.

22
New cards

Who is responsible for overseeing the application of MICT?

Work center NCOIC.

23
New cards

What is a contract index?

A list or spreadsheet that contains all your contracts and important information for each.

24
New cards

As a minimum, what should the contract index contain?

(a) Contract number. (b) POC. (c) Assigned quality assurance evaluator. (d) Brief description of services being supplied. (e) Dollar limitations.

25
New cards

What is the purpose of a change clause?

Authorizes the government to make modifications to the contract.

26
New cards

Why should you use a supplemental agreement instead of a change order?

It lessens the chance of dispute with the contractor.

27
New cards

What is a modification?

Changes to hardware or software to meet increased mission requirements.

28
New cards

List the four steps in the modification proposal process?

(1) Request for actions and organizational validation. (2) Lead and Using command validation. (3) The PM reviews and approves the technical requirements and solution. (4) Lead command certification and approval.

29
New cards

For what length of time are modification documents maintained?

Throughout the modified assets life cycle.

30
New cards

What is ETIMS?

The AF system of record, a secure Web, GCSS-AF application accessible via the AF Portal with the TO catalog ordering and TODO account management functions.

31
New cards

How do you obtain access to ETIMS?

Prospective users must first obtain a CAC or an ECA with a minimum of a favorable NACI to establish access to the AF Portal. Once logged on to the AF Portal home page, ETIMS is accessed from the "Applications A-Z listing."

32
New cards

How are COTS manuals acquired?

COTS manuals are acquired using the USAF TMCR (TM 86-01) for centrally procured and managed (NSNs assigned) equipment, no matter the format, and will be evaluated for effectiveness and content IAW MIL-PRF-32216, Evaluation of Commercial Off-The-Shelf (COTS) Manuals and Preparation of Supplemental Data.

33
New cards

Describe the services the ADX site provides.

The ADX site is the primary site for maintenance and repair information for the DASR and STARS. It is the storehouse that maintains all the TOs and updated adaptation files. It also provides data and collaboration services.

34
New cards

What is your primary mission as a 7-skill level technician?

To ensure that your equipment is able to perform as expected.

35
New cards

What is the purpose of an equipment evaluation?

EEs give an overall view of the quality of RAWS maintenance.

36
New cards

How many AFMQCC MICT checklists should you use when performing an EE?

As many checklists as are applicable to the equipment being evaluated.

37
New cards

How are core EEs different from other EEs?

Regular EEs can be performed on any base equipment item. Core EEs are performed on items listed as "mission essential."

38
New cards

What is the purpose of the equipment status?

The status is a way of letting leadership know if the equipment is operating normally, partially, or is not operating at all.

39
New cards

Which status defines equipment as impaired but usable?

Amber.

40
New cards

Which information system is useful to help managers identify trends and clear up problems?

REMIS.

41
New cards

What reporting system provides the work center with the ability to track equipment inventories, open and close jobs, schedule and document preventive maintenance, and document ancillary training?

IMDS.

42
New cards

What is the purpose of external reporting?

To up-channel the status of assigned resources to leadership.

43
New cards

What is a SITREP?

SITREPs are narrative reports that keep recipients informed of significant outages, events, and/or status and enable higher levels of command to prepare for potential effects of ongoing situations.

44
New cards

Where there is conflicting safety guidance, which guidance should be used?

The guidance that provides the most protection.

45
New cards

When must AFOSH guidance be followed?

At all times.

46
New cards

Who has the authority to grant exemptions to OSHA standards?

Only the DOL.

47
New cards

What is the key to preventing injuries at work?

Understanding what the hazards are and how to deal with them.

48
New cards

What factors determine the severity of electrical shock?

The amount of current flowing through the body, the time of exposure, and the body's physical condition.

49
New cards

What injuries may occur as a result of arcing?

Serious burns to the body and temporary or permanent blindness.

50
New cards

Why is arcing extremely dangerous?

Because you don't actually have to come in contact with the source of electricity.

51
New cards

What safety precautions should you take when working on energized equipment?

(1) Do not wear rings, watches, or other conductive objects. (2) Do not use or carry in pockets metallic objects. (3) Always have a safety observer. (4) Electrical circuits should always be de-energized and locked/tagged out. (5) All workers will know emergency cut-off procedures. (6) Interlocks shall not be permanently bypassed. (7) Grounded railing, barriers, or enclosures shall be used to protect workers from shock.

52
New cards

Define high-voltage?

600 volts or greater.

53
New cards

Who performs health risk assessments for all EMF transmitters owned and operated by communications facilities?

BE.

54
New cards

How do administrative and physical controls prevent EMF exposure to workers?

They provide access restrictions or physical barriers to keep workers out of the exposure area.

55
New cards

What is the difference between a flammable liquid and combustible liquid?

Flammable liquids have a closed cup flashpoint below 100° F; Combustible liquids have a closed cup flashpoint at or above 100° F.

56
New cards

Why is it important to maintain a clean and neat work area?

Messy areas can lead to accidents, which can not only injure personnel but also have a detrimental effect on the work center.

57
New cards

Why should shields be installed on fluorescent light fixtures?

To prevent tubes from falling out or being accidentally damaged.

58
New cards

Who is responsible for maintaining good housekeeping in the work area?

Supervisors and workers.

59
New cards

What four pillars function as a framework for structuring the AF mishap prevention program and activities used to minimize risk of injuries?

(1) Policy & Leadership. (2) Risk Management. (3) Assurance. (4) Promotion & Education.

60
New cards

The pre-departure safety briefing is especially targeted for personnel of what age?

Under the age of 26.

61
New cards

Who plays the largest role in the workcenter safety program?

The workcenter supervisor.

62
New cards

What are three main reasons for grounding?

(1) Personnel safety. (2) Equipment protection. (3) Noise reduction.

63
New cards

What components can be used for lightning protection in a facility ground system?

(a) Air terminals (lightning rods), or overhead ground wires, to protect structures from direct strikes. (b) Down conductors to provide a low impedance path from air terminals to the earth electrode subsystem. (c) Surge arresters to protect the facility from transient voltages propagated along power and communications lines.

64
New cards

What kind of system are the vast majority of signal reference subsystems categorized as in modern facilities.

Multipoint systems.

65
New cards

Define bonding.

Establishing a low-impedance path between two metal surfaces.

66
New cards

What type of metals should hardware be made of when used in the lightning protection subsystem? Why?

Zinc, copper, cadmium, aluminum, and bronze. Because they do not corrode easily.

67
New cards

What is the only type of bond where soft solder is permitted?

Signal reference bonds.

68
New cards

What are the two basic functions of shielding?

Preventing interference between multiple emanating systems (electrical/communications) and minimizing compromising emanations.

69
New cards

Although power leaked by a cable may be a very small percentage of transmitted power, what could it cause?

It could cause significant interference to sensitive circuits.

70
New cards

Why is evaluating all conductive paths for the escape of compromising emanations difficult?

Because there are so many.

71
New cards

Explain triboelectricity.

The process by which electrical charges are developed results from "friction." The resultant charge is called "triboelectricity" (commonly referred to as "static electricity").

72
New cards

List five ways static electricity can be generated in common day-to-day activities.

(1) Walking across the carpet. (2) Walking on a vinyl floor. (3) Working at a bench. (4) Opening vinyl envelopes. (5) Picking up a common poly bag from a bench.

73
New cards

How long will static electricity hold its charge?

Until there is either a slow current discharge flow or a rapid discharge from an electrical spark discharging the electricity.

74
New cards

What are the three different ESD classes and what are their sensitivity to the voltage of the electrostatic charges?

Class 1 (0-999 volts), Class II (1,000-3,999 volts), Class III (4,000-14,999 volts).

75
New cards

Where is the most effective place to work on ESDS items?

A protected workstation.

76
New cards

What are two ways you can reduce ESD while working at a workbench?

Wear a conductive wrist strap and use an ionizing air blower.

77
New cards

What is the maximum surface roughness height for Area "A" of the localizer?

Must not exceed ±0.5 feet.

78
New cards

What must the area surrounding the localizer be free of within a 500-foot radius of the center of the course array?

It must be free of reflecting objects such as buildings, power lines, wire-mesh fences, trees, or parked aircraft.

79
New cards

What can you do to avoid "screening" when siting radar equipment?

Avoid placing the radar in depressions and valleys.

80
New cards

List five things you should consider when siting radio equipment.

(1) The antenna needs to be high above any obstructions. (2) You must rely on the amount of power produced and the siting of the antenna to push the signal farther out into space to the visible receiving end. (3) Antenna matching to the frequency and impedance of the transmitting radio. (4) The horizontal difference and vertical distances between antennas. (5) Ensure you get the frequency allocations from the base frequency manager before transmitting.

81
New cards

When is a FMQ-19 midfield sensor group normally installed?

Where the runway is longer than 8,000 feet, or at a location that must meet Category II criteria.

82
New cards

If help from your base cable and antenna maintenance work center is necessary to accomplish antenna PMIs, what documentation is necessary to outline the duties to be performed?

Coordinate MOA/MOU to outline specific duties if another party is necessary to help maintain the system in any way.

83
New cards

As a good practice, what other general items can be inspected in maintenance facilities and on remote equipment during PMIs?

Check corrosion, equipment racks, the generator/UPS, animals and insects, dust, environmental controls working properly, ice on systems, and frozen water in ground wells or junction boxes.

84
New cards

What do aircrews do when a navigation system's identification is not received, or the identification code is set to "TEST"?

Consider the navigation signal unreliable.

85
New cards

If a system requires certification, under which tab of the facility records would you file the certification paperwork?

Tab 2, PMI.

86
New cards

Name the five basic types of flight inspections.

(1) Site evaluation. (2) Commissioning. (3) Periodic. (4) Special. (5) Surveillance.

87
New cards

What flight check is the only inspection completed on a recurring basis?

Periodic inspection.

88
New cards

What is the basic scheduled interval, in days, that is required for an ASR system periodic flight check?

540 days.

89
New cards

Newly commissioned precision facilities are initially inspected at what intervals before maintaining an established periodic schedule?

At 90, 180, and 270-day intervals.

90
New cards

Name the three key principles that the AEF is founded.

(1) Predictability. (2) Equitability. (3) Transparency.

91
New cards

What AEF principle is essentially describing a "fair share" for taskings?

Equitability.

92
New cards

What are the four key elements of the AEF structure?

(1) Readily available force. (2) Demand force teams. (3) In-place support. (4) Institutional force.

93
New cards

What key element of the AEF structure consists of unique assets that are considered LS/HD?

Demand force teams.

94
New cards

What AEF element are individuals considered deployable even though their organization does not posture UTCs in the AEF capability library?

Institutional force.

95
New cards

Who makes strategic policy decisions that provide the basis for all military planning and programming?

The National Security Council, chaired by the president.

96
New cards

Define deployment planning.

A continuous, iterative, and highly structured process that allows for an orderly transition from peace to war and then to post-hostilities operations.

97
New cards

What type of plan is driven by current events in real time and normally occurs in emergencies and in the context of time-sensitive situations?

Crisis action planning.

98
New cards

What reference details deployment execution responsibilities and procedures for crisis action and deliberate plans, as well as executing the deployment and reception of equipment and personnel?

AFI 10-403.

99
New cards

In the development phase of the deployment sourcing process, who initiates a request for forces?

CCDRs.

100
New cards

What name is given to a tasking when a non-standard sourcing solution is required?

JET.