Project MGMT Exam Prep

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/31

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:04 AM on 12/11/24
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

32 Terms

1
New cards

Analogous Estimate

An estimate based on the cost that was incurred during a previous, similar project.

2
New cards

Bottom-Up Estimate

An estimate based on the characteristics of each work package in the WBS and Project Scope Statement.

3
New cards

Budget Contingency

The difference between the total approved Project Budget and the current cost estimate.

4
New cards

Detailed Budget

A planning document showing the timing of all planned costs for the project.

5
New cards

Parametric Estimate

An estimate based on the availability of standard rates that are used as a basis for estimating.

6
New cards

Project HR Requirements

A planning document indicating the type of human resources needed and the amount of time they are required for a project.

7
New cards

Project Organization Chart

A hierarchical chart that demonstrates the organization of the project and how the areas of responsibility interrelate.

8
New cards

Project Roles and Responsibilities

A planning document containing a description of the key project roles.

9
New cards

RACI Chart

A specific type of Responsibility Assignment Matrix, with the acronym RACI standing for Responsible, Accountable, Consulted, and Informed.

10
New cards

Responsibility Assignment Matrix

A planning tool used to clarify the planned involvement of people within the project.

11
New cards

Contingency Plan

The actions to be performed in the event that the defined risk occurs.

12
New cards

Residual Risk

The amount of risk remaining after risk response actions have been completed.

13
New cards

Risk

A situation that, if it occurred, could cause a negative impact (threat) or positive impact (opportunity) to the project.

14
New cards

Risk Acceptance

The possibility that the risk will occur is accepted and therefore no action is taken until the risk occurs.

15
New cards

Risk Avoidance

The conditions that cause the risk are removed from the project scope, eliminating any possibility of the risk.

16
New cards

Risk Escalation

The risk is determined to be outside of the scope of the project and is communicated to the appropriate individual or area of the organization for resolution.

17
New cards

Risk Mitigation

Actions are defined that reduce the probability or impact of the risk.

18
New cards

Risk Register

A planning document that contains all identified risks for the project and includes their probability factor, impact factor, risk score, risk response plan, and contingency plan.

19
New cards

Risk Response Plan

The actions to be performed prior to the occurrence of a defined risk, including risk acceptance, mitigation, avoidance, transfer, and escalation.

20
New cards

Risk Transfer

The impact of the risk is transferred to another entity outside of the project.

21
New cards

Crashing

Adding additional resources to activities in order to shorten the duration of a project.

22
New cards

Fast-Tracking

The overlapping of activities in order to shorten the duration of a project.

23
New cards

Project Dashboard

A report that provides a series of indicators that graphically summarize the current performance of a project.

24
New cards

Project Procurement

The portion of project work that is performed externally by another organization.

25
New cards

Project Status Report

A report that provides a description of the project’s current performance.

26
New cards

Quality Assurance Plan

A document containing a description of the tests that will be performed to verify the quality of the deliverables.

27
New cards

Quality Control

The activities performed to verify the quality of the project deliverables according to the Quality Assurance Plan.

28
New cards

Change Control Process

A formal process to approve or reject proposed changes to the project.

29
New cards

Change Request

A document containing information related to a proposed project change that is used during the change control process.

30
New cards

Issue

A condition or situation that, if left unresolved, will reduce the performance or effectiveness of the project.

31
New cards

Issue Log

A document containing information about the project issues that have occurred.

32
New cards

Marginal Propensity to Import

The proportion of an increase in real GDP that is spent on imports, calculated as change in imports (ΔM) divided by change in disposable income (ΔYd).