Construction Documents
Drawings, plans, specifications, etc. associated with a construction project.
General Conditions
Defines the basic rights, responsibilities and relationships of all parties
Special Conditions or Supplementary Conditions
Defines specific conditions related to the project
Drawings (Plans) and Specifications
Drawings and detailed descriptions and requirements for the contractor
Competitive (Low Bid) Contracts
Contracts that are won at the lowest cost
Competitive Sealed Proposal (CSP)
Contracts evaluated with a specific set of factors weighted by the owner
Example of CSP Evaluation criteria
Price
Project Management Team
Overall Understanding of Project
Past Experience
Cost Plus or Cost Reimbursable
Used when it's impossible for the owner and contractor to predict their costs during the negotiation, bid and award process (think proposals at KFM)
Guaranteed Maximum Price (GMP)
The contractor or construction manager guarantees the owner a fixed, maximum price.
Incentive Contracts
Contracts award bonuses for delivery before the due date or higher pay for quality of work
What are Job Order Contracts used for?
Maintenance or field changes.
How does a contractor complete work under Job Order Contracts?
Based on a series of work orders instead of a separate contract for each change.
What are Lump Sum Contracts?
Contracts that provide payment for completion of a well-defined scope of work.
When are Lump Sum Contracts typically used?
When the contractor can accurately estimate the costs.
Negotiated Contracts
Contracts that are won through negotiation rather than bid process.
Unit Price Contract
Used for heavy/highway projects that don't allow the contractor or owner to know the exact material quantities. Based on engineering cost estimates.
Design-Bid-Build
Owner contracts separately with the designer and then the contractor
General Contractor
is a group or individual that contracts with another organization or individual (the owner) for the construction, renovation or demolition of a building, road or other structure.
Construction Manager
person who supervises all or part of a building project
Construction Management at Risk
Construction Manager = General Contractor with a GMP. Incentives the CM to actively manage costs
Design Bid-Build
owner has separate contracts with designer and contractor
Design Build
owner has one contract with designer and contractor as a single unit
Multiple Prime Contractors
when the owner has multiple contracts with specialty contractors and cuts out the prime contractor
Project delivery methods
1. Design-bid-build
2. Construction management
3. Design-build
AS-BUILT drawings
Record drawings completed by the contractor and turned over to the owner at the end of the project identifying any changes or adjustments made to the conditions and dimensions of the work relative to the original plans and specifications.
change orders
additions or deductions to scope of work
notice to proceed
document issued to the contractor after award of contract - access to site and project start date
payment bonds
guarantee that the contractor will pay the subs and material suppliers
performance bonds
guarantee the contractor will perfom the work in accordance with plans and specifications.
how do performance bonds protect the owner
If the work is not completed, the surety can take action to make sure it is completed. I.e. they can put the contract out to bid with other contractors and the contractor must repay the surety
performance bond entities
Principal - contractor
Obligee - client
Surety - company that provides the bond and ensures contractor's performance
prebid conference
A meeting held prior to bid opening for the purpose of explaining the project and answering questions that bidders have with respect to the contract documents and the work.
request for information (RFI)
A formal document used by a contractor to clarify contract requirements, drawing/plan specifications to avoid ambiguous delays during construction
retainage
a project owner will retain (10%) of what the contractor earns until the end of project
shop drawings
supplement the contract drawings to identify fabrication details, makes and models, colors and other details required by the contract
subcontractor
specialty contractor performing under contract to the General contractor
TXDOT will contract for the construction of a new highway. Which Procurement Method will be used?
A) Design-Bid-Build
B) Construction Management at Risk
C) Unit Price
D) Incentive
C) Unit Price - used for heavy/highway projects where costs are based on engineers cost estimate
TXDOT will contract for the construction of a new highway. Which Project Delivery Method will be used?
A) Design-Bid-Build
B) Construction Management at Risk
C) Unit Price
D) Incentive
A) Design-Bid-Build - TXDOT will contract with the designer and the contractors separately
Procurement Method
process of acquiring services from contractors and negotiating/setting up terms of the contract
Project Delivery Method
the owner's overall approach to manage the project from design to completion
TXDOT will contract for the construction of a new highway and will award a bonus for early completion of the project. Which Procurement Method will be used?
A) Design-Bid-Build
B) Construction Management at Risk
C) Unit Price
D) Incentive`
D) Incentive - provides the contractor with a bonus for early completion