1/44
Looks like no tags are added yet.
The elements of brainstorming include (select all that apply):
Evaluate ideas as you brainstorm
Provide ideas out loud
Write down all ideas no matter how wild or silly
Build on the ideas as they are presented
Provide ideas out loud
Write down all ideas no matter how wild or silly
Build on the ideas as they are presented
Some of the shortfalls of brainstorming are (select all that apply):
Unequal participation
No formal method of evaluating the ideas
Generates several ideas that need to be evaluated
People are hesitant to offer crazy ideas
Unequal participation
No formal method of evaluating the ideas
Generates several ideas that need to be evaluated
People are hesitant to offer crazy ideas
(one of these is wrong i got 5.67/6)
The Pugh Concept Selection technique is particularly useful because it allows designers to:
Track the progress of action items
Hybridize concepts
Compare project specifications and required deliverables
Estimate how much time major project tasks will require
Hybridize concepts
In the Pugh Concept Selection technique, concepts are compared:
To a theoretical “perfect” concept
To each other
To a reference concept
To the selection criteria
To a reference concept
When applying the Pugh Concept Selection technique, what is the issue with using something other than a three-point (+, 0, -) rating scale?
The equations used to compute the net score will not work
There is often not enough information to determine the degree to which a concept is better or worse
It violates the copyright owned by Prof. Pugh
It makes it more difficult for the user to hybridize concepts
There is often not enough information to determine the degree to which a concept is better or worse
True or False: When evaluating concepts, the only criteria to consider is that the solution solves the problem.
False

The image below is an example of a:
Box flow diagram
Block diagram
Logic diagram
Subsystem flowchart diagram
Block diagram
A vendor that does not manufacture the products they sell is called a:
Pass-through vendor
Supply chain member
Reseller
Applications provider
Reseller
To follow the K.I.S.S. Principle in your design, you should:
Avoid using off-the-shelf components
Avoid concepts and features that overcomplicate the design
Incorporate stretch goals at the beginning of the design process
Try to improve your prototype by using advanced, cutting-edge technologies
Avoid concepts and features that overcomplicate the design
Which of the following is/are a good practice? Select all that are good.
Using custom-made components instead of purchasing off-the-shelf alternatives
Buying extra units of low-cost parts that are likely to be lost or fail
Planning more time for work than you think it will take
Assume things will work perfectly the first time
Buying extra units of low-cost parts that are likely to be lost or fail
Planning more time for work than you think it will take
Which of the following is a true statement about real-world projects?
They will have changing requirements
You will have to work with incomplete information
Problem may not be well-understood by the sponsor
All of the above
All of the above
What is the difference between a standard and a code?
Group of answer choices
Standards apply only to construction and building projects
Codes apply only to manufacturing quality control
Standards are legally enforceable
Codes are legally enforceable
Codes are legally enforceable
What feature of standards makes them so valuable and useful?
When used in a design, companies cannot be sued if there is a problem
The design requirements they provide never change
They represent the consensus of experts on a given topic
They have the approval of the federal government
They represent the consensus of experts on a given topic
Which of the following can create a new standard?
Any professional or trade society designated by the federal government as a Standards Defining Body (SDB)
Any professional or trade society
Only professional or trade societies with more than 1000 members
Only professional or trade societies that are members of the International Standards Organization (ISO)
Any professional or trade society
Which of the following are characteristics of a safe design? Choose all that apply.
Complies with all applicable standards
Fails infrequently
Remains safe if all instructions in the user manual are followed
Fails in a predictable manner
Complies with all applicable standards
Fails infrequently
Remains safe if all instructions in the user manual are followed
Fails in a predictable manner
You are building a small-parts (e.g., screws, bolts, resistors, etc.) vending machine that is to be used by UTDesign engineers. During testing, the machine works most of the time, but occasionally a part will get stuck and not dispense properly. Your hand tends to get stuck when you reach in to retrieve the part. Which of the following safety features should you implement first?
A warning sign on the vending machine that says “Do not reach into machine”
A tub of butter nearby to help remove stuck hands
Implement a door flap to make it harder for users to stick their hands in the machine
An improved dispenser design that makes it less likely that parts will get stuck
An improved dispenser design that makes it less likely that parts will get stuck
Which of the following is/are benefit(s) of using the FMEA process?
It only requires one person to perform the analysis
Quantitative failure rate data is considered when analyzing reliability
Design changes can be made early in the development cycle
Both B and C
Design changes can be made early in the development cycle
Which one of the following is NOT a step in the basic FMEA process?
Rate the effects of the failure modes
Create a safety matrix that includes all failure modes
Make design changes for failure modes with an RPN that exceeds a threshold
Identify potential failure modes
Create a safety matrix that includes all failure modes
A certain medical device has been approved by the FDA for treating epilepsy (chronic disorder associated with seizures). Some researchers have noted that the same device is also safe and useful for treating depression. Which of the following is true? Select all that are true.
The device’s manufacturer must seek FDA approval specifically for the claim that the device can treat depression before advertising as such.
The device’s manufacturer can advertise that their device can be used for treating depression because research shows it is useful.
A doctor can prescribe use of the device for depression without FDA approval for treating depression.
A doctor can prescribe use of the device for depression only with FDA approval for treating depression.
The device’s manufacturer must seek FDA approval specifically for the claim that the device can treat depression before advertising as such.
A doctor can prescribe use of the device for depression without FDA approval for treating depression.
What FDA classification would you expect for a pair of crutches?
Class IV
Class II
Class III
Class I
Class I
What FDA classification would you expect for an X-ray machine?
Class I
Class III
Class II
Class IV
Class II
What FDA classification would you expect for an implanted pacemaker?
Class III
Class IV
Class II
Class I
Class III
A clinical trial to test the effectiveness of a new medical device would be an example of which of the following Design Controls:
Design Input
Design Output
Design Verification
Design Validation
Design Validation
Late in the project, your team realizes that your prototype would be much more useful if you automate a lifting and positioning process that you previously planned to have the user perform manually. Everyone on the team agrees to implement this change. This is an example of what?
An engineering change order
A value-added feature modification
Design feature modification
Scope creep
Scope creep
Which of the following is not part of the Triple Constraint?
Scope
Cost
Time
Risk
Risk
Which of the following is not a phase in the Project Management Process?
Define
Monitor
Scope
Plan
Scope
A Work Breakdown Structure is:
A way to determine which project components to manufacture and which ones to purchase
A cost and schedule tracking tool used in project management
A systematic way to identify all the tasks that must be completed in a project
A bottom-up approach used to assign tasks
A systematic way to identify all the tasks that must be completed in a project
In a Work Breakdown Structure, a work package:
Is a logical grouping of work that does not make sense to further subdivide
Has a defined goal or outcome
Requires similar expertise, competency, and resources
All of the above
All of the above
Why is it important to have a single owner for each work package?
It provides a single point of responsibility for the task
It helps to reduce costs
It ensures that only one person works on each task
It ensures that the WBS follows the 100% rule
It provides a single point of responsibility for the task
To create a schedule, you should estimate the time needed to complete the work shown at which level of the WBS?
Top level
Second level
Lowest level
All levels
Lowest level
All of the following are all needed to create a complete project schedule except:
Critical Path
Dependencies between tasks
Time estimates for each task
Work Breakdown Structure
Critical Path
All of the following are acceptable ways to pull your schedule in except:
Accept that you will not finish on time
Schedule tasks in parallel
Verify/refine time estimates & dependencies
Do some tasks in less time; add resources
Accept that you will not finish on time
The critical path describes:
Parts that must be ordered so that the project is finished on time
The best way to do the work on the project
The tasks that set the time needed to complete the project
Difficult tasks in the project
The tasks that set the time needed to complete the project
Which of the following items would be considered a milestone?
Collecting data to present in the PDR
Creating the PDR slides
Writing the software to collect the data to present in the PDR
Holding the PDR
Holding the PDR
Two people having disagreements because of a personality clash is which type of conflict?
Relational
Process
Goal
Content
Relational
Paramveer walks into a meeting late; Rania rolls her eyes and sarcastically says to him, “It’s about time!” Rania’s actions are a form of which of the following:
Separating people from the problem
Attacking character
Stonewalling
Contempt
Contempt
The best way to avoid stonewalling is:
Take responsibility for your role in the conflict
Describe feelings and needs
Take a break to regroup and reapproach conflict a little later
Focus on a person’s behavior rather than their character
Take a break to regroup and reapproach conflict a little later
True or False: Conflict is not inherently negative.
True
False
True
True or False: When you have an issue with someone, it is best to use “You” language rather than “I” language when discussing conflict.
True
False
False
At your first job you are asked to create a project budget. Which of the following should you include?
Labor costs
Both material and labor costs
Just the BOM costs
Material costs
Both material and labor costs
You are building a high-powered potato cannon. In the conceptual design phase, you used PVC pipes to test out your various designs, but your final design will utilize copper pipes for extra strength. The design also requiers a pressure release valve to control the pressure in the system. Which item or items below should be included in the Bill of Materials (BOM)? Select all that apply.
Pressure release valve
PVC pipe
Copper pipe
Potatoes for testing the system
Pressure release valve
Copper pipe
When it comes to project risk management, all of the following items should be considered except:
Long lead times
Team issues
Lack of required skills
Adding a guard to prevent burns
Adding a guard to prevent burns
Which of the following is/are a good risk management strategy?
Group of answer choices
Make models or rapid prototypes
Purchase spare or alternate components
All of these
Change the design
all of these
Which of the following items should be monitored as part of good project management? Select all that apply.
Budget
Only critical path tasks
Task completion time
Only milestones
Budget
Task completion time
You notice that several tasks, which are not on the critical path, are not being completed as planned. Below are four strategies that you can apply. Which of the following should you not do?
Group of answer choices
Work with your team to create intermediate milestones
Update your schedule (Gantt chart)
Ask your teammates to work longer hours
Nothing, the tasks are not on the critical path so you don't need to worry about them
Nothing, the tasks are not on the critical path so you don't need to worry about them