1/26
Looks like no tags are added yet.
Muda
Waste
Muri
Strain (on process or workers)
Mura
Inconsistency (variation in process)
Adon
Stop the line signal
Kaizen
Continuous improvement project
Gemba
Walk the process
Nagara
Smooth production flow
Shojinka
Load balancing
Takt
Time between finished product units exiting process needed to support demand rate
Jidoka
Quality at source
Kanban
Work in process inventory container/card
Heijunka
Production leveling display board
Poka-yoke
Error-proofing
Hoshin-Kanri
Policy deployment (strategic planning)
Obeya
War room (process improvement milestones debriefing sessions)
Yokoten
Sharing of best practices
A3
9-box template for completing a lean project
Cycle time
Processing time per unit at a process step
Push flow
Material flow where upstream process step pushes completed work to downstream process step
TPS
Toyota Production System
SMED
Single minute exchange of dies
Cellular layout/group technology
Machines organized to completely process a part (instead of part going through multiple departments)
JIT
Just in time production, delivery, supply
Pull flow
Material flow where upstream process step transfers completed work to downstream process step only as needed
TPM
Total productive maintenece
EPEx
Every part every x (hours or days)
Milk run
3PL firm picking up LTL loads from sources and delivering to destinations along a typically circular route