Exam 2 Bus. Spread. Modeling

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/39

encourage image

There's no tags or description

Looks like no tags are added yet.

40 Terms

1
New cards

Decision alternatives

the choices available

2
New cards

Uncertain events (states of nature)

things that may occur after the decision, along with their outcomes

3
New cards

Payoffs

the value of each combination of decision and outcome, usually summarized in a payoff table (rows = alternatives, columns = outcomes)

4
New cards

Maximax

Optimistic- Find the best payoff in each row, then choose the row with the largest of those

5
New cards

Maximin

Pessimistic/conservative- Find the worst payoff in each row, then choose the row with the largest of those

6
New cards

Minimax

Used for cost tables- Find the worst (largest) cost in each row, then choose the row with the smallest of those. It is the cost version of maximin.

7
New cards

Minimax regret

Avoid regret- Build a regret (opportunity loss) table, find the maximum regret in each row, then choose the row with the smallest of those

8
New cards

Average payoff

Treat all outcomes as equally likely- Average each row, then choose the highest

9
New cards

Regret (opportunity loss)

best payoff in that outcome’s column − the payoff you actually got

10
New cards

Expected value strategy

weight each payoff by its probability, sum across the row, and choose the alternative with the highest expected value

11
New cards

Expected opportunity loss

weight the regrets by probability and sum. Choose the alternative with the lowest value. It always points to the same decision as the expected value strategy

12
New cards

Expected opportunity loss

weight the regrets by probability and sum. Choose the alternative with the lowest value. It always points to the same decision as the expected value strategy

13
New cards

EVPI (Expected Value of Perfect Information)

the most you’d pay for a perfect prediction of the outcome.

= (expected payoff with perfect information) − (best expected value without it)

also equals the minimum expected opportunity loss.

14
New cards

EVSI (Expected Value of Sample Information)

the value of imperfect information, such as a market survey or test.

= (expected value with the sample information) − (expected value without it)

EVSI ≤ EVPI always. If the information costs more than its EVSI, don’t buy it.

15
New cards

Decision trees

A graphical model of sequential decisions and uncertain events.

16
New cards

Decision node (square)

a point where you choose

17
New cards

Event node (circle)

a point where chance determines the outcome

18
New cards

Branches

the lines leaving a node, each representing an alternative or outcome

19
New cards

Decision strategy

a plan specifying which decision to make at every decision node, depending on how events unfold

20
New cards

Solving the tree

work backward (right to left). At event nodes, calculate expected values. At decision nodes, pick the best branch

21
New cards

Certainty equivalent

the guaranteed amount a decision maker considers equally attractive to a risky gamble

22
New cards

Risk-averse

certainty equivalent < expected value

23
New cards

Risk-neutral

certainty equivalent = expected value

24
New cards

Risk-seeking

certainty equivalent > expected value

25
New cards

Historical analogy

forecast something new by comparing it to a similar past situation (e.g., predicting sales of a new product from the launch of a similar one)

26
New cards

Delphi method

a panel of experts gives forecasts anonymously. Results are summarized and shared back, and the experts revise. This repeats until the group reaches consensus. Anonymity prevents one dominant person from swaying everyone.

27
New cards

Indicator

a measure believed to influence or predict the variable you want to forecast (e.g., housing permits as an indicator of future construction demand).

28
New cards

Index

a quantitatively developed indicator, often a composite of several measures (e.g., Dow Jones Industrial Average, S&P 500, inflation/consumer price index).

29
New cards

Statistical forecasting models

use historical time series data

30
New cards

Time series

Historical data recorded in order over time (hourly, daily, weekly, monthly, yearly)

31
New cards

Stationary time series

Fluctuates around a constant mean with no trend or seasonality. The variation is just random.

32
New cards

Trend

Gradual, long-term upward or downward movement

33
New cards

Seasonal effect

Pattern that repeats at fixed intervals (e.g., holiday retail spikes every December)

34
New cards

Cyclical effect

Rises and falls over longer periods, usually several years, with no fixed length (e.g., business cycles, recessions)

35
New cards

Seasonal vs. cyclical

seasonal is regular and predictable in length. Cyclical is longer and irregular in length

36
New cards

Simple moving average

Averages the most recent k actual values to forecast the next period, which smooths out random fluctuations.

37
New cards

Simple moving average formula

F(t+1) = (A_t + A_(t-1) + … + A_(t-k+1)) / k

Larger k gives a smoother forecast that reacts more slowly.

Smaller k reacts faster but is noisier.

38
New cards

Simple exponential smoothing

A short-range forecasting technique for stationary data. It uses a smoothing constant (α), with 0 ≤ α ≤ 1.

39
New cards

Simple exponential smoothing formula

F(t+1) = F_t + α(A_t − F_t)

40
New cards