EU Development Policy and Norway Grants Audit Vocabulary

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/41

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering core terms, institutional bodies, audit procedures, and governance concepts in EU development policy and the EEA and Norway Grants.

42 Terms

1
New cards

EEA and Norway Grants 2021–2028

Financial contributions provided by Iceland, Liechtenstein, and Norway to 15 eligible EU Member States, totaling €3.268 billion€3.268\text{ billion} (€1.805 billion€1.805\text{ billion} for EEA Grants and €1.463 billion€1.463\text{ billion} for Norway Grants) to reduce disparities and promote green transition, democracy, and social resilience.

2
New cards

National Focal Point (NFP)

The national public body in a beneficiary country with overall responsibility for coordinating the implementation of the Memorandum of Understanding under the Grants framework.

3
New cards

Programme Operator (PO)

A public or private body or public authority responsible for preparing, managing, and implementing a specific funding programme, including launching calls and selecting projects.

4
New cards

Financial Mechanism Committee (FMC)

The decision-making committee representing the Donor States that manages the EEA Financial Mechanism, adopts guidelines, and oversees fund allocations.

5
New cards

Donor Programme Partner (DPP)

A public entity from a donor country that advises on and participates in programme preparation or implementation, facilitating bilateral cooperation.

6
New cards

Office of the Auditor General of Norway (Rigsrevisjonen)

The supreme audit institution of the Kingdom of Norway responsible for auditing and external oversight of Norway Grants expenditures.

7
New cards

Audit Authority (AA / EUTAF)

The national public audit body (in Hungary, the Directorate General for Audit of European Grants) responsible for verifying the effective functioning of the management and control systems.

8
New cards

Management and Control Systems (MCS)

The internal organizational procedures, risk mitigation mechanisms, and administrative structures designed to provide reasonable assurance regarding eligible expenditure and legal compliance.

9
New cards

Eligible Expenditure

Costs that satisfy all regulatory, contractual, and programme eligibility criteria and can be reimbursed or accounted for under public funding rules.

10
New cards

Systemic Irregularity

A recurrent deficiency resulting from inherent shortcomings in the management and control systems rather than an isolated mistake.

11
New cards

Isolated Clerical Error

A single, non-systemic administrative or data-recording mistake that does not indicate a widespread procedural flaw in the control system.

12
New cards

Flat-Rate Financial Correction

A fixed percentage reduction applied to declared expenditure or allocated funds when it is impossible to calculate the exact financial damage of a non-compliance issue.

13
New cards

Proportional Financial Correction

A financial reduction calculated in proportion to the specific gravity and financial impact of an identified breach of compliance.

14
New cards

Error Rate Threshold (2%)

The materiality benchmark set at 2%2\% above which errors in declared expenditure are considered substantial, potentially triggering financial corrections or a qualified audit opinion.

15
New cards

Unqualified Audit Opinion

A clean audit opinion issued when the auditor confirms that management and control systems operate properly and accounts give a true, fair view without material errors.

16
New cards

Qualified Audit Opinion

An audit opinion issued with reservations when specific, non-pervasive irregularities or control weaknesses are identified.

17
New cards

Adverse Audit Opinion

An unfavorable audit finding issued when pervasive, systemic deficiencies undermine the reliability of the management and control systems.

18
New cards

Desk Review

A documentary verification of submitted reports, expenditure declarations, and supporting files conducted off-site without visiting the physical premises.

19
New cards

On-the-Spot Verification (On-Site Audit)

A physical, in-person inspection of project premises to confirm the actual delivery of activities, works, and assets declared by the beneficiary.

20
New cards

Substantive Testing

An in-depth audit examination of individual financial transactions, payment claims, and invoices to verify their accuracy, validity, and completeness.

21
New cards

Walkthrough Test

An audit technique that traces a single transaction step-by-step through the management and control systems to evaluate operational design and procedures.

22
New cards

Audit Trail

A clear, complete chronological sequence of records documenting every step of a transaction from initial allocation to final payment and accounting.

23
New cards

Recovery Order (Clawback)

A formal administrative demand instructing a beneficiary to repay ineligible, irregular, or overpaid funding.

24
New cards

Statement of Assurance (SoA)

An annual formal declaration by a responsible executive confirming that internal control systems function reliably and transactions comply with the rules.

25
New cards

Contradictory Procedure

The formal dialogue stage during an audit that gives the audited institution the opportunity to submit explanations or counterarguments on draft findings.

26
New cards

Plausibility Check

A preliminary assessment verifying submitted project cost estimates and budgets against prevailing market benchmarks before approval.

27
New cards

Disallowance of Costs

The formal exclusion and non-recognition of declared expenditure by auditors or authorities due to non-compliance with eligibility rules.

28
New cards

Decommitment of Funds (N+2 / N+3 Rule)

The automatic financial cancellation of committed funding allocations that have not been absorbed and spent by the designated deadline.

29
New cards

Grant

A specific, non-repayable financial contribution awarded to an eligible beneficiary to carry out a defined public-interest project or objective.

30
New cards

Financial Instruments

Repayable public support mechanisms—such as loans, guarantees, and equity investments—distinguished from direct, non-repayable grants.

31
New cards

State Aid

A selective public advantage granted by a state to specific commercial undertakings that risks distorting market competition, governed by strict EU regulations.

32
New cards

Technical Assistance

Funding dedicated to financing the preparation, procurement, administration, monitoring, and audit activities of development programmes.

33
New cards

National Co-Financing

Domestic public financial contributions provided alongside EU or international resources to fully cover the budget of a funded intervention.

34
New cards

Shared Management

A governance model where the European Commission delegates day-to-day implementation and operational management of funds to designated Member State authorities.

35
New cards

Recovery and Resilience Facility (RRF)

A performance-based financing instrument under NextGenerationEU providing funds conditioned on the completion of agreed reform milestones and investment targets.

36
New cards

Milestones (in RRF)

Qualitative achievements under national recovery plans, such as adopting legislation, establishing bodies, or publishing strategies.

37
New cards

Targets (in RRF)

Quantitative and measurable indicators defining specific physical or numeric results to be achieved under a national recovery plan.

38
New cards

Project Outputs

The direct physical deliverables, services, or activities produced by a project (such as conducting a specified number of training seminars).

39
New cards

Project Outcomes

The tangible, immediate benefits and behavioral or institutional changes resulting from project outputs (such as increased professional qualifications).

40
New cards

Project Impact

The broader, long-term socio-economic effects generated over time by project outcomes (such as structural modernization and economic growth).

41
New cards

Décalage (in Consecutive Interpreting)

A deliberate pause of 1 to 2 seconds1\text{ to }2\text{ seconds} after the speaker finishes, enabling the interpreter to review notes and select concise lexical chunks before speaking.

42
New cards

Diagonal Note-Taking

A structured consecutive interpreting layout recording ideas diagonally across the page from Subject (top-left) to Verb (middle) to Object (bottom-right).