EXAM 3 SCMT

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/84

encourage image

There's no tags or description

Looks like no tags are added yet.

85 Terms

1
New cards

BATNA

Best Alternative to a Negotiated Agreement — your best backup if a deal fails.

2
New cards

Why is transportation important?

Connects partners; enables low-cost sourcing and timely delivery.

3
New cards

Transportation challenges

Offshoring, changing demand, capacity limits, freight rates, regulations.

4
New cards

Truck transportation

Flexible, accessible, fast; limited capacity; mostly variable costs.

5
New cards

Rail transportation

Cheap for heavy, long-distance loads; less accessible. Linehaul and shortline carriers.

6
New cards

Air transportation

Fastest, expensive; best for urgent, valuable, lightweight goods.

7
New cards

Water transportation

Cheap, high capacity, slow; bulk and overseas freight.

8
New cards

Pipeline transportation

Low cost, high fixed costs; slow, limited routes; liquids and energy.

9
New cards

Bill of lading (BOL)

Shipment document. Nonnegotiable BOL: delivery to named consignee. (Standard clarification.)

10
New cards

In-transit visibility

Track freight location and status using satellite or wireless technology.

11
New cards

TMS

Transportation management system: plans routes, selects carriers, tracks and audits freight.

12
New cards

Private fleet vs. for-hire carrier

Private = more control, own assets; for-hire = flexible costs.

13
New cards

Supply chain alignment

Match people, processes, technology, demand and business goals.

14
New cards

Three supply chain relationship types

Transactional = simple exchange; collaborative = shared goals; strategic alliance = customized partnership.

15
New cards

What determines relationship intensity?

Duration, obligations, cooperation, planning and shared benefits/risks.

16
New cards

Six steps of relationship development

Assess → decide → evaluate options → select partner → structure → implement/improve.

17
New cards

Partnership operating model

Scope, responsibilities, leadership, trust, information and finances.

18
New cards

Collaboration

Share information and resources for mutual benefit.

19
New cards

Seven laws of collaborative logistics

Mutual benefit; evolving partnerships; co-buyers/sellers; flexibility/security; process integration; open integration; essential flows.

20
New cards

Vertical vs. horizontal vs. full collaboration

Vertical = different supply chain levels; horizontal = peers; full = both.

21
New cards

1PL vs. 2PL vs. 3PL vs. 4PL vs. 5PL

1PL = shipper; 2PL = carrier; 3PL = outsourced logistics; 4PL = strategic coordination; 5PL = aggregates demand and negotiates rates.

22
New cards

3PL services

Transport, warehousing, distribution, forwarding, finance and information services.

23
New cards

3PL benefits and risks

Lower costs, better service, flexibility; risks include cost creep, poor service and weak technology.

24
New cards

Successful 3PL relationships

Trust, shared data, clear agreements, fair prices and reliable execution.

25
New cards

Supply chain ecosystem

Connected organizations working together to create customer value.

26
New cards

3PL trends

Consolidation, e-commerce, global growth, digital visibility and shared networks.

27
New cards

Twin goal of inventory management

Low inventory + acceptable customer service.

28
New cards

Cycle stock

Inventory held because goods are ordered or produced in batches.

29
New cards

Safety stock

Extra inventory to protect against demand or lead-time uncertainty.

30
New cards

In-transit inventory vs. WIP

In-transit = moving goods; WIP = unfinished goods.

31
New cards

Seasonal vs. anticipatory stock

Seasonal = predictable recurring demand/supply; anticipatory = unusual future event.

32
New cards

Inventory goals by department

Marketing = availability; manufacturing = long runs; finance = low inventory.

33
New cards

Four inventory carrying costs

Capital, storage, service (insurance/taxes), risk (damage/theft/obsolescence).

34
New cards

Inventory carrying cost rate

Annual carrying costs ÷ inventory value. Example: $20k ÷ $100k = 20%.

35
New cards

Ordering vs. setup costs

Ordering = processing purchase orders; setup = preparing production runs.

36
New cards

Larger orders: cost trade-off

Holding costs rise; ordering costs fall. Minimize their sum.

37
New cards

Three stockout outcomes

Backorder, lost sale, or lost customer.

38
New cards

Why is near-100% service expensive?

Each extra improvement requires disproportionately more safety stock.

39
New cards

In-transit carrying costs

Capital still tied up; storage and most taxes don't apply; insurance varies.

40
New cards

Independent vs. dependent demand

Independent = standalone item; dependent = driven by another item's demand.

41
New cards

Push vs. pull inventory

Push = forecast-driven; pull = actual demand-driven.

42
New cards

System-wide vs. single-facility inventory

System-wide coordinates nodes (MRP/DRP); single-facility manages one location pair (EOQ/JIT).

43
New cards

Fixed quantity vs. fixed interval

Quantity = same amount, variable timing; interval = same timing, variable amount.

44
New cards

Simple EOQ assumptions

Constant demand, lead time and price; no stockouts or transit stock; independent item; unlimited capital, infinite horizon.

45
New cards

Replenishment lead time components

Order transmission, processing, preparation and delivery.

46
New cards

Min-max system

When stock falls below the reorder point, replenish toward the maximum.

47
New cards

JIT (just-in-time)

Near-zero stock, short reliable lead times, small frequent deliveries, zero defects.

48
New cards

VMI (vendor-managed inventory)

Supplier manages replenishment using shared customer inventory/sales data.

49
New cards

ABC analysis / Pareto rule

A = most valuable; B = middle; C = least. Few items account for most value (80/20).

50
New cards

Inventory risk/value quadrant

Distinctives = high risk/low value; criticals = high/high; generics = low/low; commodities = low/high.

51
New cards

Distribution's main roles

Balance supply/demand, buffer uncertainty, enable bulk savings, support production and omnichannel fulfillment.

52
New cards

Accumulation vs. sortation vs. allocation vs. assortment

Gather goods; group similar goods; assign stock to orders; combine different SKUs.

53
New cards

Cross-docking

Receive and reship goods with little or no storage.

54
New cards

Postponement

Delay final customization until an order arrives.

55
New cards

Value-added distribution services

Kitting, light assembly, sequencing, quality checks, repairs, returns and recycling.

56
New cards

Risk pooling and centralized inventory

Combine demand to reduce safety stock; fewer facilities, but potentially longer deliveries.

57
New cards

Decentralized inventory

More locations near customers; faster service but more inventory and facility costs.

58
New cards

More warehouses: cost trade-off

Facility/inventory costs rise; lost-sale costs fall; transport may initially fall.

59
New cards

Three warehouse resource trade-offs

Space vs. equipment; equipment vs. labor; labor vs. space.

60
New cards

Private vs. public vs. contract warehouses

Private = own/lease; public = short-term rented storage; contract = customized outsourced service.

61
New cards

When is a private DC best?

High, stable volume and greater control needs; variable volume favors outsourcing.

62
New cards

Three distribution planning decisions

Capability requirements → network design → facility design.

63
New cards

Warehouse layout principles

Use vertical space, minimize aisles and travel, enable direct flows and automation.

64
New cards

Slotting

Position products to minimize movement; often put fast movers near shipping.

65
New cards

Five distribution center processes

Receive → put away → store/replenish → pick → ship.

66
New cards

How to improve warehouse picking?

Reduce walking, use batch/zone picking, validate picks and keep slots stocked.

67
New cards

Distribution challenges and responses

Labor shortage → automation; seasonal peaks → 3PL capacity; small fast orders → flexible fulfillment.

68
New cards

Perfect Order Index (POI)

Complete × damage-free × billing accuracy × on-time dispatch. Multiply decimals, not averages.

69
New cards

WMS

Warehouse management system: tracks stock and directs put-away, picking and replenishment.

70
New cards

Barcode vs. RFID

Both identify items; RFID can read many tags quickly without direct line of sight.

71
New cards

Measure vs. metric vs. index

Measure = raw number; metric = calculation; index = combined metrics.

72
New cards

Good performance measures

Clear, measurable, relevant, balanced, trusted and inexpensive to track.

73
New cards

Proactive vs. reactive metrics

Proactive = warn before problems; reactive = report past results.

74
New cards

Building a metrics program

Use teams, align with strategy, assign owners, resolve conflicts, get leadership support.

75
New cards

Four process-measure categories

Time, quality, cost, other/supporting information.

76
New cards

Five SCOR performance attributes

Reliability = perfect order; responsiveness = speed; agility = adaptability; cost = cost to serve; assets = cash-to-cash/returns.

77
New cards

Logistics customer service outputs

Availability, order cycle time, responsiveness, information and after-sale support.

78
New cards

Why does order cycle time matter?

Affects availability, customer inventory and seller cash flow.

79
New cards

Three ways to increase customer value

Better service at same price; same service at lower price; improve both.

80
New cards

Income statement vs. balance sheet

Income statement = profit over time; balance sheet = assets, liabilities, equity at one date.

81
New cards

Gross margin, EBIT and net income

Gross margin = sales − COGS; EBIT = gross margin − operating expenses; net income = EBIT − interest − taxes.

82
New cards

Why does lower inventory improve ROA?

Less carrying expense raises profit; fewer assets reduce the denominator.

83
New cards

How do service failures reduce profit?

Corrections cost money; refused orders lose revenue; invoice deductions reduce sales.

84
New cards

CLGN service-failure example: best option?

Improve fill rate through warehouse training; higher net income than improving delivery timeliness.

85
New cards

Why shorten order-to-cash time?

Get paid sooner and free capital tied up in receivables.