What is scheduling
the process of listing a number of tasks or events in the sequence they will occur. A schedule is a timetable.
Why plan?
cannot schedule without planning first
project can be built on paper first
is a powerful resource management tool
Task/activities
Production
Procurement
Administrative
how is project planning accomplished?
review historical data for similar project
review contract for milestones
production
related to the actual on-site construction of the project
procurement
related to the purchasing and tracking of materials from the supplier to the jobsite
administrative
related to permits, inspections, final approvals, or other government requirement
construction phase
schedules are essential to the succesful coordination of a projects day-to-day operations
preconstruction phase
schedule used to coordinate and control when the owner begins to occupy the facility
schedule types
bar chart
matrix
network
bar charts represent
planned overall length of project
planned duration of each project component
calendar start and finish dates for each project
pros of bar charts
simple and quick to produce
easy to read and understand
good for executive reviews and public meetings
cons of bar charts
does not communicate the interrelationships among project activities
milestones show in?
black diamonds
activity duration defined
amount of time assigned to complete a task
matrix schedule
typically used for repetitive work
network schedule
workhorse of the construction schedule-AKA critical path method (CPM) schedule
pros of network schedule
communicates the interrelationships among the project activities
forces a detailed discussion at the projects outset
cons of network schedule
consumes a lot of resources
requires technical training and experience to develop and maintain
CPM schedule
a completed network schedule means that all work performed on the project has been defined and organized
activities with zero float are defined as
critical activities
float or slack is also calculated by?
the software
activity logic defined
determines the sequence that activities can or will be carried out during construction
schedule logic should consider
safety of personnel
resources of the project
relationships between activities
types of logic
sequential and concurrent
what is project control (PC)?
an effective system allowing the project team to monitor
process of documenting the projects ongoing cost, time, and quality
Why PC?
provides team members with a measure of success of past actions/decisions
provides an opportunity to make course corrections early if needed
Pareto’s law (80/20) rule
80% of the outcome of any project is determined by 20% of it’s included elements
crashing
process of accelerating an activity or multiple activities in the schedule to shorten the overall duration of the project
standard/target VS actuals
PC must have a timely and effective way to measure and report actual progress
key to any reporting process is?
any inconsistency is identified quickly, good reports show variance (deltas or differences)
basic control theory
best be illustrated as a repeating control loop
bottom line
the construction professional must determine the proper level of control that prvides feedback
minimum cost scheduling
establishes the most effective project duration
bottom line in planning
determining the optimum duration for a project is an important step in proper planning
managing project finances
contractors receive income from the owner in the form of invoices
managing cash flow can be difficult bc payments are made in different increments
measuring progress
units completed- floor tiles ex( 1,500 SF or 2,000 SF installed = 75% complete)
trending
looking back at how the project has failed or succeeded, trends are helpful when developing a forecast
forecasting
provides info on the ultimate cost and completion date of project
reporting
process of gathering, recording, and analyzing
documentation
companies establish a formal system of documenting project events
notice to proceed
1st formal communication under a construction contract
contains two basic provisions (notice to proceed)
accepts the bid submitted by the contractor
establishes a start date and completion date
meeting minutes
minutes should be action oriented and kept for all meetings, especially ones involving job progress
meeting minutes should include-
project name
project #
date of the meeting
submittals
certain info is required to be submitted to the design professionals for review and approval
example of submittals
shop drawings
product samples
product literature/data
shop drawings
translate the intent of the design documents into a buildable system, they are detailed and precise so review can be time consuming
tracking shop drawings
person assigned is responsible for making sure they are received from respective trade partner on time
Who was the guest speaker
Sarah Earl from Chevron Phillips Chemical Company
productivity =
earned hrs/burned hrs
daily reports
a record of the day-to-day activities and conditions on the job site
change orders
a change on the project-money, scope, or time
Process of change order
submit a change order
reviewing the form for scope and pricing
if approved, the change becomes apart of the original contract
what can be a major source of disputes
change orders
reasons for a change order
owner-directed change of scope
owner-directed change of material
unforseen site conditions
construction change directive (CCD)
a CDD may be issued by the owner that authorizes a change in the project scope, schedule, or other contract terms
serves as temporary instructions
Application for payment
each owner has specific progress payment requirements
the GC should carefully review the request
request for payments must be signed by the contractor and notarized
what is a schedule of values
written list (usually in tabular form) of the value and amounts of the work
why schedule of values?
provides order/structure
helps expedite payments
consequences of accidents
injury or death
decreased productivity
lower morale
direct cost
medical transportation
healthcare providers
hospital
medications
medical equipment
indirect cost
lost productivity
lower morale
insurance rates
training replacements
lost contracts
experience modification rate (EMR)
used to price workers comp insurance premiums
the average EMR is less than a 1.0 is considered safer than most
OSHA reporting requirements
a death must be reported within 8 hrs
and in patient hospitalization, amputation, or eye loss, 24 hrs
OSHA inspection process
opening conference
walkthrough
closing conference