Essentials of Production & Operations Management

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/80

flashcard set

Earn XP

Description and Tags

Comprehensive vocabulary flashcards covering key terms, concepts, mathematical formulas, and frameworks from Essentials of Production & Operations Management across all five course modules.

81 Terms

1
New cards

Productivity

The ratio of aggregate output (goods and services) to aggregate input (labor, material, capital, energy, and management), represented by the formula Productivity=OutputInput\text{Productivity} = \frac{\text{Output}}{\text{Input}}.

2
New cards
3
New cards

Ineffective Time

The period wherein the worker, machine, or both are idle due to shortcomings of the management or the worker.

4
New cards

Operations Management (Traditional View)

The transformation approach which views operations management as the systematic direction and control of all processes that convert inputs (resources, materials, people, information) into finished outputs (goods or services).

5
New cards

Value-Driven Approach

A modern perspective that views a business as a set of structured processes, measuring each on its effectiveness in achieving desired outcomes with minimal wastage across four core processes.

6
New cards

Division of Labour

The production concept introduced by Adam Smith in 1776 in which work is broken down into a series of small, elemental subtasks performed by different specialized workers to increase efficiency and volume.

7
New cards

Interchangeable Parts

Standardized components introduced by Eli Whitney in 1790 that can substitute for one another so that every item in a batch fits equally, enabling the transition from custom craft production to mass manufacturing.

8
New cards

Scientific Management (Taylorism)

An approach pioneered by Frederick Winslow Taylor focused on improving worker productivity and economic efficiency through measurement, observation, stopwatch time studies, piece-rate incentives, and the strict separation of planning from doing.

9
New cards

Hawthorne Effect

The finding from Elton Mayo's 1930s Hawthorne studies showing that workers' productivity increases primarily in response to the special attention and recognition given to them by management rather than physical environmental changes.

10
New cards

Job Enlargement

An organizational design approach that gives workers a larger portion of the total task to do in order to reduce monotony and repetitive boredom.

11
New cards

Job Enrichment

An approach that motivates employees by giving them a greater role in planning, decision-making, and controlling their own work.

12
New cards

Business Process Reengineering (BPR)

The radical analysis, redesign, and restructuring of workflows and business processes to eliminate non-value-adding steps, automate workflows, increase efficiency, improve quality, and reduce costs.

13
New cards

Order-Winners

The specific competitive criteria and qualities of a product or service that cause an organization to win customer orders over its rivals in the marketplace.

14
New cards

Order-Qualifiers

The required minimum operational and product criteria a company must demonstrate to even be considered a viable competitor in a given market.

15
New cards

Fixed Factors of Production

Factors of production whose costs do not change as production output levels fluctuate.

16
New cards

Variable Factors of Production

Factors of production whose costs change directly in proportion to alterations in the volume of output produced.

17
New cards

Service Economy

An economic structure where economic activity is predominantly characterized by the provision of intangible services rather than the manufacture of physical goods.

18
New cards

Forecasting

The process of estimating future events and values by systematically combining and casting forward past and present data.

19
New cards

Prediction

The process of estimating future events based on subjective considerations other than purely historical numerical data, which do not need to be combined in a pre-planned way.

20
New cards

Mean Absolute Deviation (MAD)

A forecast error metric computed as the average of the absolute deviations between actual observed values and forecasted values.

21
New cards

Mean Squared Error (MSE)

A forecast accuracy metric computed as the average of the squared errors, which penalizes large forecasting errors more heavily than small ones.

22
New cards

Naive Forecasting

A baseline forecasting approach that assumes the forecast for the upcoming period will equal the actual observed value of the most recent period (Ft+1=XtF_{t+1} = X_t).

23
New cards

Delphi Method

A qualitative forecasting method based on multiple rounds of questionnaires sent to an anonymous panel of experts, where responses are summarized and shared by a facilitator between rounds until consensus is reached.

24
New cards

Historical Analogy

A qualitative demand forecasting method for a new product based on comparing it to the historical life-cycle patterns and sales records of similar or substitute existing products.

25
New cards

Linear Regression

A quantitative statistical method that fits a straight line of the form Y=B0+B1XY = B_0 + B_1X through data points using the least squares approach to predict a dependent variable from an independent variable.

26
New cards

Simple Moving Average (SMA)

A quantitative forecasting indicator computed by calculating the arithmetic mean of data points over a specified number of recent periods (nn).

27
New cards

Weighted Moving Average (WMA)

A quantitative time-series forecasting method that assigns differing numerical weights to individual past periods, giving greater weight to more recent data points.

28
New cards

Simple Exponential Smoothing (SES)

A time-series forecasting technique using a single parameter α\alpha (0≤α≤10 \le \alpha \le 1) to calculate a weighted average of past observations, where weights decay exponentially as observations grow older.

29
New cards

Holt’s Linear Trend Model

A double exponential smoothing (DES) technique that incorporates both a level smoothing parameter (α\alpha) and a trend smoothing parameter (β\beta) to support univariate time series with linear trends.

30
New cards

Holt-Winters Exponential Smoothing

A triple exponential smoothing (TES) technique incorporating three parameters—α\alpha (level), β\beta (trend), and γ\gamma (seasonality)—to adjust for time series with evolving levels, trends, and seasonal cycles.

31
New cards

The Assessment Profiling System (TAPS)

A multi-level self-reporting visualization tool using a multiple attribute logic engine to provide real-time situational awareness and operational strategy evaluation.

32
New cards

Factor Rating Method

A facility location evaluation method that identifies critical quantitative and qualitative factors, assigns weights based on relative importance, rates potential sites, and selects the location with the highest weighted score.

33
New cards

Center of Gravity Method

A mathematical technique that calculates geographic grid coordinates (Cx,CyC_x, C_y) to locate a single central distribution center by minimizing volume-weighted transportation costs and distances to existing locations.

34
New cards

Load-Distance Method

A mathematical model for evaluating alternative facility locations by multiplying the volume of loads moving to and from facilities by their respective Euclidean or rectilinear distances to minimize total transport effort.

35
New cards

Break-Even Point (BEP)

The output level or sales volume at which total revenues exactly equal total costs, calculated as Break-Even Point=Fixed CostsPrice per Unit−Variable Cost per Unit\text{Break-Even Point} = \frac{\text{Fixed Costs}}{\text{Price per Unit} - \text{Variable Cost per Unit}}.

36
New cards

Geographic Information System (GIS)

A computerized system designed to capture, store, query, analyze, and display geographically referenced spatial and attribute data for complex location analysis and planning decisions.

37
New cards

Process Layout (Functional Layout)

A facility layout that groups similar machines, operations, or functions together in dedicated departments, typically used in batch production or job shops with low-volume, high-variety custom products.

38
New cards

Product Layout (Line Layout)

A facility layout where machines, equipment, and workstations are arranged in a continuous line according to the exact progressive processing sequence required by a standardized, high-volume product.

39
New cards

Fixed Position Layout

A facility layout where the product remains stationary at one location due to its extreme bulk or fragility (e.g., ships, airplanes, buildings), and transforming resources such as workers, equipment, and materials move to it.

40
New cards

Cellular Layout

A hybrid layout using Group Technology principles that clusters dissimilar machines into U-shaped work cells dedicated to processing families of parts with similar geometric and processing characteristics.

41
New cards

Line Balancing

A flow-oriented technique that balances operator and machine processing times across all workstations on an assembly line so that work assignments match the designated takt time and idle time is minimized.

42
New cards

Takt Time

The rate at which parts or finished products must be produced to match the exact pace of customer demand, calculated as Takt Time=Available Working Time per DayCustomer Demand per Day\text{Takt Time} = \frac{\text{Available Working Time per Day}}{\text{Customer Demand per Day}}.

43
New cards

Cycle Time

The average or maximum time required at a workstation to complete one cycle of an operation, representing the pace at which a completed unit leaves the production line.

44
New cards

Routing

The production planning and control function that determines the specific course, operations sequence, equipment, and work centers that raw materials and parts follow through a factory.

45
New cards

Scheduling

The production planning and control function that plans the time dimension of manufacturing by determining when each specific operation will begin and end.

46
New cards

Dispatching

The production control activity that releases official work orders, route sheets, and materials to authorize and initiate physical production on the shop floor.

47
New cards

Expediting

The follow-up phase of production control that tracks work progress, documents status, identifies deviations from scheduled completion dates, and takes corrective action.

48
New cards

Design Capacity

The theoretical maximum rate of output an operation can produce under ideal conditions on a continuous basis without halting for shift changes or maintenance.

49
New cards

Effective Capacity

The maximum realistic output that a facility can sustain economically under normal working conditions, accounting for planned stoppages like maintenance, lunch breaks, and shift changes.

50
New cards

Aggregate Planning

Intermediate-term planning across a 3 to 18 month horizon that balances total capacity and expected customer demand across product families at minimum total operating cost.

51
New cards

Level Strategy

An aggregate planning strategy that maintains a constant rate of output and stable workforce, relying on inventory buildups, backorders, or subcontracting to absorb seasonal demand variations.

52
New cards

Chase Strategy

An aggregate planning strategy that matches production capacity directly to demand in each period by adjusting workforce size, working hours, or shifts to minimize inventory carrying costs.

53
New cards

Master Production Schedule (MPS)

A detailed manufacturing priority schedule that disaggregates the aggregate plan, specifying exactly which individual end products will be built and in what quantities across specific time buckets.

54
New cards

Capacity Requirements Planning (CRP)

The process of determining the labor, equipment, and machine capacities needed to achieve the product volume targets set by the Master Production Schedule and Material Requirements Planning.

55
New cards

Push System

A production and inventory system where items are manufactured in batches based on forecasted demand and master schedules and then pushed into distribution channels.

56
New cards

Pull System

A lean production control system where the production and withdrawal of materials are triggered only when downstream workstations or end customers demand and pull them.

57
New cards

Makespan

The total elapsed time required to process and complete a set of jobs through all assigned machines or operations from start to finish.

58
New cards

Mean Flow Time

The average duration of time that jobs spend in the shop from initial arrival or release to final completion, equal to the sum of completion times divided by the total number of jobs.

59
New cards

Shortest Processing Time (SPT)

A priority sequencing rule that processes the job requiring the least amount of machine processing time first, which minimizes mean flow time and average work-in-process.

60
New cards

Johnson’s Rule

An optimization algorithm for sequencing nn jobs through two consecutive machines in identical order to minimize both the total makespan and idle time on the second machine.

61
New cards

Drum-Buffer-Rope (DBR)

The Theory of Constraints (TOC) production scheduling method where the bottleneck machine acts as the 'drum' setting system pace, the 'buffer' provides time protection against disruptions, and the 'rope' synchronizes raw material release.

62
New cards

Lead Time

The total elapsed time between placing a replenishment purchase order and receiving the goods in the warehouse, composed of pre-processing, processing, and post-processing stages.

63
New cards

Safety Stock

Buffer inventory maintained over and above anticipated cycle demand to protect against unpredictable spikes in customer demand and variability in supplier lead times.

64
New cards

Economic Order Quantity (EOQ)

The optimal batch order quantity that minimizes the total cost of managing inventory, balancing annual order setup costs against annual holding costs: EOQ=2DKH\text{EOQ} = \sqrt{\frac{2DK}{H}}.

65
New cards

ABC Analysis

An inventory classification technique based on the Pareto Principle (80/20 rule) dividing inventory into Category A (≈20%\approx 20\% of items generating ≈80%\approx 80\% of value), Category B (≈30%\approx 30\% of items generating ≈15%\approx 15\% of value), and Category C (≈50%\approx 50\% of items generating ≈5%\approx 5\% of value).

66
New cards

Cycle Counting

A perpetual inventory auditing method where small, designated subsets of inventory are counted continuously on a rotating schedule to verify inventory records without shutting down the facility.

67
New cards

MRO Inventory

Inventory consisting of Maintenance, Repair, and Operating supplies (such as lubricants, valves, safety gloves, and office stationery) used to support the manufacturing process without being incorporated into finished goods.

68
New cards

Supply Chain Management (SCM)

The active coordination and management of the end-to-end flow of materials, information, and financial resources across suppliers, manufacturers, logistics providers, and customers to enhance value and gain competitive advantage.

69
New cards

Logistics Management

A subset of supply chain management focused on planning, implementing, and controlling the efficient, cost-effective forward and reverse movement and storage of goods, services, and related information between origin and consumption.

70
New cards

Total Quality Management (TQM)

A holistic, company-wide management philosophy aimed at continuous improvement of all processes, systems, products, and services through total employee participation, process-centric design, and customer focus.

71
New cards

Statistical Quality Control (SQC)

The application of statistical techniques, sampling procedures, and probability theory to evaluate, establish, and maintain product quality standards throughout specification, production, and inspection.

72
New cards

Control Chart

A statistical process control tool showing plotted sample metrics against a center line, an Upper Control Limit (UCL), and a Lower Control Limit (LCL) to distinguish natural common causes of variation from assignable causes.

73
New cards

p-Chart

An attribute quality control chart used with variable-size subgroups that plots the proportion of nonconforming or defective items over time.

74
New cards

c-Chart

An attribute quality control chart used with constant, equal-sized subgroups that tracks the total count of nonconformities (defects) per inspection unit over time.

75
New cards

Acceptance Sampling

A statistical quality control procedure that inspects a designated random sample from a manufactured batch or lot to decide whether the entire batch should be accepted or rejected.

76
New cards

Kaizen

A Japanese corporate philosophy meaning 'improvement for the better' or continuous, incremental change involving every employee across all organizational levels to eliminate waste and optimize processes.

77
New cards

5S System

A Japanese visual management framework consisting of Sort (Seiri), Set in Order (Seiton), Shine (Seiso), Standardize (Seiketsu), and Sustain (Shitsuke) to enhance workplace productivity, organization, and safety.

78
New cards

Six Sigma

A rigorous, data-driven quality improvement methodology that aims to reduce process variation and eliminate defects so that processes produce no more than 3.4 Defects Per Million Opportunities (DPMO).

79
New cards

DMAIC

The five-step Six Sigma project lifecycle framework comprising Define, Measure, Analyze, Improve, and Control used to resolve process problems and sustain improvements.

80
New cards

Lean Manufacturing

A systematic manufacturing methodology derived from the Toyota Production System that maximizes customer value and throughput by identifying and eliminating non-value-adding waste across all operations.

81
New cards

Total Productive Maintenance (TPM)

A comprehensive equipment management system based on the 5S foundation that involves all plant employees—not just dedicated maintenance technicians—in proactive and autonomous maintenance to achieve zero breakdowns, zero accidents, and zero defects.