Heating and Cooling Systems — Construction Management and Jobsite Maintenance Study Notes

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/44

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 10:53 PM on 10/5/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

45 Terms

1
New cards

Jobsite safety

A set of practices to prevent injuries and property damage while meeting legal requirements.

2
New cards

Employers' responsibilities

Providing training, enforcing safety procedures, supplying tools and PPE, and correcting unsafe conditions.

3
New cards

Workers' responsibilities

Following safety procedures, using PPE, reporting hazards, and stopping work when unsafe.

4
New cards

Hazard recognition

The process of actively scanning the work area for potential dangers before they result in incidents.

5
New cards

Common energy sources in HVAC hazards

Electrical, mechanical, thermal, chemical, and gravitational.

6
New cards

Electrical shock/arc flash hazards

Risks from live panels, improper lockout/tagout, damaged cords, or wet conditions.

7
New cards

Cuts and punctures hazards

Risks from sharp sheet metal edges, ductwork, zip screws, and hand tools.

8
New cards

Burns and fires hazards

Risks from torches, brazing, soldering, and contact with hot piping.

9
New cards

Asphyxiation/poisoning hazards

Risks from combustion products and refrigerant releases in poorly ventilated areas.

10
New cards

Pressurized systems hazards

Risks from sudden releases of refrigerant lines, nitrogen cylinders, and hydronic piping.

11
New cards

Falls hazards

Risks from ladders, scaffolds, roofs, and lift equipment.

12
New cards

Hierarchy of controls

A ranking of methods to reduce hazards, from elimination to PPE.

13
New cards

Elimination (hierarchy of controls)

Removing the hazard entirely.

14
New cards

Substitution (hierarchy of controls)

Replacing a hazard with something safer.

15
New cards

Engineering controls (hierarchy of controls)

Using methods like guarding and ventilation to reduce risks.

16
New cards

Administrative controls (hierarchy of controls)

Implementing procedures and training to enhance safety.

17
New cards

PPE (hierarchy of controls)

Personal protective equipment used as a last line of defense.

18
New cards

Lockout/Tagout (LOTO)

The process of preventing unexpected startup or release of stored energy during servicing.

19
New cards

LOTO workflow steps

Identify energy sources, shut down equipment, isolate energy, apply locks and tags, release stored energy, verify isolation.

20
New cards

Hot work activities

Processes like brazing, soldering, and cutting that pose fire risks.

21
New cards

Refrigerant safety management

Preventing leaks, using proper recovery equipment, and ensuring ventilation.

22
New cards

Pre-task safety plan (PTP)

A document outlining hazards and controls before starting a specific task.

23
New cards

Scope of work

A defined statement of what a team is responsible for in a project.

24
New cards

Construction drawings

Plans that show equipment locations, duct routes, and system layouts.

25
New cards

Specifications (specs)

Written requirements detailing materials, standards, and installation instructions.

26
New cards

Construction schedules

Tables that outline equipment capacities, requirements, and installation timelines.

27
New cards

RFI (Request for Information)

A formal question to clarify conflicts or ambiguities in documents.

28
New cards

Submittal

Documents sent for approval before starting installation work.

29
New cards

Critical path in scheduling

Tasks that control the overall completion date of a project.

30
New cards

Material management

The processes of receiving, storing, protecting, tracking, and staging HVAC materials.

31
New cards

Receiving and inspection

The process of verifying deliveries for accuracy and condition upon arrival.

32
New cards

Storage practices in HVAC

Methods to protect materials from damage and contamination while on-site.

33
New cards

Staging

The process of placing materials near points of use to improve efficiency.

34
New cards

Quality control (QC)

Checks that ensure the installed system meets design intent and performs reliably.

35
New cards

Testing in HVAC

Verifying that systems operate correctly and safely after installation.

36
New cards

Commissioning

The structured process of verifying that systems operate according to design and owner needs.

37
New cards

Turnover documentation

O&M manuals, as-builts, and warranty information handed over to the owner at project completion.

38
New cards

Preventive maintenance (PM)

Planned service aimed at preventing equipment failures and performance loss.

39
New cards

Root cause analysis

A method of identifying the fundamental reason for a problem to prevent its recurrence.

40
New cards

Daily log entry

Documentation of daily site activities, labor, and issues encountered.

41
New cards

Change order

A formal change that affects the scope, cost, or schedule of a project.

42
New cards

Field change

Allowed adjustments made on-site that don’t alter the agreed scope.

43
New cards

Jobsite maintenance responsibilities

Ongoing upkeep of tools, temporary systems, and work areas for safety and compliance.

44
New cards

Communication in construction management

Ensuring clarity and accountability through various communication channels.

45
New cards

Housekeeping on jobsite

Maintaining an organized and clean site to prevent accidents and injuries.