1/17
Looks like no tags are added yet.
5S
used to improve flow and reduce wasted motion and search time
value stream mapping
Visualizes process steps and identifies bottlenecks
value analysis
Evaluate activities to remove non value added steps
Failure Mode and Effects Analysis (FMEA)
Assess potential failures and prioritizes risks
8 classic wastes
defects, overproduction, waiting, nonutilized talent transportation, inventory, motion, and extra processing
5S Methodology
how clutter slows down work and increase errors
Sort (seiri)
separate needed from unneeded items; Reduce inventory waste and overproduction
Straighten (seiton)
arrange items for easy access; minimizes waste remaining to motion, transportation and waiting
Standardize (seiketsu)
create consistent procedures and visual controls; Eliminate variation and rework
Sustain (shitsuke)
maintain discipline through audits and training; Ensure long term waste prevention
scrub/shine (seiso)
clean and maintain workplace daily; prevent defects and downtime by keeping equipment clean
value
what customer is willing to pay for
3 criteria test to determine value added activities
customer wants to pay for activity, the activity transforms the product or service, & activities are done right the first time
1st quadrant
pure waste (eliminate immediately)
2nd quadrant
non value added but necessary (optimize)
3rd quadrant
improvement opportunities (enhance or simplify)
4th quad
value added activities (protect and standardize)
value stream
all actions delivering product or service to customer