Electrical ✅

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/20

encourage image

There's no tags or description

Looks like no tags are added yet.

21 Terms

1
New cards

AFM: Use of Flight Deck Auxiliary Power

Outlets in Flight Deck→supplies power to PEDS→P6 &P18.

Requires operational Regulatory Approval

2
New cards

AC Power Principles

1. No paralleling⚡:Only 1 AC source at a time: IDG / APU / External Power

2. Only ONE AC source can power AC Transfer Buses at a time

3. Automatic transfer 🔄: New source→AC Transfer Bus →Old source disconnects→Through BTBs

3
New cards

IDG Disconnect 🔧: Integral electro-mechanical device

Complete mechanical Isolation between IDG & Engine.

reactivation can only be done by ground maintnance

4
New cards

Electrical System Divisions

⚡ AC→8 buses

  • 2 Transfer buses→Main distribution

  • 2 Main buses→assosiated loads

  • 2 Galley buses (C+D / A+B)

  • 2 Ground Service buses→Certain equepments without AC on

🔋 DC→5 buses

  • 2 DC buses

  • 1 Battery bus

  • 1 Hot Battery bus

  • 1 Switched Hot Battery bus

🚨 Standby→7

  • Static INV

  • AC Standby bus

  • DC Standby bus

  • 1 Main battery

  • Battery bus

  • Hot Battery bus

  • Switched Hot Battery bus


5
New cards

⚡ AC Power System

  • 3-phase AC voltage: 115 V ±5%

  • Frequency: 400 Hz ±5%

  • Rated Output: 90 kVA

3 Sources:

  • 2 IDGs

  • 1 APU Generator→one or both TB through BTBs

  • 1 External Power→ground elec. supply


6
New cards

🔋 DC Power System

  • Output: 28VDC

  • Supply: 3 Transformer Rectifier (TR) units

  • TR function: 115 AC → 28 DC


7
New cards

Standby Power

Battery

  • Type: Nickel-Cadmium (Ni-Cd).

  • Voltage: 24V DC ±4 V.

  • Operating range: 22–30V DC.

  • Fully charged → Minimum 30 min standby power (QRH).

⚡→🔋Transformer Rectifier (TR)

- Converts115 AC→28 DC

🔋→⚡Static Inverter (INV)

- Converts 24 DC → 115 AC

🔌 Battery Buses

  • Hot Battery Bus: Always connected to battery

  • Switched Hot Battery Bus: Powered when BAT switch ON

⚠ BAT DISCHARGE

- BAT switch ON + excessive battery discharge → BAT DISCHARGE light.

❄ Cold Weather Battery temperature below −18°C → Remove and store in warmer area (−18°C to below 40°C) to ensure APU starting capability.

8
New cards

Electrical Connections

🔌 Ground Service

  • Ground Service Bus 2 → Battery Charger TR.

  • External Ground Cart → Ground Service Buses 1 + 2.

⚡ Bus Tie Breakers (BTBs)

  • 2 BTBs → Normally OPEN.

  • AC source failure/disconnection → Available source powers affected Transfer Bus through BTBs.

⚡ AC Transfer Buses

  • Transfer Bus 1 → AC Standby Bus + TR 1.

  • Transfer Bus 2 → TR 2 + TR 3.

🔋 TR Connections

  • TR 1 + TR 2 → DC Bus 1 + DC Bus 2 + DC Standby Bus (via Cross Tie Bus Relay).

  • TR 3 → Battery Bus + Backup for TR 1 & TR 2.

  • Any 1 TR fails → Remaining 2 supply total connected load.

🔄 DC Cross Bus Tie Relay

  • Normally CLOSED (connected).

  • Automatically OPENS when:

    1. Glide slope capture during FD or A/P ILS approach → isolates DC Bus 1 from DC Bus 2, protecting NAV receivers and flight control computers from a single failure.

    2. BUS TRANSFER switch → OFF.

🔋 Single Battery

Generator loss → Battery powers 4 DC buses:

  • DC Standby Bus

  • Battery Bus

  • Switched Hot Battery Bus

  • Hot Battery Bus


9
New cards

🔌 Ground Service Switch🔋

Ground power → AC Ground Service Buses only.

  • Location: FWD Attendant’s Panel.

  • Powers: Utility outlets, cabin lighting + battery charger.

  • Does NOT power: All airplane electrical buses.


10
New cards

🔋 Battery Charger TR – Single Battery

Restores & Maintains battery at full electrical power Powered by→ AC Ground Service Bus 2

Operation:

Primary charge cycle complete → Charger changes to Constant-Voltage TR mode

In TR mode, it supplies:

  • Hot Battery Bus

  • Switched Hot Battery Bus

  • Battery Bus → only if TR 3 fails

Standby power: Loss of AC Transfer Bus 1 OR power source to DC Bus 1 → Battery / charger supplies AC + DC Standby Buses.

Memory flow: Charge → Maintain → TR mode → Supply buses → Backup standby power.

11
New cards

⚡ Automatic Generator On-Line Feature

AC TAKES OFF with APU powering BOTH AC Transfer Buses, then APU SHUTDOWN / FAILURE → Engine Generators 🔄automatically connect to their RESPECTIVE Transfer Buses.

Activation occurs ONLY INFLIGHT

Visual memory: ✈ APU → BOTH BUSES → ❌ APU FAILS → ⚡ ENGINE GENERATORS TAKE OVER

12
New cards

APU Operation – Electrical Power Failure

ALL Generators INOPERATIVE + Battery is ONLY electrical power source → APU OPERATION.

⚠ APU start attempts NOT RECOMMENDED >⇡25,000 ft.

Visual memory: ⚡❌ No Generators,🔋 Battery Only → APU ON Below 25k’

13
New cards

ISFD (Integrated Standby Flight Display) – AFM

@ Electrical Power-Up: Do NOT move AC until ISFD Alignment is COMPLETE

@ Loss of STANDBY POWER (Main Battery)→ ISFD Dedicated Battery continues operating ISFD for an additional 150mins.

Visual memory: 🔋 Main Battery LOST → ISFD backup battery ⚡ → +150 MINUTES.

14
New cards

⚡🔋 TR UNIT (Transformer Rectifier Unit)

Failure conditions:

  • ON GROUND: Any ONE TR fails

  • INFLIGHT: TR 1❌ fails OR TR 2 + TR 3❌ both fail

QRH – Restrictions:

❌ Don’t use AFDS (Autopilot Flight Director System) APP (Approach) Mode during ILS APP

🚫 Autoland NOT AVAILABLE

Visual memory:

  • 🛬 GROUND: Any 1 TR failure.

  • ✈ INFLIGHT: TR 1 ❌ OR TR 2 + TR 3 ❌.

  • Both conditions → No AFDS APP Mode during ILS + No Autoland.


15
New cards

⚠Electrical Emergency

Only 1 AC ⚡ power source remains (Engine Generator OR APU Generator)

Flight crew must:

  • LAND at Nearest Suitable Airport.

  • DECLARE EMERGENCY.

Memory: 1 AC ⚡ source only → Nearest Suitable Airport + Declare Emergency.

16
New cards

🎛 Electrical Controls & Indicators

1. DRIVE – AMBER 🟠

Illuminates when IDG→LOW OIL PRESSURE,

caused by 4 conditions (IIIE):

  • I – IDG Failure.

  • I – IDG Automatic disconnect due to high oil temp.

  • I – IDG External/manual disconnect through GEN DRIVE (IDG) DISCONNECT switch

  • E –Engine Shutdown

2. ELEC

Illuminates ON GROUND ONLY when fault exists in DC 🔋 system or Standby Powersystem

⚠ QRH: NO-GO → DO NOT TAKEOFF.

3. STANDBY PWR OFF – AMBER 🟠

Illuminates when ONE OR MORE of these buses are unpowered:

  • AC ⚡ Standby Bus

  • DC 🔋 Standby Bus

  • Battery Bus 🔋

4. TRANSFER BUS OFF – AMBER 🟠

Illuminates when related AC ⚡ Transfer Bus is NOT POWERED.

5. SOURCE OFF – AMBER 🟠

Illuminates when:

  • No source has been MANUALLY SELECTED to power related Transfer Bus, OR

  • Manually selected source has been DISCONNECTED

Important: If a source is selected to power the OPPOSITE Transfer Bus, BOTH Transfer Buses are powered.

6. Circuit Breaker Panels

Behind (FO→ P-6) → CBs 1, 2, 3, 4, 11, 12 + SPCU.

Behind (Captain→P-18) → CBs 1, 2, 3.

Quick visual memory 🧠

Indicator

Meaning

DRIVE 🟠

IDG low oil pressure

ELEC

DC 🔋 / Standby fault – Ground only

STANDBY PWR OFF 🟠

AC ⚡ / DC 🔋 / Battery Bus unpowered

TRANSFER BUS OFF 🟠

AC ⚡ Transfer Bus not powered

SOURCE OFF 🟠

No manually selected source / source disconnected


17
New cards

⚠ Electrical Remarks

1. WHEEL WELL Fire Warning Test→on Overheat & Fire Protection Panel may or may not illuminate when testing on DC power Only.

For accurate testing, perform Wheel Well Fire Detection System test AFTER AC power is established

2. Extended APU Operation on Ground→required on ground while ac buses are powered by AC electrical power→ Position an AC-powered fuel pump ON to→Extends service life of APU Fuel Control Unit.

18
New cards

Engine Generators 🔄Automatic Load Shedding

During an OVERLOAD, Engine Generators automatically shed (disconnect) electrical loads/buses to reduce generator load.

  • Single Generator Operation

Load shedding occurs incrementally, according to actual load sensing:

Stage

Loads shed

1st

Some buses are shed based on actual load sensing.

2nd

Galley A+B + Main Bus 2 (Transfer Bus 2).

3rd

If overload continues: Galley C+D + Main Bus 1 (Transfer Bus 1).

Further shedding

If overload still exists: IFE buses are shed.

  • Dual Generator Operation

NO LOAD SHEDDING,🔄Load Restoration

When configuration changes to more power sources (2 GEN operation):

→ Main Buses + Galley Buses + IFE Buses automatically restored

Manual Restoration: Cycle CAB/UTIL Power Switch:

OFF → ON to restore Galley & Main Bus power.

19
New cards

APU 🔄Automatic Load Shedding

During an OVERLOAD, the APU automatically sheds (disconnects) electrical loads/buses.

✈ Inflight – APU as the ONLY Power Source

Stage

Loads shed

1st

All Galley Buses (A+B and C+D) + Main Buses 1 & 2 automatically shed.

2nd

If overload continues, BOTH IFE Buses automatically shed.

🛬 On Ground

APU initially attempts to carry FULL electrical load.

If overload occurs:

1-stage: All Galley Buses (A+B and C+D) + Main Buses 1 & 2 are shed until the load is within limits.

Manual Restoration: Cycle CAB/UTIL Power Switch:

OFF → ON

20
New cards

AC / DC Powered Equipment


<p></p>
21
New cards

⏱ Important time limits

Equipment

Duration

Stall warning test

Up to 4 min

Emergency Exit Light

10 min

CVR RIPS

10 min

Right IRS

5 min only

ISFD dedicated battery

150 min