Water Transport. Midterm

0.0(0)
Studied by 1 person
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/74

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 1:54 AM on 9/29/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

75 Terms

1
New cards

ASCE Canon 1

Engineers shall hold paramount the safety, health and welfare of the public and shall strive to comply with the principles of sustainable development in the performance of their professional duties

2
New cards

ASCE Canon 4

Engineers shall act in professional matters for each employer or client as faithful agents or trustees, and shall avoid conflicts of interest

3
New cards

The 5 stages of a project

Planning

Designing

Construction

Operation

Maintenance

(De-commissioning)

4
New cards

Risk to the public

flooding from levee and dam breaks

ferry accidents

leaks of dangerous cargo

5
New cards

Risk to users

Collisions and grounding of vessels

6
New cards

Risk to economy

Interruptions of cargo movement

Shutdowns

7
New cards

Risk to environment

Hazardous cargo discharge

Habitat or migration damage

Pollution

8
New cards

Passing

Moving in opposite directions to meet and pass

9
New cards

Overtaking

One vessel overtakes and passes another moving in the same direction

10
New cards

Lock queuing procedures

First in - First out

Appointment

Shortest Lock Time First

Longest Lock Time First

11
New cards

Info needed for port design

  • Topography (water depth, land elevation, etc)

  • Ocean conditions (wave heights, directions, etc)

  • Geotech reports

  • Climate reports (wind, sea level, etc)

  • Vessel characteristics & dimensions

  • Channel parameters

  • Maneuverability

  • Cargo types

  • Intermodal connections

  • Landside logistics


12
New cards

Dolphin

Man-made berthing or mooring structure that extends above water level and is not connected to the shore or any other structure like a quay wall or jetty

13
New cards

Safety Factor

Structure resistance (capacity) / Applied load (demand)

14
New cards

Types of Transportation Modes

Water

Rail

Highway

Air

Pipeline

15
New cards

Marine Transportation System (MTS)

The collection of waterways, ports, vessels, equipment, intermodal connectors, information systems, and stakeholders that work together to move people and goods from origin to destination using waterborne transport for at least part of the journey

16
New cards

Intermodal Transport

Movement of passengers or freight by two or more modes in a single trip.

17
New cards

Multimodal Transport

Movement of passengers or freight by alternative modes

18
New cards

Freight Categories

Bulk

Breakbulk

Roll-on/Roll-off

Walk on/Walk off

Lighter on board

Container

Project

19
New cards

Bulk Cargo

Loose, flowable material that can loaded/unloaded by pipeline, conveyor, or grab (clamshell). Includes dry products like grain, coal, ore, and chemicals, and wet products like petroleum products, chemicals, and water. Also scrap metal

20
New cards

Container Cargo (Lo/Lo)

materials that are contained within closed boxes. Any cargo can be placed in a container but usually includes perishable (e.g. bananas) or higher value goods (electronics) that need protection from damage or pilferage.

21
New cards

Breakbulk Cargo

materials that are loaded/unloaded piecewise by lifting and lowering. Often palletized. Includes metal sheets, rolls, and bars, lumber, and food products.

22
New cards

Roll on/ Roll off Cargo (Ro/Ro)

vehicles or wheeled containers that can be rolled on and off via a ramp. Includes cars/trucks, agricultural/military vehicles, loaded truck trailers.

23
New cards

Walk on/Walk off Cargo (Wo/Wo)

human or animal passengers

24
New cards

Lighter on Board Cargo

a waterborne vessel that can be lowered over the side into water and move independently of delivery ship, perhaps by tug.

25
New cards

Project Cargo

odd-sized or shaped items or very heavy items that require special handling. Includes rocket motors, nuclear plant components, large HVAC system pieces.

26
New cards

TEU

Twenty ft equivalent unit

27
New cards

Engineering Principles

Safe

Effective

Efficient

Cost-effective

Reliable

Robust

Environmental Sustainability

Social Value

Aesthetic Value

Secure

28
New cards

Weather & Hydraulic Factors for Navigation Projects

Waves

Wind

Current (Tidal and/or River)

Tides

Salinity

Visibility (Fog, Rain, Snow)

Ice

29
New cards

Physical Data to be Evaluated

Weather:

Wind

Waves (Rain, Smog, Fog, Snow)

Ice


Site Conditions:

Current (Tidal, River, Seiche, Wave Generated)

Sediment movement of longshore drift

Type of bottom (Soft or Hard)

Water depths and water level fluctuations

Obstructions (Sunken Vessels, Abandoned Structures, etc.)

Existing bridge crossings (Location, Type Clearance0

30
New cards

Joint Probability

Probability that multiple events occur together.

31
New cards

Safety Factor Design

Adds a fixed design margin by increasing loads or reducing allowable strength.

32
New cards

Risked Based Design

Evaluates risk using both probability of failure and consequences of failure.

33
New cards

Port

location where design vessels can berth to load/unload cargo and cargo can be transferred to other modes or vessels. Usually includes dock, wharf, or moorings; equipment for loading/unloading and moving cargo; warehousing or land for temporary storage; and intermodal connections to rail, highway, or pipeline. Usually owned and operated by governmental or quasi-governmental organization

34
New cards

Terminal

facility for loading/unloading one vessel at a time or a specific type of vessel. A typical port will have several terminals. Many private terminals are located separately from ports. Some terminals are operated by private concern but located on public ports

35
New cards

Harbor

a protected waterbody where vessels moor

36
New cards

Examples of Ports and Terminals

Port of Gulfport

Port of New York and New Jersey

Lowndes County Port, Tom

Soya and Weyerheyser Terminals

37
New cards

Types of Intermodal Connectors and Ports

Railway

Highway

Pipeline

Air link

Bus and Train

Short-Sea-Shipping

38
New cards

Railway

mostly private rail system, but some ports own rail lines on port and to some offsite terminal. U.S. Rail system is non-government and badly fragmented, e.g. Chicago

39
New cards

Highway

most common. Severe congestion problems.

Examples: Gulfport, New Orleans, Los Angeles-Long Beach Ports

40
New cards

Pipeline

common for POL

41
New cards

Airlink

not common, but Boston has one

42
New cards

Bus and Trains

passengers from ferries

43
New cards

Short-Sea-Shipping

between shallow draft and deep draft vessels

44
New cards

Information Sources

Charts

Water levels

Navigation aids (Coast Guards)

Weather info (National Weather Service)

Automatic Identification Systems (AIS)

GPS

Other

45
New cards

Examples of Chart Information Sources

Show channel depths, landmarks, etc.

Paper

ENC - electronic navigation charts

Coasts and estuaries are done by NOAA/NOS

Inland waterways are done by COE

46
New cards

Examples of Water Levels Information Sources

Paper

Electronic versions

Real time

Coasts and estuaries NOS

Inland USGS

47
New cards

Length Overall (LOA)

Distance along centerline from extreme point in bow to extreme point in stern.

48
New cards

Length on Waterline (LWL)

Distance parallel to centerline along waterline in design-loaded condition.

49
New cards

Length Between Perpendiculars (LBP, LPP, or L)

Distance along centerline between bow and stern main perpendicular structural members

50
New cards

Beam (B)

Horizontal width of vessel at widest point

51
New cards

Draft (T)

Vertical distance from waterline to deepest point of vessel. (usually)

52
New cards

Forward & After Drafts (Tf, Ta)

Measured at the Perpendiculars or at draft marks.

53
New cards

Mean Draft (Tm)

Average of TF and TA

54
New cards

Freeboard (F)

Vertical distance from waterline to highest watertight point on vessel

55
New cards

Air Draft (T air)

Vertical clearance above waterline

56
New cards

Displacement

Weight of water displaced by the vessel. Expressed in Long Tons (2240lbs)

57
New cards

Displacement Volume

Volume of water displaced by the vessel

58
New cards

Deadweight Tonnage (DWT)

Displacement of fully loaded vessel minus Light Displacement

59
New cards

Loaded Displacement

Displacement of fully loaded vessel

60
New cards

Light Displacement

Displacement of empty vessel

61
New cards

Gross Register Tonnage

Total internal capacity as denoted on vessel's registry

62
New cards

Net Register Tonnage

DWT Minus displacement of crew, crew spaces, and propulsion as denoted on vessel's registry

63
New cards

Archimedes' Principle

A vessel displaces a volume of water equal to its own weight

64
New cards

Trim

Difference in draft between forward and aft

65
New cards

List

Difference in draft side to side

66
New cards

Plimsoll Line (Internal load line)

Markings on a seagoing vessel's hull to indicate maximum safe draft under various conditions

67
New cards

Rake

Sloped front end of a vessel to reduce drag.

68
New cards

Ballast

Gives stability to a ship by putting a heavy substance in its bilge.

(When a tanker or bulk cargo ship has discharged its cargo, it typically takes on ballast by flooding internal tanks with seawater in order to maintain stability and keep the propeller immersed, sometimes referred to as "Sailing draft" Maximum ballast Capacities of most vessels are on the order of ½ of their full load displacement

(tankers "in ballast" is ordinarily at 30-50% of its full load displacement)

69
New cards

Bilge

The area on the outer surface of a ship's hull where the bottom curves to meet the vertical sides. The lowest internal portion of the hull

70
New cards

One Way Traffic

Single channel. One direction passage at a time

71
New cards

Two Way Traffic

Multi-lane traffic either passing or overtaking

72
New cards

U.S. Lock Traffic Priorities (These are typical, but actual priorities are set by the lock master)

1. U.S. Military Craft

2. U.S. Government Craft

3. Commercial Passenger Craft

4. Commercial Cargo Vessels

5. Commercial Fishing Craft

6. Recreational Craft

73
New cards

Vertical Ship Motion

Heave = Directly Up and Down from the vertical, central axis of ship

Pitch = Moving around the Horizontal Axis of the ship that runs side to side

Roll = Moving around the horizontal axis that runs from the front to back of the ship

74
New cards

Horizontal Ship Motion

Yaw = Moving around the vertical, central axis of the ship

Sway = Moving side to side on the horizontal axis of the ship

Surge = Moving front to back

75
New cards

Vessel Propulsion & Steering

Steering occurs by deflecting the prop jet with the rudder

Maximum steering occurs when you have prop working at full power