Layout strategy
Arranging space, equipment, and people to improve utilization, flow, safety, customer interaction, and flexibility.
Office layout
Positions workers, equipment, and offices to facilitate collaboration and information flow.
Retail layout
Allocates display space based on customer behavior to maximize profitability per square foot or shelf space.
Warehouse layout
Balances low-cost storage with low-cost material handling.
Fixed-position layout
Layout for large, bulky projects such as ships or buildings where the product stays in place.
Process-oriented layout (job shop)
Groups similar machines or functions together; suitable for low-volume, high-variety work.
Work-cell layout
Groups workers and equipment to produce one product or a family of related products.
Product-oriented layout
Arranges operations around standardized, high-volume, low-variety production.
Material handling costs
Costs of incoming transportation, storage, finding and moving materials, outgoing transportation, and related resources.
Automated storage and retrieval system (ASRS)
Automated equipment that stores and retrieves warehouse items to improve productivity.
Cross-docking
Moving incoming materials directly from receiving to shipping without warehouse storage.
Process-oriented layout advantage
Flexibility to handle many different products or services.
Process-oriented layout disadvantage
Complex scheduling and potentially high setup, labor, and material handling costs.
Muther's grid
Closeness-rating tool used to prioritize which departments should be near one another when quantitative flow data are limited.
Muther's grid ratings
A = absolutely necessary; E = especially important; I = important; O = ordinary OK; U = unimportant; X = not desirable.
Focused facility
Facility organized around a family of similar products with reasonably stable demand.
Takt time
Available production time divided by customer demand; the pace needed to meet demand.
Group technology
Identifying products with similar characteristics to organize production into work cells.
Work-cell requirements
Related product family, sufficient volume, cross-trained workers, and equipment that can be rearranged.
Repetitive/product-oriented layout requirements
High volume, stable demand, standardized products, and adequate uniform supplies.
Fabrication line
Machine-paced sequence of equipment that makes components.
Assembly line
Series of workstations that put fabricated parts together; can be balanced by shifting tasks.
Assembly-line balancing
Assigning tasks among workstations to minimize idle-time imbalance while meeting output.
Cycle time
Available production time divided by required output.
Theoretical minimum workstations
Total task time divided by cycle time; round up to a whole workstation.
Precedence relationships
Restrictions specifying which assembly tasks must be completed before others.
Human resource strategy
Managing labor and designing jobs so people are used effectively and efficiently while maintaining reasonable quality of work life.
Follow demand exactly
Employment policy that changes workforce levels with demand and treats labor as a variable cost.
Hold employment constant
Employment policy that maintains a stable workforce and treats labor as a fixed cost.
Flextime
Work schedule allowing employees, within limits, to determine their own hours.
Compressed workweek
Work arrangement with fewer but longer workdays.
Part-time status
Work arrangement with fewer, potentially irregular hours.
Job classification and work rules
Rules specifying who may perform tasks, when, and under what conditions; can restrict flexibility.
Job design
Specifying tasks that constitute a job for a person or group.
Labor specialization
Dividing work into unique tasks to improve dexterity and reduce time lost switching tasks.
Job expansion
Adding variety or responsibility to work to reduce boredom from specialization.
Job enlargement
Adding more tasks at approximately the same level of responsibility.
Job rotation
Moving employees among different jobs to increase variety and skills.
Job enrichment
Adding planning, control, and responsibility to a job.
Employee empowerment
Giving employees authority and responsibility for decisions about their work.
Self-directed teams
Teams that take substantial responsibility for organizing and managing their work.
Hawthorne studies
Studies that highlighted the importance of social and psychological factors in worker productivity.
Skill variety
Job characteristic involving use of different skills and talents.
Job identity
Job characteristic involving completion of an identifiable whole piece of work.
Job significance
Job characteristic describing the importance or impact of the work.
Autonomy
Job characteristic giving workers freedom and discretion in how to do their work.
Feedback
Job characteristic providing information on how well work is performed.
Ergonomics (human factors)
Study of the interaction between people, their work environment, and machines.
Work environment factors
Illumination, noise, temperature, and humidity that affect work.
Methods analysis
Studying how tasks are performed to improve work methods.
Flow diagram
Diagram showing movement of people or materials through a workspace.
Process chart
Chart documenting steps such as operations, transportation, inspections, delays, and storage.
Activity chart
Chart analyzing how people, machines, or crews use time.
Operations chart
Chart analyzing body movements used to complete a task.
Labor standards
Expected time required to perform a task under specified conditions.
Four methods of setting labor standards
Historical experience, time studies, predetermined time standards, and work sampling.
Time study
Measuring task elements and adjusting observed time for performance and allowances.
Average observed time
Sum of observed times divided by number of observations.
Performance rating
Adjustment reflecting how fast or slow a worker performs compared with normal pace.
Normal time
Average observed time multiplied by the performance rating factor.
Standard time
Normal time adjusted to include personal, fatigue, and delay allowances.
Personal time allowance
Time for personal needs such as restrooms or water.
Delay allowance
Extra time allowed for unavoidable delays.
Fatigue allowance
Extra time allowed for worker fatigue.
Time-study sample size factors
Desired accuracy, confidence level, and variation in observed task times.
Predetermined time standards
Standard times built from established times for small basic motions or work elements.
Work sampling
Observing work at random times to estimate proportions of time spent on activities.
Job design ethics
Fairness, equal opportunity, equal pay for equal work, and safe working conditions.
Supply chain management
Structuring the supply chain to maximize competitive advantage and benefits to the final consumer.
Supply chain
Network of suppliers, producers, distributors, retailers, and customers from raw materials to final consumer.
Tier 1 supplier
Supplier that directly supplies the manufacturer.
Tier 2 supplier
Supplier that supplies a tier 1 supplier.
Tier 3 supplier
Supplier further upstream that supplies a tier 2 supplier.
Low-cost supply chain strategy
Emphasizes supplier cost, minimal inventory, and inexpensive transportation.
Response supply chain strategy
Emphasizes supplier capacity, speed, flexibility, buffer stock, and fast transportation.
Differentiation supply chain strategy
Emphasizes product-development capability, collaboration, and sharing market information.
Make-or-buy decision
Choosing whether to produce a product or service internally or purchase it externally.
Outsourcing
Transferring activities and resources previously handled internally to outside vendors.
Six sourcing strategies — VERY IMPORTANT
Many suppliers, few suppliers, vertical integration, joint ventures, keiretsu networks, and virtual companies.
Many suppliers
Competitive sourcing, usually for commodities, in which price is a major selection factor.
Few suppliers
Building long-term relationships with a small number of suppliers to gain scale, expertise, and cooperation.
Vertical integration
Developing or acquiring the ability to perform activities previously handled by suppliers or distributors.
Backward integration
Moving ownership or control upstream toward raw materials and suppliers.
Forward integration
Moving ownership or control downstream toward customers and distribution.
Joint venture
Formal collaboration between organizations to combine strengths, secure supply, or reduce costs.
Keiretsu network
Japanese-style coalition of firms and suppliers linked through long-term relationships, cooperation, and sometimes financial support.
Virtual company
Organization that relies on flexible supplier relationships to provide services or products as demand changes.
Local optimization
Decisions that benefit one supply-chain stage but may worsen overall chain performance.
Bullwhip effect
Demand-order fluctuations that become larger as orders move upstream through the supply chain.
Large-lot problem
Large shipments may lower transportation or production costs but raise inventory holding costs.
Logistics management
Integrating material acquisition, movement, and storage to reduce costs and improve service.
Supply chain supplier-selection criteria
Criteria vary by strategy: cost for low cost; speed and capacity for response; development and collaboration for differentiation.
Lean operations
Supplying exactly what the customer wants, when wanted, without waste, through continuous improvement.
Three fundamental lean tasks
Eliminate waste, remove variability, and improve throughput.
Waste
Anything that does not add value from the customer's point of view.
Seven wastes (Ohno) — IMPORTANT
Overproduction, queues/waiting, transportation, inventory, motion, overprocessing, and defects.
Overproduction
Making more or earlier than is needed.
Queues (waiting)
Idle time while workers, materials, or products wait.
Transportation waste
Unnecessary movement of materials between places.
Inventory waste
Excess materials, work-in-process, or finished goods.