Layout strategy

Arranging space, equipment, and people to improve utilization, flow, safety, customer interaction, and flexibility.

2
New cards

Office layout

Positions workers, equipment, and offices to facilitate collaboration and information flow.

3
New cards

Retail layout

Allocates display space based on customer behavior to maximize profitability per square foot or shelf space.

4
New cards

Warehouse layout

Balances low-cost storage with low-cost material handling.

5
New cards

Fixed-position layout

Layout for large, bulky projects such as ships or buildings where the product stays in place.

6
New cards

Process-oriented layout (job shop)

Groups similar machines or functions together; suitable for low-volume, high-variety work.

7
New cards

Work-cell layout

Groups workers and equipment to produce one product or a family of related products.

8
New cards

Product-oriented layout

Arranges operations around standardized, high-volume, low-variety production.

9
New cards

Material handling costs

Costs of incoming transportation, storage, finding and moving materials, outgoing transportation, and related resources.

10
New cards

Automated storage and retrieval system (ASRS)

Automated equipment that stores and retrieves warehouse items to improve productivity.

11
New cards

Cross-docking

Moving incoming materials directly from receiving to shipping without warehouse storage.

12
New cards

Process-oriented layout advantage

Flexibility to handle many different products or services.

13
New cards

Process-oriented layout disadvantage

Complex scheduling and potentially high setup, labor, and material handling costs.

14
New cards

Muther's grid

Closeness-rating tool used to prioritize which departments should be near one another when quantitative flow data are limited.

15
New cards

Muther's grid ratings

A = absolutely necessary; E = especially important; I = important; O = ordinary OK; U = unimportant; X = not desirable.

16
New cards

Focused facility

Facility organized around a family of similar products with reasonably stable demand.

17
New cards

Takt time

Available production time divided by customer demand; the pace needed to meet demand.

18
New cards

Group technology

Identifying products with similar characteristics to organize production into work cells.

19
New cards

Work-cell requirements

Related product family, sufficient volume, cross-trained workers, and equipment that can be rearranged.

20
New cards

Repetitive/product-oriented layout requirements

High volume, stable demand, standardized products, and adequate uniform supplies.

21
New cards

Fabrication line

Machine-paced sequence of equipment that makes components.

22
New cards

Assembly line

Series of workstations that put fabricated parts together; can be balanced by shifting tasks.

23
New cards

Assembly-line balancing

Assigning tasks among workstations to minimize idle-time imbalance while meeting output.

24
New cards

Cycle time

Available production time divided by required output.

25
New cards

Theoretical minimum workstations

Total task time divided by cycle time; round up to a whole workstation.

26
New cards

Precedence relationships

Restrictions specifying which assembly tasks must be completed before others.

27
New cards

Human resource strategy

Managing labor and designing jobs so people are used effectively and efficiently while maintaining reasonable quality of work life.

28
New cards

Follow demand exactly

Employment policy that changes workforce levels with demand and treats labor as a variable cost.

29
New cards

Hold employment constant

Employment policy that maintains a stable workforce and treats labor as a fixed cost.

30
New cards

Flextime

Work schedule allowing employees, within limits, to determine their own hours.

31
New cards

Compressed workweek

Work arrangement with fewer but longer workdays.

32
New cards

Part-time status

Work arrangement with fewer, potentially irregular hours.

33
New cards

Job classification and work rules

Rules specifying who may perform tasks, when, and under what conditions; can restrict flexibility.

34
New cards

Job design

Specifying tasks that constitute a job for a person or group.

35
New cards

Labor specialization

Dividing work into unique tasks to improve dexterity and reduce time lost switching tasks.

36
New cards

Job expansion

Adding variety or responsibility to work to reduce boredom from specialization.

37
New cards

Job enlargement

Adding more tasks at approximately the same level of responsibility.

38
New cards

Job rotation

Moving employees among different jobs to increase variety and skills.

39
New cards

Job enrichment

Adding planning, control, and responsibility to a job.

40
New cards

Employee empowerment

Giving employees authority and responsibility for decisions about their work.

41
New cards

Self-directed teams

Teams that take substantial responsibility for organizing and managing their work.

42
New cards

Hawthorne studies

Studies that highlighted the importance of social and psychological factors in worker productivity.

43
New cards

Skill variety

Job characteristic involving use of different skills and talents.

44
New cards

Job identity

Job characteristic involving completion of an identifiable whole piece of work.

45
New cards

Job significance

Job characteristic describing the importance or impact of the work.

46
New cards

Autonomy

Job characteristic giving workers freedom and discretion in how to do their work.

47
New cards

Feedback

Job characteristic providing information on how well work is performed.

48
New cards

Ergonomics (human factors)

Study of the interaction between people, their work environment, and machines.

49
New cards

Work environment factors

Illumination, noise, temperature, and humidity that affect work.

50
New cards

Methods analysis

Studying how tasks are performed to improve work methods.

51
New cards

Flow diagram

Diagram showing movement of people or materials through a workspace.

52
New cards

Process chart

Chart documenting steps such as operations, transportation, inspections, delays, and storage.

53
New cards

Activity chart

Chart analyzing how people, machines, or crews use time.

54
New cards

Operations chart

Chart analyzing body movements used to complete a task.

55
New cards

Labor standards

Expected time required to perform a task under specified conditions.

56
New cards

Four methods of setting labor standards

Historical experience, time studies, predetermined time standards, and work sampling.

57
New cards

Time study

Measuring task elements and adjusting observed time for performance and allowances.

58
New cards

Average observed time

Sum of observed times divided by number of observations.

59
New cards

Performance rating

Adjustment reflecting how fast or slow a worker performs compared with normal pace.

60
New cards

Normal time

Average observed time multiplied by the performance rating factor.

61
New cards

Standard time

Normal time adjusted to include personal, fatigue, and delay allowances.

62
New cards

Personal time allowance

Time for personal needs such as restrooms or water.

63
New cards

Delay allowance

Extra time allowed for unavoidable delays.

64
New cards

Fatigue allowance

Extra time allowed for worker fatigue.

65
New cards

Time-study sample size factors

Desired accuracy, confidence level, and variation in observed task times.

66
New cards

Predetermined time standards

Standard times built from established times for small basic motions or work elements.

67
New cards

Work sampling

Observing work at random times to estimate proportions of time spent on activities.

68
New cards

Job design ethics

Fairness, equal opportunity, equal pay for equal work, and safe working conditions.

69
New cards

Supply chain management

Structuring the supply chain to maximize competitive advantage and benefits to the final consumer.

70
New cards

Supply chain

Network of suppliers, producers, distributors, retailers, and customers from raw materials to final consumer.

71
New cards

Tier 1 supplier

Supplier that directly supplies the manufacturer.

72
New cards

Tier 2 supplier

Supplier that supplies a tier 1 supplier.

73
New cards

Tier 3 supplier

Supplier further upstream that supplies a tier 2 supplier.

74
New cards

Low-cost supply chain strategy

Emphasizes supplier cost, minimal inventory, and inexpensive transportation.

75
New cards

Response supply chain strategy

Emphasizes supplier capacity, speed, flexibility, buffer stock, and fast transportation.

76
New cards

Differentiation supply chain strategy

Emphasizes product-development capability, collaboration, and sharing market information.

77
New cards

Make-or-buy decision

Choosing whether to produce a product or service internally or purchase it externally.

78
New cards

Outsourcing

Transferring activities and resources previously handled internally to outside vendors.

79
New cards

Six sourcing strategies — VERY IMPORTANT

Many suppliers, few suppliers, vertical integration, joint ventures, keiretsu networks, and virtual companies.

80
New cards

Many suppliers

Competitive sourcing, usually for commodities, in which price is a major selection factor.

81
New cards

Few suppliers

Building long-term relationships with a small number of suppliers to gain scale, expertise, and cooperation.

82
New cards

Vertical integration

Developing or acquiring the ability to perform activities previously handled by suppliers or distributors.

83
New cards

Backward integration

Moving ownership or control upstream toward raw materials and suppliers.

84
New cards

Forward integration

Moving ownership or control downstream toward customers and distribution.

85
New cards

Joint venture

Formal collaboration between organizations to combine strengths, secure supply, or reduce costs.

86
New cards

Keiretsu network

Japanese-style coalition of firms and suppliers linked through long-term relationships, cooperation, and sometimes financial support.

87
New cards

Virtual company

Organization that relies on flexible supplier relationships to provide services or products as demand changes.

88
New cards

Local optimization

Decisions that benefit one supply-chain stage but may worsen overall chain performance.

89
New cards

Bullwhip effect

Demand-order fluctuations that become larger as orders move upstream through the supply chain.

90
New cards

Large-lot problem

Large shipments may lower transportation or production costs but raise inventory holding costs.

91
New cards

Logistics management

Integrating material acquisition, movement, and storage to reduce costs and improve service.

92
New cards

Supply chain supplier-selection criteria

Criteria vary by strategy: cost for low cost; speed and capacity for response; development and collaboration for differentiation.

93
New cards

Lean operations

Supplying exactly what the customer wants, when wanted, without waste, through continuous improvement.

94
New cards

Three fundamental lean tasks

Eliminate waste, remove variability, and improve throughput.

95
New cards

Waste

Anything that does not add value from the customer's point of view.

96
New cards

Seven wastes (Ohno) — IMPORTANT

Overproduction, queues/waiting, transportation, inventory, motion, overprocessing, and defects.

97
New cards

Overproduction

Making more or earlier than is needed.

98
New cards

Queues (waiting)

Idle time while workers, materials, or products wait.

99
New cards

Transportation waste

Unnecessary movement of materials between places.

100
New cards

Inventory waste

Excess materials, work-in-process, or finished goods.