1/37
Looks like no tags are added yet.
A _____ is an intense and rapid improvement process in which a team or a department throws all its resources into an improvement project over a short time period.
kaizen blitz
In the PDCA cycle, designing the product takes place in the _____ stage
plan
In the PDCA cycle, using feedback to incorporate improvements in the next phase of planning happens in the _____ stage
act
The DMAIC approach used in Six Sigma is expanded as
Define, Measure, Analyze, Improve, and Control.
In the DMAIC process used in Six Sigma, the process of drilling down to a more specific problem statement is called
project scoping
In the DMAIC process used in Six Sigma, the characteristics that have the most impact on product or service performance are called:
critical to quality.
The _____ phase of DMAIC focuses on why defects, errors, or excessive variation occur.
Analyze
The_____ phase of DMAIC addresses project management issues that answer questions about what will need to be done, by whom, and when
define
In which phase of the DMAIC process does statistical thinking play a critical role?
analyze
The _____ phase of the Six Sigma DMAIC process focuses on how to maintain the improvements, which includes putting tools in place to ensure that the key variables remain within the maximum acceptable ranges under the modified process.
control
With respect to the seven QC tools, a _____ is a picture of a process that shows the sequence of steps performed.
flowchart
Flowcharts are also known as:
process maps.
With respect to the types of quality-related data, _____ data are obtained by counting or from some type of visual inspection.
attribute data
The number of invoices that contain errors, the number of parts that conform to specifications, and the number of surface defects on an automobile panel are examples of _____ data
attribute
With respect to the types of quality-related data, ______ data are collected by numerical measurement on a continuous scale
variable
A histogram is a graphical representation of
the variation in a set of data.
_____ is a technique for prioritizing types or sources of problems.
Pareto analysis
In a Pareto distribution, the characteristics are ordered:
from largest frequency to smallest.
A _____ is also known as the Ishikawa diagram.
cause-and-effect diagram
A_____ illustrates relationships between hypothesized causes and effects.
scatter diagram
_____, first proposed by Walter Shewhart in 1924, are the backbone of statistical process control
Control charts
With respect to the Japanese terms of the 5S concept, _____ means sorting.
seiri
With respect to the Japanese terms of the 5S concept, _____ means setting in order
seiton
With respect to the terms used in 5S, seiso means _____.
shine
With respect to the terms used in 5S, seiketsu means _____.
standardize
With respect to the terms used in 5S, shitsuke means _____.
sustain
With respect to the various tools used in lean thinking, _____ is designed to ensure that equipment is operational and available when needed
total productive maintenance
With respect to the various tools used in lean thinking, in the _____ system, upstream suppliers do not produce until the downstream customer signals a need for parts.
pull production
A pull production system is also known as _____.
kanban
_____ refers to rapid changeover of tooling and fixtures in machine shops so that multiple products in smaller batches can be run on the same equipment.
Single minute exchange of dies
Breakthrough improvement refers to _____.
discontinuous change
Breakthrough improvement is often motivated by:
stretch goals.
_____ is the search for best practices that will lead to superior performance.
Benchmarking
Two major types of benchmarking are:
competitive and generic.
The term _____ refers to approaches that produce exceptional results, are usually innovative in terms of the use of technology or human resources, and are recognized by customers or industry experts.
best practices
_____ is focused on breakthrough improvement to dramatically improve the quality and speed of work and to reduce its cost by fundamentally changing the processes by which work gets done.
suboptimization
The _____ is the extent to which the process maps onto the dimensions of the business, from a single activity in one function to spanning the entire business unit is critical to the long-term success of reengineering initiatives.
breadth
_____ is a tool for involving all people from all ranks, levels, and functions of the organization for problem solving and improvement.
Work-out