1/38
Looks like no tags are added yet.
TRUSS
Characteristics of a good knot
T – Easy to Tie
R – Easy to Recognise
U – Easy to Untie
S – Should not Slip or excess tighten
S – Should not reduce Strength & damage rope
STRICT
ROPE CARE
S – Select the correct knot
T – Tension on the line to set/tighten
R – Remove /Release all knots after use
I – Inspect all knots after tying. Recheck
C – Checked by another FF (Life Rescue Lines)
T – Tail of 150mm
CAMSUE
Things that can Damage Ropes
C - Chemicals
A - Abrasion
M – Mechanical Damage
S – Shock Loading
U - UV
E – Extreme Heat
HOTS
Hazardous Atmospheres
H – High Temperatures
O – Oxygen Deficiencies
T – Toxic Atmosphere
S – Smoke Concentrations
WUCOMS
W - What is it
U - Uses
C - Construction
O - Operation
M - Maintenance
S - Safety
DILFWA
Factors that affect pressure and flow in mains
D- Diameter of the main
I - Internal surface of the main
L - Length of the main
F - Fittings attached
W - Water pumping stations placed in the reticulation system
A - Amount of water being drawn by other consumers
ERSFW
Combating Heat Stroke
E - Remove from Environment and place in shade
R - Remove clothing down to underwear
S - Sponge /Spray with water
F - Fan /Expose to a breeze
W - If conscious, small sips of Water
PPRR
Risk Management Model
P - Prevention
P - Preparedness
R - Response
R - Recovery
SEMP
State Emergency Management Plan
S - State
E - Emergency
M - Management
P - Plan
B MIND
Fire Rescue Victoria Act 1958 78A
B - Guilty of any Breach of the regulations;
M - Guilty of any Misconduct ;
I - Inefficient or incompetent
N - Negligent or careless
D - Disgraceful or improper conduct
HERTH
FRV Specialist Response
H - HAZMAT
E - EMR
R - RESCUE
T - TRENCH
H - HART
OISAB
Sections of a Wordback
O - Name of the Officer
I - The Incident type
S - Status of emergency
A - Address of the incident
B - Optional Brief description
CAN
Tactical SITREP
C - Conditions
A - Actions
N - Needs
SMEACSQ
Memory aid to Assist in Communications
S - Situation
M - Mission
E - Execution
A - Admin & logistics
C - Command & comms
S - Safety
Q - Questions
ESEAP
Hierarchy of Controls
E - Eliminate
S - Substitute
E - Engineering Controls
A - Admin Controls
P - PPC /PPE
AIIMS
Australasian Inter-service Incident Management System
A - Australasian
I - Inter -service
I - Incident
M - Management
S - System
FFUMS
AIIMS Principles
F - Flexible
F - Functional Management
U - Unity of Control
M - Management of Objectives
S - Span of Control
SMART
Management by Objectives
S - Specific
M - Measurable
A - Achievable
R - Relevant
T - Time Framed
iSLOPI
Functional Management
I - Incident Controller (has)
S - Safety Officer
L - Logistics Officer
O - Operations Officer
P - Planning Officer
I - Public Information Officer
HPPCG
Extension ladders – Sitting considerations
H - Height (will it reach 3-5 rungs)
P - Projection
P - Plumbing
C - Clearance (above & behind)
G - Ground condition
BLEVE
Boiling Liquid Expanding Vapour Explosion
B - Boiling
L - Liquid
E - Expanding
V - Vapour
E - Explosion
PENSPACE
Safety Precautions for Building Collapse
P - PPE worn correctly
E - Evacuate if signs of impending collapse
N - No go zones (personnel and vehicles)
S - Safety Officer
P - Path of escape
A - Awareness of surroundings
C - Communications E - Engineer
SPADRA
Safe Person Approach Dynamic Risk Assessment
S - Safe
P - Person
A - Approach
D - Dynamic
R - Risk
A - Assessment
SACT
Actions Upon Locating a Casualty
S - Sweep the area
A - Assess (rescue method, air, exit route)
C - Communicate to IC Tactical Sitrep
T - Transport the casualty
PACT
The PACT check before entering a hazardous atmosphere
P - PPE/PPC correctly worn and functioning, equipment secure
A - Air is pressurised, above 250 bar and positive pressure
C - Communication, Voice projection and radio working and BA team name is known
T - Tally Tag & Task, BA control board has correct tag and task is known for both crew
RECEO
R - Rescue
E - Exposure
C - Containment
E - Extinguish
O - Overhaul
DDD
3 factors for asbestos related diseases
D - Dose
D - Dimension
D - Durability
DEBRiS
D - Decontamination of Firefighters
E - Entry and Exit of hot zones
B - Breathing Apparatus (BA) Service areas
R - Rehab/AV monitoring of firefighters
i - incident accountability of all personnel
S - Staging area (Firefighters/Appliances)
IFOMZ
Using foam on an appliance
I - Isolate - close recirc
F - Foam system on - turn on drive water (F is for water)
O - Open foam supply - turn the foam tank on or access external foam supply
M - Meter the concentrate - set metering to the correct flow rate at correct percentage
Z - Zero the compound gauge - open the feed (gate) maintaining zero on compound gauge to a max 35kPa
FAT PIGS OR DEAD PIGS
Size-Ups
F - Facts
P - Probabilities
O - Own situation
D - Decision
P - Plan
CBF CBD
Visual Inspection of BA
C - Carrier Frame and Harness
B - Battery Module
F - Face Mask
C - Control Module
B - Buddy Breather
D - Demand Valve
"Can't Be F*ed, Can't Be Done"
B-SAHF
B - Building
S - Smoke
A - Airtrack
H - Heat
F - Flame
VESDA
V - Very
E - Early
S - Smoke
D - Detection
A - Apparatus
LACES
L - Lookout
A - Awareness
C - Communication
E - Escape Routes
S - Safety Zones
MANTRA
M - Mayday
A - Air Management
N - Noise
T - Triangulation
R - Relocate
A - Alert
HELPSME
H - Hoseline
E - Extinguisher
L - LPG/EV
P - Park Brake
S - Stabilisation
M - Medical
E - Extrication
DANGER
D - Do not enter smoke, gas or vapour
A - Approach upwind & uphill
N - No go zones
G - Gather information from distance
E - Examine more closely from hot zone
R - Resond according to the information available
PPC BEL
Safety Features of a BA
P - Pressure Gauge
P - Pressure Reducing Valve
C - Carrier Frame and Harness
B - Buddy Lights
E - Electronic Alarms
L - Low Pressure Warning Whistle
AIRMEN
A - Approach
I - Insulate/Isolate
R - Clear Runway
M - Maintain
E - Evacuate
N - Next Appliance