Construction I Midterm

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/155

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 4:21 AM on 10/4/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

156 Terms

1
New cards

adobe

sun-dried earth bricks, non kiln-fired, requires protection from rain, moisture, and erosion

2
New cards

adobe bricks

made on situ or near, 10”x14”x4”, 35-40 lbs

3
New cards

adobe mixture

sand, silt, clay, and water, sometimes straw (reinforcement), clay acts as a binder, clean water and low salt

4
New cards

adobe forms

wooden or metal formwork, flat surface and then removed to dry in place

5
New cards

adobe plaster

limit moisture shrinkage and swelling, traditionally mud plaster, modernly portland cement stucco (3/4”)

6
New cards

adobe plaster section


7
New cards

adobe coating

gypsum-base whitewash, lime plaster, portland cement stucco → renewed regularly

8
New cards

great mosque of djonne

scaffolding built in for maintenance of adobe

9
New cards

stabilized adobe

portland cement or other admixtures, bricks remain exposed

10
New cards

marfa house

exposed stabilized adobe

11
New cards

adobe lintels

usually wood, supports low adobe tension

12
New cards

adobe lintel section


13
New cards

adobe environmental impact


14
New cards

rammed earth

gravel, sand, silt, and clay, temporary formwork

15
New cards

slip forming section

compaction

16
New cards

rammed earth load-bearing


17
New cards

rammed earth bond beams

distribute roof loads


18
New cards

rammed earth environmental impact

specific mixture, similar to adobe

19
New cards

brick

fired in kilns, pug milled → unit of clay

20
New cards

masonry

bricks, stones, cmus are units, modularity, strongest in compression and bonded with mortar

21
New cards

brick types

common brick or face brick (FB)

22
New cards

face brick tolerance

23
New cards

brick grades

24
New cards

brick sizes

nomial includes brick and mortar joint → 4×8×2/3”

25
New cards

bonding

26
New cards

masonry wall section


27
New cards

brick orientation


28
New cards

brick bonds


29
New cards

unreinforced masonry

grouted or contiguous (truss ties)


30
New cards

masonry cavity wall


31
New cards

masonry insulated cavity wall


32
New cards

masonry reinforced

steel bars embedded in grout filled cavity


33
New cards

cmu (concrete masonry unit)

nominal 8×8×16, hollow and reinforced

34
New cards

horizontal connections


35
New cards

frame and infill

concrete frame, brick/masonry infill

36
New cards

masonry lintels


37
New cards

masonry arches and centering

spanned radially or with temporary formwork

38
New cards

stone

quarried or collected fieldstone, noncombustible

39
New cards

igneous rock

intrusive (below surface) - granite, extrusive - basalt

40
New cards

sedimentary rock

limestone

41
New cards

metamorphic rock

recrystallization, marble

42
New cards

quarried stone

split or sawn to shape, dressed → face exposed, beds support stone, back concealed

43
New cards

engineered stone

composite of stone and polymer resin/cement

44
New cards

dry-stacked stone

carefully placed, no mortar or bonding

45
New cards

wet-laid stone

mortar to bind stones, often dressed stone

46
New cards

stone load-bearing wall

dressed stone faces and concealed rubble-and-mortar core

47
New cards

stone non-load bearing wall

stone infill

48
New cards

gabion walls

wire-mesh cage and stone infill, facade screens

49
New cards

stone cladding

adhered to surface with mortar or mechanical anchors

50
New cards

rainscreen system

ventilated cavity


51
New cards

self-bearing facade

vertically self-supporting


52
New cards

stone post and lintel

structural perimeter exoskeleton


53
New cards

stone arches and columns

stacked drums, aligned dowels - arches post-tensioned with steel

54
New cards

stone environmental performance

high thermal mass, very thick walls to provide insulation

55
New cards

stone environmental imapct

nonrenewable, reusable, can be downcycled

56
New cards

concrete

cementitious material (7-15%), water (14-21%), fine and coarse aggregate (60-75%), and air (up to 8%)

57
New cards

concrete aggregate

sand (fine), gravel, or crushed stone (coarse)

58
New cards

limestone

used to produce cement or clinker, provides calcium, quarried

59
New cards

cement production

reacts with water through hydration, energy and carbon intensive

60
New cards

water to cement ratio

less water, denser, stronger, less permeable - 0.5 ratio

61
New cards

concrete admixtures

slow or quicken curing or permeability such as acceletors, retardants, pigments

62
New cards

concrete reinforcement

steel bars, wires, or strands, requires protection from corrosion and rust


63
New cards

rebar

#number corresponds to diamter, no.5 → 5/8”, wire mesh, rebar ties


64
New cards

concrete forming

in situ or offsite, prefabricated/precast, formwork

65
New cards

concrete foundations

shallow, as pictured, deep, piles and shafts below shallow

66
New cards

concrete beam section


67
New cards

concrete beam rebar


68
New cards

concrete two way flat plate



69
New cards

concrete two way waffle slab


70
New cards

concrete shoring


71
New cards

concrete columns


72
New cards

concrete walls


73
New cards

wall forms


74
New cards

form ties


75
New cards

tie holes


76
New cards

concrete surfacing

exposed aggregate, formwork impressions, formliners, smooth finishes OR sprayed shotcrete

77
New cards

straw bale

fire resistant, byproduct of grain

78
New cards

straw non load bearing

structural frame, serves as insulation


79
New cards

straw load bearing “nebraska style”

compacted


80
New cards

exposed straw

vulnerable to deterioration or insects, often plastered

81
New cards

bamboo

grasses, culms, harvested every 3-5 years

82
New cards

bamboo section


83
New cards

bamboo treatment

preservatives, steaming, smoked

84
New cards

bamboo properties

high longitudinal tensile strength relative to weight, great seismic performance

85
New cards

bamboo geometries

bundled, arched geometries → bamboo sports hall

86
New cards

bamboo post and beam

steel strucure, outlined with bamboo, cement grout fills bamboo culms

87
New cards

bamboo environmental impact


88
New cards

deforestation

forest harvested and land put to other uses, also forest degradation → forest certification

89
New cards

anisotropic

different properties according to parallel or perpendicular nature to grain

90
New cards

wood properties

decay, combustible, mechanical agents and chemical acids

91
New cards

softwoods

pine, fir, hemlock, spruce, and cedar, general construction

92
New cards

hardwoods

oak, maple, cherry, walnut, poplar, flooring and furniture

93
New cards

wood cutting


94
New cards

wood drying

hygroscopic → seasoned, maintained at fiber-saturation point

95
New cards

log construction

stacked and attached with notches

96
New cards

cordwood and roundwood

poles or stacked, round edge face

97
New cards

heavy timber

solid-sawn or engineered, 5 inches or greater

98
New cards

final wooden house sou fujimuto


99
New cards

dimensional lumber

2×4 or 1.5×3.5

100
New cards

wood grading