1
New cards

System

An aggregation of system elements & enabling system elements that achieves a given purpose or provides a needed capability

2
New cards

System Elements

Configuration items, subsystems, segments, components, assemblies, & parts

3
New cards

Enabling System Elements

Provide means for delivering a capability into service. (Hardware, software, people, data, processes, facilities, & tools)

4
New cards

Standard

Establishes uniform engineering or technical criteria, method as, processes, & practices (MIL-STD-962)

5
New cards

Specification

Describes essential technical requirements,ents for material & the criteria for determining whether those requirements are met (MIL-STD-961)

6
New cards

Systems Engineering

Design & management of a total system that includes hardware, software & interoperability

7
New cards

Science & Technology

Demonstrates new & emerging technologies that have a direct application to military systems

8
New cards

Test & Evaluation

Compares a system or components against requirements & specifications through testing

9
New cards

Developmental Test & Evaluation

An engineering tool used to verify that the system meets design specifications

10
New cards

Operational Test & Evaluation

Performed by typical users of a system under realistic operational conditions to validate that the system meets user requirements

11
New cards

Life Cycle Logistics (LCL)

A multifunctional, technical management discipline associated with the entire life cycle of a system; integral part of system’s design requirements. Infrastructure elements necessary for the initial fielding & operational support of the system

12
New cards

Production, Quality & Manufacturing (PQM)

To ensure the producibility of the system design. Ease of manufacturing an item or system. Reduces both schedule & cost risks

13
New cards

Hardware/Software Engineering

The application of systematic, disciplined, quantifiable approach to the development, operation, & maintenance of hardware & software (all activities performed to support the translation of a user need into a product)

14
New cards

Define the design

GOV: Establishes system-level performance thresholds & objectives

KTR: Allocates system-level performance thresholds & objectives to subsystems & lower level design specifications

15
New cards

Monitor the design

GOV: Monitors program technical progress through IPTs, technical reviews, & periodic program reviews

KTR: Manages & integrates technical design progress using internal management standards

16
New cards

Assure design quality

GOV: Verifies contractor performance through review & approval of contractor technical deliverables

KTR: Validates internal & subcontractor technical performance through established quality-control standards

17
New cards

Test the design

GOV: Verifies system performance through conduct of development or operational testing

KTR: Verifies component/system performance through internal testing & participation in Government developmental testing

18
New cards

Federally Funded Research & Development Centers (FFRDC)

Part of a “three-legged stool” that drives innovation & problem solving for Government agencies by conducting research, technology development, system acquisition, & policy guidance; 70% or more of it financial support from government

19
New cards

Government Innovation & Problem Solving

“Three-Legged Stool” Commercial Industry, Government Employees, & Academic & Non-Profit Organizations

20
New cards

Basic Research

Funds are used for scientific study & experimentation (tends to take longer)

21
New cards

Applied Research

Funds pay for projects that apply Basic Research finding to real-world problems to get generate & test new technologies with potential military utility (includes studies, developing subsystems, & establishing the feasibility proposed solutions

22
New cards

Advanced Technology Demonstration (ATD)

Funds are used to demonstrate the military utility of completed applied research projects. (Demonstrates the feasibility & maturity of new technologies & reduces technical risk)

23
New cards

Systems Engineering Plan (SEP)

“Who, what, when, why & how”, Program organization with roles & responsibilities authority, accountability & staffing resources (Assists PMs in communicating & managing the overall SE approach that guides all technical activities)

24
New cards

Preliminary Design Review (PDR)

Takes place in the TMRR phase; must be completed prior to Milestone B & contract award for the EMD Phase (confirms allocated baseline & readiness)

25
New cards

Critical Design Review (CDR)

Takes place during the EMD phase; confirms the initial product baseline & detailed design

26
New cards

Alternative System Review (ASR)

An assessment to ensure that the resulting set of technical requirements agrees with the users’ needs & expectation; proceed into TMRR phase

27
New cards

System Requirements Review (SRR)

Ascertains progress in defining system technical requirements & ensures the Government & the contractors have communicated clearly & have mutual understanding of the requirements

28
New cards

System Funtional Review (SFR)

A formal review of the conceptual design that establishes the functional baseline & ensures the system under review can proceed into preliminary design

29
New cards

Test Readiness Review (TRR)

Happens prior to major test events or phases to ensure all planning, equipment, support assets & personnel are ready for the testing

30
New cards

Functional Configuration Audit (FCA)

Examines the functional characteristics of the configured product & verifies that product has met, via test results, the requirements specified in its functional baseline documentation approved at the PDR & CDR

31
New cards

System Verification Review (SVR)

Verifies final product performance ; audit train from CDR

32
New cards

Production Readiness Review (PRR)

An examination to determine if the design is ready for production & there is adequate production planning that has not incurred unacceptable risk

33
New cards

Physical Configuration Audit (PCA)

“Physical Hands-On” audit that verifies the product is consistent with all baseline documentation

34
New cards
35
New cards

Technical Processes

The order in which the eight Technical Processes are applied form the “V” shape of the Systems Engineering model

36
New cards

Stakeholder Requirements Definition process

The lead Service, Component, or designated program office receives requirements from relevant stakeholders & translates them into a set of technical requirements

37
New cards

Requirements Analysis Process

Involves the decomposition of user needs into clear, achievable, & verifiable high-level requirements & system functions

38
New cards

Architecture Design Process

A process that allows the Program Manager & Systems Engineer to translate the outputs of the Stakeholder requirements Definition & Requirements Analysis processes into alternative design solutions & establishes the architectural design of candidate solutions that may be found in a system model

39
New cards

Implementation Process

Takes detailed requirements, interfaces & architecture & creates the actual system element needed to meet them

40
New cards

Integration Process

Systematically assemble lower-level system elements into successively higher-level system elements until the system itself emerges (essential to increasing system maturity & reduce risk)

41
New cards

Verification Process

Evidence that the system or system elements performs its intended functions & meet all performance requirements; Developmental Testing (DT) of the system

42
New cards

Validation Process

Provides objective evidence that the capability complies with stakeholder performance requirements in its intended operational environment (Is it the right solution to the problem?); Operational Testing (OT)

43
New cards

Transistion Process

The process applied to move any system element to the next level in the physical architecture. (Field the system to the user)

44
New cards

Technical Management Processes

Form a “tool kit” used to help manage, control, & provide balance in the execution of the eight Technical Processes

45
New cards

Modeling & Simulation (M&S)

Helps decision-makers without making a physical change to the system

46
New cards

Technical Performance Measures (TPM)

Documents the progress of high-risk, critical technical performance metrics over time by comparing values to expected values. (Signal strength/Weight)

47
New cards

Work Breakdown Structure (WBS)

Can identify processes & sub-components that are associated with each product

48
New cards

Commercial Item

Customarily used for non-governmental purposes & are offered for sale, lease, or license to the general public. (Maintenance, repair, training)

49
New cards

Commercially off-the-shelf (COTS)

Describes commercial items that have no modification.A commercial item sold in substantial quantities in the commercial marketplace & offered to the Government under a contract

50
New cards

Configuration Management

The means by which a design is controlled as it is transformed from a top=level concept into a detailed design

51
New cards

Functional Baseline

Highest-level; which includes the overall system specifications. (Mission & technical performance requirements)

52
New cards

Allocated Baseline

Defines design requirements for configuration items below the system level. (Item Performance specifications)

53
New cards

Product Baseline

Lowest Level; includes the design requirements that specify how to build the system; ‘build to’ - (Details of processes, procedures, & materials used in fabrication)

54
New cards

Open Systems Architecture

Uses standard design features & interfaces that are compatible with many other products

55
New cards

Human Systems Integration (HSI)

Critical in maintainability design & it directly affects MTTR. (Accessibility, Visibility, Testability, & Standardization)

56
New cards

Accessibility

Can the part be easily reached for repair?

57
New cards

Visibility

Can the part being worked on be easily seen?

58
New cards

Testability

Can faults be easily detected?

59
New cards

Standardization

Are the parts interchangeable & can standard tools be used?

60
New cards

Affordable System Operational Effectiveness (ASOE)

The composite of performance, availability, process efficiency & Life Cycle Cost (LCC); influences early design

61
New cards

System Design for Operational Effectiveness (SDOE)

Focuses on the impact of reliability & maintainability design parameter & their role in operational effectiveness & suitability requirements

62
New cards

Supply Chain Model

Focuses on the logistics activities that enable effective sustainment

63
New cards

Operational Software Architecture Design

Identifies Warefighter Information Needs

64
New cards

Technical Software Architecture Design

Identifies Hardware & Software Interaction

65
New cards

Systems Software Architecture Design

Physical Structure Information Flows

66
New cards
67
New cards

Waterfall Paradigm

Implemented using a sequential process; each stage is a prerequisite for succeeding activities

68
New cards

Spiral Model

A risk-driven prototyping approach to software development

69
New cards

Incremental Paradigm

Involves developing “pieces” of the software for a system in a series of incremental steps

70
New cards

Agile Development Paradigm

Focuses on rapid, iterative development & delivery of software with active user engagements

71
New cards

Software Resilience

The ability to prepare for & adapt to changing conditions. Ability to withstand & recover from deliberate attacks, accidents, or naturally occurring threats & incidents occurring threats & incidents

72
New cards

Development Process Protections

Threat assessment & modeling, Secure design & costing standards, Static analysis & coding inspections to enforce coding standards

73
New cards

Operational System Protections

Failover multiply supplier redundancy, Fault isolation, Least Privilege, System element isolation, Input checking/validation

74
New cards

DevSecOps

People, Process, & Tools; focuses on rapid iterative development teams, & active user engagement

75
New cards

Cloud Computiing

A foundational enabler to modern software practices, like DevSecOps (scalability, flexibility, & automation capabilities)

76
New cards

Digital Acquisition

An integrated digital approach that uses authoritative sources of system, data, & models to support life cycle activities form concept through disposal. Enables efficient knowledge sharing & assessment of trade space

77
New cards

Digital Twin

An example of a model developed to create an accurate functioning virtual replica of a future system & test it under multiple scenarios

78
New cards

Capability Maturity Model Integration for Development (CMMI-DEV)

Provides guidance for managing, measuring & monitoring development processes

79
New cards

CMMI-SVC

Provides guidance for delivering services within organizations & external customers

80
New cards

CMMI-ACQ

Provides guidance to enable informed & decisive acquisition leadership

81
New cards

Lean Manufacturing

Aims to make efficient use of materials, minimize waste, increase responsiveness to change & stabilize process control

82
New cards

Statistical Process Control

Techniques reduce variability, improve performance & decrease costs

83
New cards

Special Variation

The result of a unique, such as a lightening strike

84
New cards

Common Variation

The operation of a machine results in random vibrations, which are an inherent part of the process

85
New cards

The 5Ms

Machinery, manpower, Material, Measurement, & Method

86
New cards

Test

Program, procedure, or process to obtain, verify, or provide data for determining the degree to which the system meets, exceeds, or fails to meet its stated capabilities

87
New cards

Evaluate

review, analysis 7 assessment of data obtained form testing used to project system performance under operational conditions

88
New cards

Thresholds

Minimum acceptable value to the user supported by analysis for a system capability. Anything less than the threshold may not satisfy the mission need

89
New cards

Objective

Desired value “better” than the threshold that results in an operationally meaningful, cost-effective & affordable improvement in capability

90
New cards

Test & Evaluation Master Plan (TEMP)

Documents the test management plan & framework within which detailed Test & Evaluation (T&E) plans are contained

91
New cards

Critical Technical Parameters (CTP)

Are the engineering design factors that a system must meet or exceed to ensure that established performance thresholds are achieved

92
New cards

Critical Operational Issues (COIs)

Top-level issues that must be examined in OT&E to determine the system’s capability to perform its mission. Part III in TEMP. Effectiveness & Suitability

93
New cards

Measures of Effectiveness & Suitability (MOEs & MOSs)

Derived from the Critical Operational Issues (COI) developed in Operational Test & Evaluation plans & planning processes

94
New cards

Life Cycle Sustainment

A highly supportable system by integrating sustainment considerations into planning, implementation, management & oversight

95
New cards

Product Support Manager (PSM)

Focuses on identifying, developing, implementing, incentivizing & measuring quantifiable best value outcome-based product support solutions that optimize Life Cycle Costs (LLC) & readiness

96
New cards

Life Cycle Sustainment Plan (LCSP)

A living document describing the approach & resources necessary to develop & integrate sustainment into the systems design development, testing, deployment & sustainment phases

97
New cards

Reliability


The probability that an item can perform its intended function for a specified interval under the stated conditions

98
New cards

Maintainability

The measure of an items ability to be retained in or restored to a specified condition when maintenance is performed by skilled personnel using the correct procedures & resources

99
New cards

Availability

A measure of the degree to which an item is in the operable & committable state at the start of a mission when the mission is called for at an unknown (random) time

100
New cards

Operational Availability

The portion of time the item or system is available to perform its mission considering the three critical factors of reliability, maintainability, & supportability