1/11
Looks like no tags are added yet.
MATERIALS PRICE VARIANCE
= (AP – SP) x AQ
= ACTUAL TOTAL MATERIAL COST – FLEXIBLE, BUDGET ALLOWED
MATERIALS QUANTITY VARIANCE
= (AQ – SQ) x SP
= FLEXIBLE BUDGET – STATIC BUDGET
LABOR RATE VARIANCE
= (AR – SR) x AH
= ACTUAL TOTAL PAYROLL – FLEXIBLE BUDGET ALLOWED
LABOR EFFICIENCY VARIANCE
= (AH – SH) x SR
= FLEXIBLE BUDGET – STATIC BUDGET
MIX VARIANCE
= (AMIX% – SMIX%) x TOTAL ACTUAL CONSUMPTION x STD RATE
YIELD VARIANCE
= (TOTAL ACTUAL CONSUMPTION – TOTAL STANDARD CONSUMPTION) x SMIX% x STD RATE
VARIABLE SPENDING VARIANCE
= (AR x AH) – (SR x AH)
= ACTUAL TOTAL VARIABLE OVERHEAD / FLEXIBLE, BUDGET ALLOWED OR STANDARD VARIABLE RATE x ACTUAL HOURS
VARIABLE OVERHEAD EFFICIENCY VARIANCE
= BAAH – BASH
= (AH – SH) x STANDARD VARIABLE OVERHEAD RATE
= FLEXIBLE BUDGET – STATIC BUDGET
FIXED SPENDING VARIANCE
= ACTUAL TOTAL OVERHEAD – BUDGETED FIXED OVERHEAD
FIXED OVERHEAD VOLUME/CAPACITY VARIANCE
= BASH – STD OH
= (BH – SH) x STANDARD FIXED OVERHEAD RATE
= BUDGETED FIXED OVERHEAD – STANDARD FIXED OVERHEAD
SPENDING VARIANCE
= VARIABLE SPENDING + FIXED SPENDING
CONTROLLABLE VARIANCE
= VARIABLE SPENDING + FIXED SPENDING + VARIABLE EFFICIENCY