Vocabulary practice flashcards covering watershed hydrology, open channel and pipe flow equations, regulatory frameworks (NPDES, CWA, TDEC), and Low Impact Development (LID) design concepts.

34 Terms

1
New cards

What is the definition of a “watershed”?

An area where all surface runoff drains to a certain outlet.

2
New cards

How do the runoff rate per unit area and runoff volume per unit area generally change as the watershed area increases?

Runoff rate per area decreases as watershed area increases.

Runoff volume per unit area increases as area increases. This is dependent on infiltration and storage

3
New cards

What are some cases in which the watershed area may be very hard to define?

Where there might be underground drainage, urban storm drains, or areas where water crosses the natural watershed boundary.

4
New cards

Know the component of a storm hydrograph inducing the axes.  Indicate 3 things (pieces of information) about the storm hydrograph we are generally most interested in.

A storm hydrograph is a graph showing how a river's discharge (volume of water flowing per second) and rainfall change over time before, during, and after a storm.
X-axis is time, Y axis is precipitation/discharge. We are interested in peak discharge, lag time (is it flashy?), and total runoff volume.

5
New cards

Initial Abstraction (IaI_a)

The surface wetting, infiltration, surface depression storage, and slowing by vegetation that must occur before runoff can begin.

6
New cards

Why does runoff not begin immediately with the beginning of rainfall?

Rainfall first needs to infiltrate the soil and become saturated, then the excess water that is unable to infiltrate will remain on the surface and become runoff. Initial abstraction is the threshold after which runoff begins.

7
New cards

Define time of concentration

The time required for surface runoff to travel from the hydraulically most distant point of the watershed to its outlet or design feature, representing the time at which the entire watershed contributes to runoff.

8
New cards

Design Storm

A hypothetical rainfall depth on which runoff estimation is based, determined by duration and return period.

9
New cards

SCS Direct Runoff Method

Also called the Curve Number Method, it is a method for estimating runoff volume using precipitation depth (PP) and Curve Number (CNCN) as inputs.

10
New cards

Potential Retention (SS)

The potential storage or retention capacity of the watershed in the SCS method, calculated as S=1000CN−10S = \frac{1000}{CN} - 10.

11
New cards

Rational Method

A peak runoff rate estimation method calculated as q=CiAq = CiA, where CC is the runoff coefficient, ii is rainfall intensity in inches per hour, and AA is watershed area in acres.

12
New cards

TR55 Method

A runoff estimation method that adds temporary water storage in ponds and swamps along with watershed timing and time of concentration to adjust the peak runoff rate using the formula Qp=qu×A×Q×FpQ_p = q_u \times A \times Q \times F_p.

13
New cards

Frequency Method

A mostly empirical method of runoff estimation based on regression analysis of large datasets.

14
New cards

Effective Rainfall

The amount of precipitation remaining after initial losses such as infiltration, interception, and storage, which contributes directly to runoff.

15
New cards

Hydraulic Radius (RR)

The ratio of the cross-sectional flow area to the wetted perimeter (R=APR = \frac{A}{P}), indicating how much perimeter the water is touching.

16
New cards

Manning's Equation

An open channel flow equation expressed as V=1.49n×R2/3×S1/2V = \frac{1.49}{n} \times R^{2/3} \times S^{1/2}, where VV is velocity in FPS, nn is Manning's roughness coefficient, RR is hydraulic radius, and SS is channel grade or slope in ft/ft.

17
New cards

Continuity Equation

The hydraulic equation expressed as V=qAV = \frac{q}{A}, which must be solved simultaneously with Manning's equation within 10%10\% when designing a channel.

18
New cards

Riprap

Rock protection placed in channels or at outlets to slow down high-velocity water and prevent erosion or scour.

19
New cards

Weir

The least restrictive type of stormwater outlet structure with flow depth, particularly over a shallow range of water depths.

20
New cards

Commerce Clause

The provision of the U.S. Constitution considered the legal basis granting the federal government authority to regulate water pollutants in states due to congressional control over interstate waterways.

21
New cards

Rivers and Harbors Act of 1899

Legislation that makes it a misdemeanor to alter the condition of any port, harbor, channel, or stream without a permit.

22
New cards

Federal Water Pollution Control Act of 1972

The original name of the federal statute from which the Clean Water Act was born.

23
New cards

NPDES

National Pollutant Discharge Elimination System; a regulatory program that requires stormwater discharge permits for construction sites disturbing over 1 acre1\text{ acre}.

24
New cards

SWPPP

Storm Water Pollution Prevention Plan; a required site plan for controlling stormwater discharges and contaminants on construction sites.

25
New cards

ARAP

Aquatic Resource Alteration Permit.

26
New cards

TDEC

Tennessee Department of Environmental Conservation; the state agency to which the EPA issues permits and which oversees site coverages for construction in Tennessee.

27
New cards

Notice of Coverage (NOC)

The permit authorization issued to a site after a Notice of Intent has been filed and the SWPPP is approved.

28
New cards

Notice of Termination (NOT)

The document that must be requested and officially received to end a site's regulatory coverage under a construction stormwater permit.

29
New cards

MS4

Municipal Separate Storm Sewer System.

30
New cards

Total Suspended Solids (TSS)

Solid particles suspended in stormwater; sites unable to meet runoff reduction guidelines are mandated to achieve an 80%80\% removal goal for these solids.

31
New cards

Total Maximum Daily Loads (TMDLs)

Contaminant reduction standards mandated under the Clean Water Act for states to develop for impaired or contaminated waterways.

32
New cards

Low Impact Development (LID)

A stormwater management approach aimed at mimicking natural hydrology and managing cumulative annual rainfall primarily through infiltration, runoff reduction, and treatment.

33
New cards

Conveyance Practice

An LID drainage feature, such as a grassy swale or channel, that guides stormwater while allowing for infiltration during a storm event.

34
New cards

Capture and Reuse Practices

LID practices designed solely for runoff volume reduction that store water and must have a strong reuse demand to dewater and provide capacity for subsequent storms.