Comprehensive vocabulary flashcards covering Module 9 (Construction Fieldwork) and Module 11 (Construction Disputes) from the Civil Engineering Management and Practice course.

50 Terms

1
New cards

Construction Fieldwork

The physical on-site activities from mobilization to turnover combining labor, materials, equipment, and engineering expertise to build, modify, rehabilitate, and maintain structures.

2
New cards

Field Engineers

Civil engineers who act as the link between design documents and actual construction operations, supervising activities and verifying compliance with plans and specifications.

3
New cards

DPWH Standard Specifications (Blue Book)

A standard technical reference and specification document governing public works and infrastructure projects in the Philippine construction context.

4
New cards

Site Preparation and Mobilization

The initial major fieldwork stage that involves preparing the project area before actual construction begins to establish a safe, organized, and efficient working environment.

5
New cards

Site Clearing

The removal of vegetation, debris, existing structures, and other obstructions to create an open and workable project area.

6
New cards

Surveying and Layout

The process of establishing project boundaries, reference points, and elevations through land surveys and setting out works.

7
New cards

Earthworks and Grading

Excavation, filling, compaction, and grading operations carried out to achieve the desired site elevations and provide foundation stability.

8
New cards

Installation of Temporary Facilities

The setup of site offices, storage areas, access roads, fencing, and temporary utilities required to support construction operations.

9
New cards

Safety and Environmental Controls

Measures implemented on-site—including erosion control, drainage systems, and safety signage—to maintain safety and satisfy environmental regulations.

10
New cards

Foundation Works

Substructure construction activities designed to safely transfer structural loads from the building to the ground.

11
New cards

Soil Treatment

Compaction, stabilization, or replacement of unsuitable soil carried out to improve ground bearing capacity for foundations.

12
New cards

Formworks Installation

The installation of wooden or steel molds and the placement of reinforcing bars according to structural drawings.

13
New cards

Reinforce Placement

The positioning, arranging, and securing of reinforcing steel bars (rebar) in preparation for concrete casting.

14
New cards

Concrete Pouring

The process of mixing, placing, and curing concrete to create stable footings, pads, or piles.

15
New cards

Backfilling

The refilling and compacting of soil around foundation elements after the placed concrete has cured and set.

16
New cards

Structural Works

The construction stage that defines a building's strength, stability, and overall form, encompassing columns, beams, slabs, walls, and structural steel assemblies.

17
New cards

Roofing and Enclosure Works

Activities that shield the structure from weather and environmental exposure, including roof framing, roofing, waterproofing, exterior walls, windows, and doors.

18
New cards

Utilities and Services Installation

The installation phase that provides functional operation to buildings, including plumbing, electrical, mechanical, fire protection, and communication systems.

19
New cards

Plumbing Works

The installation of pipes, fittings, water supply lines, and drainage networks within a facility.

20
New cards

Electrical Works

The installation of wiring, conduit laying, panel boards, and lighting systems throughout a structure.

21
New cards

Mechanical Systems

Building utility components comprising ventilation, air conditioning (HVAC), elevators, and mechanical fire systems.

22
New cards

Fire Protection Systems

Life safety systems including fire detection and alarms, automatic sprinklers, standpipes, fire hose cabinets, and related firefighting equipment.

23
New cards

Finishing Works

On-site trades including plastering, tiling, painting, drywall, and cabinetry that enhance the functionality, appearance, and durability of a structure.

24
New cards

Inspection

The quality process of checking materials, workmanship, dimensions, and compliance against approved project plans and specifications.

25
New cards

Material Testing

Testing concrete, steel, aggregates, and other construction materials to verify their quality, strength, and compliance with standards.

26
New cards

Soil Testing

Testing soil properties such as compaction, bearing capacity, and density to ensure foundation stability.

27
New cards

Workmanship Inspection

Verifying the correct installation, alignment, and finish quality of all completed construction trades.

28
New cards

Structural Inspection

The formal evaluation of structural elements such as footings, columns, beams, and slabs for defects and design compliance.

29
New cards

Site Clean-up and Demobilization

The final stage of fieldwork that clears debris, disposes of waste, dismantles temporary structures, and cleans the facility to prepare for turnover.

30
New cards

Demobilization of Equipment

The removal and transport of construction equipment, machinery, and tools away from the job site at project closeout.

31
New cards

Site Restoration

Restoring affected work areas, regrading ground, and returning the surrounding site to an acceptable physical condition after construction finishes.

32
New cards

Labor Shortages

A field operational challenge wherein a deficit of skilled workers reduces construction productivity and compromises installation quality.

33
New cards

Construction Disputes

Disagreements between project parties concerning their rights, obligations, responsibilities, or expectations under a construction contract.

34
New cards

Republic Act No. 9285

The Alternative Dispute Resolution Act of 2004, a Philippine law approved on April 2, 2004, institutionalizing ADR to promote speedy and efficient dispute resolution outside courts.

35
New cards

Executive Order No. 1008

The Construction Industry Arbitration Law, which established the Construction Industry Arbitration Commission (CIAC) in the Philippines.

36
New cards

Contractual Issues

Disputes originating from poorly drafted contracts, ambiguous provisions, or differing interpretations of contractual requirements and scopes of work.

37
New cards

Delay Claims

Common construction disputes arising from schedule slippages caused by material delivery, payments, other contractors, weather, or design revisions.

38
New cards

Payment Disputes

Disagreements concerning compensation for completed work, such as delayed progress billings, non-payment, retention money releases, or unapproved variation orders.

39
New cards

Quality and Workmanship Issues

Disputes that arise when owners assert that completed work fails to meet contract plans, specifications, or quality standards.

40
New cards

Change Order

A formal modification that involves additions, deletions, or revisions within the original scope of a construction contract.

41
New cards

Extra Work

Construction activities performed entirely outside the original contract scope that generally require additional compensation and schedule adjustments.

42
New cards

Proper Contract Administration

Strict compliance with contractual terms, administrative procedures, and documentation to minimize misunderstandings and prevent disputes.

43
New cards

Alternative Dispute Resolution (ADR)

A legally supported framework under RA 9285 enabling parties to settle disputes speedier, impartially, and more flexibly without a full court trial.

44
New cards

Negotiation

The simplest and most common dispute resolution method, providing a direct, fast, flexible, and cost-effective settlement between parties without a third party.

45
New cards

Mediation and Conciliation

A dispute resolution method where a neutral third party facilitates discussions to help parties reach a voluntary settlement without imposing a decision.

46
New cards

Arbitration

A dispute resolution process where a neutral arbitrator or panel hears evidence and renders a formal decision that is generally binding on the parties.

47
New cards

Construction Industry Arbitration Commission (CIAC)

The primary arbitration body for construction disputes in the Philippines, created under Executive Order No. 1008.

48
New cards

Litigation

Formal judicial court proceedings, typically treated as a last resort in construction disputes due to high costs, public nature, and prolonged duration.

49
New cards

Monetary Damages

Financial compensation paid to an aggrieved party for losses, delays, extra project costs, or liquidated damages caused by another party's breach of contract.

50
New cards

Specific Performance

A legal remedy where a court or arbitral tribunal orders a defaulting party to carry out their contractual obligations rather than merely paying compensation.