Systems Analysis and Design (SAD 2026) Study Guide

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/45

flashcard set

Earn XP

Description and Tags

Flashcards covering core terminology, concepts, testing types, artifacts, and life cycle methodologies from the SAD 2026 lecture.

46 Terms

1
New cards

System

A group of interconnected components that work together to achieve a specific or common goal.

2
New cards

IPO Model

The basic systems model where Input enters, Process transforms it, and Output is the resulting product or service.

3
New cards

Feedback

Information used to evaluate or improve the performance of a system.

4
New cards

Control

The rules or mechanisms that keep a system operating properly.

5
New cards

Information System (IS)

A system combining people, processes, data, and technology to collect, process, store, and provide information.

6
New cards

Systems Analysis

The phase that investigates the current situation, identifies user needs, and determines what is needed ("WHAT is needed?").

7
New cards

System Design

The phase that plans the proposed solution, defining features, data structures, interface, architecture, and security ("HOW will it work?").

8
New cards

Subsystem

A smaller system that is part of a larger system, having its own functions while contributing to the larger system's goal.

9
New cards

System Decomposition

The process of breaking a complex system down into smaller subsystems to make it easier to understand and manage.

10
New cards

Systems Thinking

An approach that looks at the whole system, how components interact, how information flows, and how a change or failure in one part affects others.

11
New cards

System Environment

Everything outside the system that can influence or be influenced by it.

12
New cards

System Boundary

The perimeter that defines what is inside and what is outside the system being studied.

13
New cards

Open System

A system that actively interacts with its external environment.

14
New cards

Closed System

A system that has little or no interaction with its external environment.

15
New cards

Data

Raw facts that have not yet been processed.

16
New cards

Information

Processed or organized data that has meaning and can support decision-making.

17
New cards

Transaction Processing System (TPS)

An information system that records routine, day-to-day business transactions.

18
New cards

Management Information System (MIS)

An information system that provides managers with structured reports to monitor and manage operations.

19
New cards

Decision Support System (DSS)

An information system that analyzes data, models, and scenarios (e.g., what-if analysis) to support decision-making.

20
New cards

Executive Information System (EIS)

An information system that supplies summarized information, market trends, and key performance indicators (KPIs) for senior and strategic decisions.

21
New cards

Enterprise Resource Planning (ERP)

A software system that integrates various core business functions (such as sales, inventory, finance, and HR) into a unified system.

22
New cards

Customer Relationship Management (CRM)

An information system designed to manage and organize interactions, purchases, complaints, and preferences regarding customers.

23
New cards

System Development Life Cycle (SDLC)

A structured process for developing and maintaining an information system through planning, analysis, design, development, testing, implementation, and maintenance.

24
New cards

Functional Requirement

A statement specifying what the system must do (e.g., register a student, record payments).

25
New cards

Non-functional Requirement

A statement specifying how well the system must perform (e.g., speed, security, usability, availability).

26
New cards

Unit Testing

A testing activity that verifies the functionality of an individual component or function.

27
New cards

Integration Testing

A testing activity that evaluates whether separate components work together properly.

28
New cards

System Testing

A testing activity that checks the complete, end-to-end operation of the entire system.

29
New cards

User Acceptance Testing (UAT)

A testing activity where end users evaluate whether the system satisfies their operational requirements and is acceptable for production use.

30
New cards

Waterfall Model

A sequential SDLC methodology where phases follow in order and requirements are planned upfront, best suited for stable, well-understood requirements.

31
New cards

Agile Model

An iterative and incremental SDLC methodology characterized by short delivery cycles, frequent user feedback, and high adaptability to changing requirements.

32
New cards

Spiral Model

An SDLC methodology where development advances through iterative cycles with an explicit, heavy emphasis on risk analysis.

33
New cards

Data Flow Diagram (DFD)

A system design artifact that illustrates how data moves among external entities, processes, and data stores.

34
New cards

Use Case Diagram

A design diagram that shows the users or actors and the specific functions they execute with the system.

35
New cards

Entity Relationship Diagram (ERD)

A design diagram depicting data entities and the relationships among them within a database.

36
New cards

Prototype

An early, working model or preview version used to demonstrate, explore, and test a proposed system before full development.

37
New cards

System Project Initiation

The preliminary stage where an organization identifies a business need or problem and determines whether a project is justified and worth investigating.

38
New cards

5 Whys

A root-cause analysis technique that involves asking "Why?" repeatedly to uncover the foundational cause of a problem.

39
New cards

Fishbone Diagram

A root-cause analysis tool that visualizes and categorizes possible causes of a problem under categories such as people, process, technology, data, and environment.

40
New cards

Stakeholders

Individuals or groups who affect, fund, approve, build, operate, or are affected by a project.

41
New cards

Scope Creep

The uncontrolled, unapproved growth or expansion of a project beyond its agreed-upon scope boundaries.

42
New cards

Constraint

A fixed boundary or restriction placed on a project, such as limitations on budget, schedule, staffing, or policy.

43
New cards

Assumption

A factor or condition temporarily considered to be true during planning that still requires verification.

44
New cards

Risk

An uncertain event or condition that, if it occurs, can have a positive or negative impact on project objectives.

45
New cards

Business Case

A foundational document explaining why a project should be considered, summarizing the problem, strategic alignment, preliminary costs, feasibility, and expected benefits.

46
New cards

Project Charter

A formal document (or initiation brief) recording the preliminary direction, justification, scope, stakeholders, and SMART objectives of a project prior to detailed analysis.