What are the three requirements for contract formation?
Offer, acceptance, and consideration. Also requires mutual assent and sufficiently definite essential terms.
What is consideration?
Something of legal value exchanged for a promise, such as money services, or giving up a legal right.
Material vs. Immaterial Breach?
Material: Serious enough to potentially excuse further performance. Immaterial: minor breach; other party generally must continue performing but may recover damages.
What is the implied duty of good faith?
Contracting parties cannot opportunistically deprive each other of the benefits of their agreement
What is promissory estoppel?
A promise inducing reasonable, detrimental reliance that may justify relief to avoid injustice even without an enforcable contract
Quantum Meruit vs. unjust enrichment?
Quantum Meruit: reasonable value of services. Unjust enrichment: Restitution for benefits unjustly retained
Mediation vs. Arbitration
Mediation: Neutral helps negotiate a voluntary settlement. Arbitration: Arbitrator makes a generally binding decision
What are the four elements of negligence
Duty, breach, causation, and damages
What is the professional standard of care?
The reasonable skill, care, and judgement expected of similarly situated qualified professionals
Express vs. Implied vs. apparent Authority?
Express: directly granted. Implied: Reasonably necessary to fulfill assigned duties. Apparent: Reasonably perceived by third parties based on the principal’s conduct
What is vicarious liability?
Legal responsibility for certain actions of another person, such as an employer’s liability for employee torts within the scope of employment
Direct vs consequential vs. punitive damages?
Direct: Immediate losses. Consequential: Additional loses arising from particular circumstances. Punitive: Punishment and deterrence for qualifying misconduct
What is the Economic loss doctrine?
A doctrine that generally directs certain claims for disappointed economic expectations toward contract remedies instead of tort remedies.
What is Design-bid-build?
The owner contracts separately with the architect/engineer and contractor.
What is Design-Build?
The owner contracts with one design-builder responsible for both design and construction
What is fast-track Construction?
Construction begins before the entire design is completed, creating potential coordination and change risks.
What is multi-prime contracting?
The owner holds separate contracts with multiple prime contractors, creating additional coordination responsibilities.
What is the Spearin doctrine?
The owner impliedly warrants that detailed design specifications will produce satisfactory results if properly followed. Implied warranty primarily concerns detailed design specifications, not every performance requirement.
What is the main legal risk of multi-prime contracting
Disputes about which party is responsible for coordination, interference, and delays between contractors
What is a change order?
An authorized modification to original contract requirements, potentially adjusting cost and time
What is a cardinal change?
A change so fundamental that it goes beyond the scope of the original contractual bargain
What is an equitable adjustment
An appropriate adjustment in contract price or time to account for a qualifying change
What is the Measured Mile Method
Comparing productivity during impacted work with productivity during comparable, unfaffected work to estimate lost efficiency
What is a sole proprietorship?
A business with no separate legal identity from its owner'; the owner generally has personal liability
Corporation vs LLC?
Both generally provide limited owner liability. They differ in ownership structure, formalities, and potential tax purposes.
General partnerships vs. limited partnerships vs. LLP?
General partners generally have personal liability; limited partnerships protect qualifying limited partners; LLPs protect partners from many entity liabilities.
What is piercing the corporate veil?
Exceptionally holding owners personally liable when the entity’s separate legal status is improperly abused.
What are the fiduciary duties and the business judgement rule?
fiduciary duties require loyalty and care. The business judgement rule generally protects informed, good-faith business decisions from liability merely because they porn out poorly.
Design vs performance specifications?
Design specs prescribe how to perform work. Performance specs establish required results while allowing the contractor to select methods
What are differing site conditions?
Materially different physical conditions encountered during work that may justify contractual relief if the governing requirements are satisfied
What is a constructive change claim?
A claim that the owner or authorized representative effectively required work outside the contract without a formal modification
What is the superior knowledge doctrine?
The government may breach its contractual duty by failing to disclose vital information unavailable to and not reasonably obtainable by the contractor. Information must be vital and that the government’s failure to disclose must meet the other requirements, including whether the contractor was misled.
When may a government bid mistake justify contract reformation?
In limited circumstances when the government knew or should have known of a significant mistake before accepting the bid.
How do contract and tort claims differ?
Contract: Violation of agreed obligations. Tort: Violation of a legal duty independent of the contract, subject to applicable limitations
What is required to form a contract
Offer, acceptance, consideration, define material terms, and object mutual assent
What is promissory estoppel in construction bidding?
A subcontractor’s bid may become enforceable when the prime contractor reasonably and foreseeably relies on it, depending on state law.
Patent vs. Latent ambiguity
Patent: Obvious inconsistency that generally triggers a pre-bid inquiry duty on federal work. Pre-bid inquiry is especially important for federal contracts. Latent: Hidden inconsistency not apparent on reasonable review
Direct vs Consequential damages?
Direct: Immediate losses, such as repair costs. Consequential: Secondary losses such as lost rent, subject to additional recovery requirements.
Type 1 vs Type 2 differing site conditions
Type 1: Actual conditions differ materially from those indicated in the contract. Type 2: Unusual, unkknown conditions differ materailly from those ordinarily expected for the work
Formal vs. Constructive Changes
Formal: Approved under the contract’s modification procedures. Constructive: Qualifying owner-directed extra work without a formal change document
What is apparent authority
Authority reasonably perceived by a third party based on the principal’s representations or conduct, not merely the agent’s own claims.
Impossibility vs commercial impracticability
Impossibility: Performance objectively cannot be accomplished. Impracticability: An unforseen contingency makes performance excessively and unreasonably difficult or costly, under demanding legal requirements.
What is the Statue of Frauds?
Certain contracts require a writing to be enforceable. Oral Contracts can still be valid, and exceptions may apply.
How do courts interpret ambiguous contract language?
Start with plain meaning, read the contract as a whole, and check order-of-precedence clauses. Unresolved ambiguity may be construed against the drafter.
What is the Parol Evidence Rule?
A final integrated written contract generally limits prior or contemporaneous outside agreements offered to contradict its terms, subject to exceptions.
What is substantial performance?
Performance fufilling the contract’s essential purpose despite minor defects; payment may still be recoverable with deductions.
What does “time is of the essence” mean?
Timely performance is a material contractual obligation. A specified completion date alone does not automatically establish this.
What must a contractor establish for a type 1 differing site condition?
Indicated condition, reasonable reliance, material difference, unforseeability despite reasonable investigation, and resulting cost or delay.
What is the purpose of a differing site conditions clause?
Indicated condition, reasonable reliance, material difference, unforseeability despite reasonable investigation, and resulting cost or delay.
What is the purpose of a differing site conditions clause?
Shifts specified unexpected subsurface risks away from contractors, reducing contingency pricing and allowing qualifying adjustments.
What duties does a contractor have when encountering unexpected site conditions?
Conduct reasonable pre-bid investigation, provide prompt contractual notice, preserve evidence, and demonstrate resulting costs or delays.
Who can authorize changes on federal construction projects?
The contracting officer or another duly authorized official. An unauthorized field representative generally cannot bind the government.
What must be proven for an equitable adjustment?
A qualifying change, proper authority and notice, causation, and documented additional costs or time.
When can a bidder obtain relief for a bid mistake?
Potentially for a demonstratable clerical or mathematical error, subject to prompt notice, convincing evidence, applicable rules, and government knowledge or verification.
Liquidated damages vs penalty?
Liquidated damages reasonably estimate difficult-to-measure loss. A punitive or unreasonably excessive amount may be unenforceable.
Binding vs. persuasive precedent
Binding must be followed by the relevant lower court. Persuasive may influence a decision but is not controlling.
When does UCC Article 2 apply?
Transactions in goods. For mixed goods/services contracts, courts often evaluate which predominates
Lump sum vs. unit price vs. GMP?
Lump Sum: Fixed overall price. Unit Price: Actual quantities multiplied by agreed rates. GMP: Maximum price, subject to contract adjustments.
What is the duty to mitigate.
An injured party must take reasonable steps to prevent avoidable additional losses.
What is economic waste?
Repair costs may be so disproportionate that diminished property value becomes the appropriate damages measure.
When are consequential Damages recoverable?
Generally when caused by breach, reasonably foreseeable at contract formation, sufficiently certain and not validly waived.
Responsive vs. responsible bidder?
Responsive: Bid complies with material solicitation requirements. Responsible: Bidder has qualifications and capacity to perform
What is a bid bond?
Security protecting the owner if the successful bidder fails to execute the contract or furnish required bonds.
Bid shopping vs bid chopping
Shopping: Soliciting lower competing prices after using a bid. Chopping: pressuring the selected bidder to reduce its price.
Can contractors automatically rely on every geotechnical report?
No. Contract incorporation, reliance provisions, disclaimers, and the DSC clause must be considered.
What is ratification?
A principal subsequently adopts or knowingly accepts an initially unauthorized transaction, potentially becoming bound by it.
How does the economic loss doctrine distinguish losses?
Purely economic losses involving the bargained-for product may be restricted to contract remedies; injury and damage to other property may receive different treatment
Negligent misrepresentation vs. tortious interference
Misrepresentation: Carelessly providing false information inducing reliance. Interference: Improper intentional disruption of another’s contractual or prospective business relationship.
Is an owner automatically liable for an independent contractor’s negligence?
Generally no. Exceptions may involve retained control, non delegable duties, negligent selection, or inherently dangerous work.
What is integrated project delivery.
A collaborative delivery approach involving early participation by key parties, shared risk/reward arrangements, and coordinated project goals.
What are the main features of envioronmental regulation?
Regulatory standards, permits, reporting and enforcement by federal, state, and local authorities.