1/69
Looks like no tags are added yet.
About what share of all U.S. electricity did data centers use in 2023?
About 4.4 %
Why do data centers worry grid engineers even though their national share of electricity is only a few percent?
The load is concentrated behind a few substations
In Ireland, data centers used about what share of the national electricity in 2025?
About 23 %
The 1999 claim that the Internet already used 8 % of U.S. electricity was later found to be about eight times too high.
True
As shown in the lecture, about how much power does a typical (non-AI) server rack draw today?
About 9 kW
An AI rack of 2024-2025 draws roughly how much power?
About 120-130 kW
What limits new AI data centers most, as shown in the lecture's thirty-year picture?
Megawatts and the time it takes to connect them
During the 2010s, U.S. data-center electricity use doubled about every two years.
False
Which measure do developers of AI campuses use today, instead of watts per square foot?
Megawatts per campus and the time to power
In the power path of a data center, what does a double-conversion UPS do?
Converts AC to DC, through a battery bus, and back to AC
At about what voltage does the GPU chip itself operate, after the voltage regulators on the board?
About 1 V
What is the main idea of the 800 V DC architecture announced for future AI racks?
Convert once to DC for the whole building, skipping steps
From the grid's side, the servers decide how many megawatts a data center takes, and the UPS decides what it does during a fault.
False
One AI rack draws about 120 kW. An average U.S. home uses about 1.2 kW on average. One rack equals about how many homes?
About 100 homes
In June 2026, about how much large-load demand had been requested in the ERCOT interconnection queue?
About 475 GW
About what share of those ERCOT large-load requests were data centers?
About 90 %
In October 2026, about how much large-load demand was actually running in ERCOT at its peak?
About 5 GW
What is the main message of the ERCOT 'funnel' from requested to running load?
Requested load differs from studied, approved or running load
A load of 100 MW equals the average demand of roughly 8,000 U.S. homes.
False
PUE (power usage effectiveness) of a data center is defined as:
Total facility power divided by IT power
A data center has 100 MW of IT load and a PUE of 1.3. How much power does it take from the grid?
130 MW
The industry-average PUE has kept falling quickly every year since 2018.
False
Why do racks above a few tens of kilowatts move from air cooling to liquid cooling?
A liter of water carries far more heat than a liter of air
Why does the cooling system matter to a power engineer?
Pumps, chillers and fans are motor loads that react to voltage dips
Of these four, which uses the MOST water each year in the United States?
Lawns and other outdoor use at homes
U.S. golf courses use roughly how many times more water than all U.S. data centers use on site?
About 30 times
Nationally, data centers are one of the largest water users in the United States.
False
Which design choice makes the biggest difference to how much water one data center uses?
Closed liquid loop versus evaporative cooling towers
About how much water does one evaporative 100 MW data center use per year, as shown in the lecture?
About 285 million gallons
Texas's last sugar mill, in the Rio Grande Valley, closed in 2024 because there was not enough irrigation water.
True
Which milk needs the most fresh water to produce, per liter?
Cow's milk
About how much fresh water does it take to make 1 liter of almond milk, from farm to carton?
About 371 liters
Most of the water behind almond milk is used in the factory that grinds and rinses the almonds.
False
Why do estimates of the water used for one chatbot answer differ by more than a thousand times?
Some count only on-site cooling, others add power-plant water
Even with the most pessimistic estimate shown in the lecture, one almond-milk latte takes more water than one chatbot answer.
True
Why can the popular figure '140 liters of water per cup of coffee' NOT be compared with a data center's cooling water?
It counts the rain falling on the coffee farms
How long are a data center's UPS batteries typically designed to carry the load?
Seconds to minutes, until the diesels start
What does '2N' redundancy mean in a data center?
All equipment is doubled, each module at most half loaded
What is the design goal of all the equipment 'inside the fence' of a data center?
The servers should never notice a problem on the grid
Which device automatically switches the load between the utility supply and the diesel generators?
The automatic transfer switch (ATS)
A Tier I data center is commonly quoted at only about 26 minutes of downtime per year.
False
What happened in Northern Virginia on 10 July 2024?
After a normal line fault, about 1,500 MW of data centers went to backup
When a large data-center load suddenly disconnects, what does the grid see first?
Frequency and voltage rise, so generators must back off
Why does a data center disconnect from the grid during a voltage dip?
Its UPS moves the servers to batteries and diesels
About how large was the data-center load loss in PJM on 22 July 2026, the largest so far?
About 3,800 MW
Ireland's new grid-code rule asks demand facilities such as data centers to:
Recover at least 90 % of their load within 500 ms after a fault
For a shallow voltage dip (above about 0.8-0.9 pu) a data center can stay connected; only deeper dips make it switch to its internal supply.
True
Why does the power of an AI training cluster swing up and down about once a second?
GPUs compute together, then pause together to exchange results
Which kind of AI workload is much smoother for the grid?
Inference: answering many users' questions
The rate of change of frequency after a power imbalance is RoCoF = f0 x dP / (2H). It becomes larger when:
The system inertia H is larger
In the lecture's simplified model of a low-inertia grid, what almost removed the frequency problem caused by AI power swings?
A large grid-forming battery
ERCOT's new rule PGRR 144 exempts large loads from ride-through tests because they are not generators.
False
What problem appears when many transformers are connected in parallel at a big data-center campus?
The fault current becomes very high
Which measure reduces a too-high fault current at a large campus?
Series reactors or high-impedance transformers
Texas asks for financial security of $50,000 per MW before an interconnection study. How much is that for a 1 GW request?
$50,000
In Texas, new large loads of 75 MW or more pay no fee for their interconnection study.
False
Texas's 2025 law SB 6 sets special rules for loads of at least:
75 MW
In ERCOT's 2026 survey of large loads, which topic was most often left unanswered?
How the site will be cooled
Most of the capacity in ERCOT's 2026 large-load survey was crypto mining.
False
About how many full-time people typically run a large (250,000 square feet) data-center building?
About 50
Where does most of a data center's CO2 come from?
The power plants that supply its electricity
Data-center jobs are mostly during construction; far fewer people are needed to run the finished building.
True
A data center buys enough solar energy over a year to match its use. Why can it still depend on gas?
At night solar produces nothing and the grid supplies the load
What does '24/7 carbon-free energy' mean?
Clean energy in every hour, not only on yearly average
The undamaged unit at Three Mile Island is being restarted to supply a technology company under a long-term contract.
True
Which of these large loads is the MOST flexible for the grid?
Bitcoin mining
Why is AI inference less flexible than AI training?
Users are waiting for the answers
About how much new load could fit into today's U.S. grids if it accepted curtailment about 0.25 % of the time?
About 76 GW
In field tests, AI computing clusters have cut their power by about 25-40 % for the grid without stopping their important jobs.
True
Inverter-based generators have a ride-through standard (IEEE 2800), but large loads have no equivalent standard yet.
True