1/107
Ch. 4, 9, & 10
traditional costing systems
direct materials and direct labor costs can be traced to specific jobs
in traditional costing systems
overhead costs are indirect and can’t easily be traced to jobs
in traditional costing systems, overhead costs are assigned to products/services based on
a single predetermined overhead rate
traditional overhead rate formula
estimated overhead / estimated activity base
traditional overhead rate creates less
correlation between direct labor and overhead
activity-based costing (ABC)
allocates overhead to multiple activity cost pools and assigns activity cost pools using appropriate cost driver
activity cost pools examples
materials purchasing, machine setup, maintenance
cost driver examples
number of purchase orders, setups, machine hours
what is the first step of ABC
identify activities used to make a product or service
what is the second step of ABC
determine cost of each activity and place in cost pools
what is the third step of ABC
identify cost driver of each cost pool
what is the fourth step of ABC
compute ABC overhead for each cost pool
what is the fifth step of ABC
assign overhead cost to products/services
what are the benefits of ABC
multiple cost pools lead to more accurate product costs, improves control of overhead costs, and results in bettter management decisions
what are the limitations of ABC
expensive to implement, more complex recordkeeping, and not all cost drivers have cause/effect relationship with activity
a company may benefit from ABC if product lines differ
in volume and complexity
a company may benefit from ABC if product lines are
numerous and diverse
a company may benefit from ABC if overcosts are
a major portion of total costs
a company may benefit from ABC if the manufacturing process or
number of products has changed significantly
a company may benefit from ABC if managers aren’t
using data from traditional system
what are the classification of activity levels
unit, batch, product, and facility
unit level
perform for each unit of production
batch level
performed every time a company produces another batch of products
product-level
performed every time a company produces a new type of product
facility-level
support/sustain entire production process
unit-level activity examples
machining (drilling and grinding), assembling products, packaging
batch-level activity examples
machine setups, moving materials from storeroom to assembly line or finished products from assembly line to finished goods storeroom, placing purchase orders for materials
product-level activity examples
product design, prototype and testing, engineering changes
facility-level activity examples
rent or depreciation of factory building, utilities, property taxes, insurance
value-added activities
essential to the company’s operations and increase perceived value of product or service to customers
non-value added activities
add cost and/or time without increasing value
value-added activity examples
assembling product (machining, drilling), packaging and shipping, design
nonvalue-added activity examples
moving materials and finished goods, downtime, inspection, fixing defective goods
budget
a formal written state of management’s plans for a specific future time period expressed in financial terms
what does a budget support and communicate
the management function of planning and objectives throughout the organization
what entities use budgets
businesses of all types, nonprofits, and governments
what are the benefits of budgeting
requires managers to plan, promotes communication and coordination, provides definite objectives for evaluation, creates greater awareness of overall operations, serves as an early warning sysyems, and provides incentives to employees
budgetary slack
managers intentionally understate expcted revenues or overstate expected expenses
spend it or lose it
fear of being under budget on expenses will cause loss of resources
master budget
set of budgeted financial statements and supporting schedules
what are the two types of master budgets
operating and financial
operating master budget
relates to sales and production
financial master budget
cash and capital expenditures
the sales budget is the starting point for
the master budget
if the sales budget is too optimistic,
it can result in excessive inventory
if the sales budget is too pessimistic,
it can result in lost sales due to lack of inventory
sales budget
forecast of sales revenue
production budget formula
budgeted unit sales + desired units in ending inventory = units needed - units in beginning inventory
direct materials budget formula
budgeted production x DM per unit = DM needed for production + desired DM in ending inventory = total DM needed - DM in beginning inventory = budgeted DM needed x price per unit of DM = budgeted DM cost
direct labor budget formula
budgeted production x DL hours per unit = DL hours needed for production x DL cost per hour = budgeted DL cost
variable overhead budget formula
indirect materials + indirect labor + other variable MOH
fixed overhead budget formula
supervisory salaries + depreciation + other fixed overhead
MOH budget formula
total variable MOH + total fixed MOH
selling and admin expense budget formula
sales in units + total variable expenses + total fixed expenses
selling and admin variable expenses formula
sales commissions + other variable expenses
selling and admin fixed expenses formula
admin salaries + depreciation + other fixed expenses
budgeted income statement
shows expected profitability for the period and provides a basis for evaluating company’s performance
what is the first step of budgeted income statement
compute total cost of producing one unit
what is the second step of budgeted income statement
prepare income statement
budgeted income statement formula
sales + COGS = gross profit - selling and admin expenses = net income
financial budgets
cash budgets, capital expenditure budget, budgeted balance sheet
cash budget
details how the business expects to go from the beginning cash balance to the desired ending balance and considered the most important financial budget
what are the three sections of a cash budget
cash receipts, cash disbursements, financing
cash receipts section
cash collections from customers, cash sales from the sales budget, collections of previous month’s credit sales (AR), investment revenue received, proceeds from planned sales of long-term assets or issuance of stock
cash disbursements
payments for DM (DM budget and payment schedule for AP), DL (directly from DL budget), MOH (excludes non-cash expenses), operating expenses (operating expense budget and excludes non-cash), capital expenditures (budgeted data)
financing section
companies often have a minimum cash balance to maintain
if the budgeted cash balance is less than the minimum
borrow money
if the budgeted cash balance is greater than the minimum and the company borrowed in previous periods
repay loan
budgetary control
budget reports that compare actual results with planned (budgeted) results
in budgetary control, differences (variances) are investigated
so you take corrective action OR modify future plans
static budget reports
compares actual results to those in the static budget
static budget reports often result in
comparing revenues and expenses at different activity levels
static budget report is best for
fixed costs and expenses
static budget
based on a single planned activity level
variances
difference between actual and budgeted amounts
favorable variances
actual expenses < budgeted expenses AND actual revenue > budgeted revenue
unfavorable variances
actual revenue < budgeted revenue AND actual expenses > budgeted expenses
static budgets and flexible budgets are prepared
before the period
static budget reports and flexible budget reports are prepared
after the period
flexible budgets
series of static budgets at different activity levels
in flexible budgets, what happens to variable and fixed costs
variable costs will differ at each level and fixed costs remain constant
what is the first step of flexible budgets
identify activity index and relevant range of activity
what is the second step of flexible budgets
determine budget variable cost per unit of activity
what is the third step of flexible budgets
identify budgeted fixed costs
what is the fourth step of flexible budgets
prepare budget for select levels of activity
flexible budget performance reports
compare actual results to budgeted amounts based on actual activity level
in flexible budget performance reports, variances are
more meaningful, not based on volume, but differences between sales prices and costs
responsibility accounting
reporting costs to managers who have the responsibility between sales prices and costs
all costs are controllable by
top management
fewer costs are controllable as
one moves down to each lower level of management
responsibility reporting system
prepared for each level of responsibility in the company’s organization chart
responsibility reporting system begins with
the lowest level of controlling costs and moves up the ladder
what are the three types of responsibility centers
cost centers, profit centers, and investment centers
cost centers
managers responsible for costs only; goal is to control costs
cost centers examples
production departments, service departments
profit centers
managers responsible for both revenue and costs; goal is to increase profits
profit center examples
individual departments in a retail store, branches of a bank
investment centers
managers accountable for the assets, revenues, and costs; managers responsible for generating sales, controlling expenses, managing assets needed to earn the income, and planning for future investment
investment centers examples
subsidiaries, business divisions
to evaluate performance of cost centers,
compare actual controllable costs with flexible budget data