82 Terms

1
New cards

• PD (Presidential Decree)

Issued during the Fourth Republic / Republic under Martial Law (1972–1986).

2
New cards

• BP (Batas Pambansa)

Issued during the Modified Semi-Presidential Republic (1978–1985).

3
New cards

• RA (Republic Act)

Enacted during the Republic periods (1946–1972; 1987–present).

4
New cards

• Section 41 of RA 9266

The legal provision requiring the Board (PRBoA), subject to PRC approval and in coordination with the IAPOA, to adopt and promulgate the IRR, Code of Ethical Conduct, and Standards of Professional Practice (SPP), taking effect 15 days after publication in the Official Gazette or two major daily newspapers.

5
New cards

• RA 9266

The Architecture Act of 2004 (approved March 17, 2004); an act providing for a more responsive and comprehensive regulation for the registration, licensing, and practice of architecture, repealing RA 545.

6
New cards

• RA 1581

Architecture Law of 1956 (June 16, 1956) – repealed/superseded.

7
New cards

• RA 545

Architecture Law of 1950 (June 17, 1950) – repealed by RA 9266.

8
New cards

• RA 8981

PRC Modernization Act of 2000 (December 5, 2000).

9
New cards

• PD 223

Decree Creating the Professional Regulation Commission (June 22, 1973).

10
New cards

• RA 386

Civil Code of the Philippines (June 18, 1949).

11
New cards

• Article 1723 (Civil Code)

States that the engineer or architect who drew up the plans and specifications is liable for damages if the building collapses within 15 years from completion due to a defect in those plans/specifications or ground defects. If they also supervised the construction, they are solidarily liable with the contractor. Action must be brought within 10 years following the collapse.

12
New cards

• Article 2192 (Civil Code)

States that if damages result from a construction defect mentioned in Art. 1723, third persons suffering damages may proceed only against the engineer, architect, or contractor within the period fixed therein.

13
New cards

• Article 2242 (Civil Code)

Lists preferred claims/liens on specific immovable property, including taxes due, unpaid price of real property sold, and claims of laborers, masons, mechanics, architects, engineers, and contractors engaged in the construction, reconstruction, or repair of buildings.

14
New cards

• PD 1096

National Building Code of the Philippines (NBCP) (February 19, 1977), revising RA 6541; latest IRR revision was in 2005.

15
New cards

• RA 6541

National Building Code of 1972 (June 22, 1973) – revised by PD 1096.

16
New cards

• RA 9514

Revised Fire Code of the Philippines of 2008 (December 19, 2008), repealing PD 1185.

17
New cards

• PD 1185

Old Fire Code of the Philippines (1977) – repealed by RA 9514.

18
New cards

• RA 9263

Bureau of Fire Protection (BFP) and Bureau of Jail Management and Penology (BJMP) Professionalization Act (2004).

19
New cards

• BP 344

Accessibility Law — An Act to Enhance the Mobility of Disabled Persons (February 25, 1983).

20
New cards

• PD 856

Sanitation Code of the Philippines (1975).

21
New cards

• PD 957

Condominium and Subdivision Buyer's Protective Decree (July 12, 1976).

22
New cards

• RA 6552

Maceda Law — Real Estate Buyer's Protective Act (1972).

23
New cards

• BP 220

Standards for Economic and Socialized Housing Projects (March 25, 1982).

24
New cards

• RA 8763

Home Guarantee Corporation Act (2000).

25
New cards

• RA 7279

Lina Law — Urban Development and Housing Act (1992).

26
New cards

• RA 1378

National Plumbing Code of the Philippines (January 28, 1959; latest revision 1999).

27
New cards

• RA 6234

Act Creating the Metropolitan Waterworks and Sewerage System / MWSS (1971).

28
New cards

• PD 1067

Water Code of the Philippines (1977).

29
New cards

• RA 9003

Ecological Solid Waste Management Act (2001).

30
New cards

• RA 3931

National Water and Air Pollution Control Commission Act (1964).

31
New cards

• PD 1586

Establishing the Environmental Impact Statement (EIS) System (1978).

32
New cards

• PD 1152

Philippine Environmental Code (1977).

33
New cards

• PD 984

Pollution Control Decree (1976).

34
New cards

• RA 8293

Intellectual Property Code of the Philippines (1997 / 1998).

35
New cards

• RA 3019

Anti-Graft and Corrupt Practices Act (1961).

36
New cards

• RA 8974

Law on Acquisition of Right-of-Way, Site, or Location for National Government Infrastructure Projects (2000).

37
New cards

• UAP Doc. 200

The 2006 Code of Ethical Conduct (UAP).

38
New cards

• SPP Annex A

Contains (a) General Definitions of SPP Documents, (b) Acronyms, and (c) General Notes on the Selection of Architects.

39
New cards

• SPP 201

Pre-Design Services.

40
New cards

• SPP 202

Design Services (Regular Design Services).

41
New cards

• SPP 203

Specialized Allied Services.

42
New cards

• SPP 204-A

Full-Time Construction Services.

43
New cards

• SPP 204-B

Construction Management Services.

44
New cards

• SPP 205

Post-Construction Services.

45
New cards

• SPP 206

Comprehensive Architectural Services.

46
New cards

• SPP 207

Design-Build Services.

47
New cards

• SPP 208

Architectural Design Competition (ADC).

48
New cards

• SPP 209

Professional Architectural Consulting Services (PACS).

49
New cards

• UAP Doc. 301

General Conditions (Owner-Contractor Agreement).

50
New cards

• A prospective client asks you to make free preliminary sketches first before signing a contract so they can "see your style." Should you accept?

No (Violation of Sec. 4.1 & 7.1). An architect cannot offer free preliminary sketches or render services without a definite written agreement for legitimate compensation.

51
New cards

• A client demands that you bypass a fire exit or reduce structural setbacks to maximize rentable floor area, saying "I'm paying you, follow my orders." What should you do?

Refuse (Sec. 4). While an architect must protect the client's interests, they must never do so at the expense of higher public interests, safety, and public welfare.

52
New cards

• A client asks you to sign a contract guaranteeing that the construction cost will not exceed ₱10 Million so they can secure a bank loan. Is this ethical?

No (Violation of Sec. 4.4). An architect must explain the conditional character of estimates and shall never guarantee construction costs to secure a commission (unless required by law in certain government projects).

53
New cards

• A paint and tile supplier offers you a 10% personal commission or rebate if you specify their brand in your client's project. Can you accept it?

No (Violation of Sec. 4.8 & 6.2). An architect must be compensated solely through their professional fee billed to the client. All market discounts or rebates from suppliers must be credited to the client.

54
New cards

• During construction, a contractor offers you free structural engineering calculations or an all-expenses-paid trip to thank you for approving their billing quickly. Is this allowed?

No (Violation of Sec. 5.4). An architect must reject any offer of free engineering services, substantial aid, gifts, or favors from a contractor that could place them under an obligation.

55
New cards

• You notice the contractor used substandard steel bars, but you wait until the concrete is poured before rejecting it to "teach them a lesson." Did you violate the Code?

Yes (Violation of Sec. 5.3). An architect must immediately condemn defective materials or workmanship upon personal inspection to avoid unnecessary delay and extra expense to the contractor.

56
New cards

• A client approaches you to take over a house project that was started by Architect X, who had a falling out with the client. What must you do before accepting?

Notify Architect X in writing and verify termination/payment (Sec. 7.5). You cannot undertake a commission previously handled by another architect unless you notify them in writing and conclusively determine that their original employment was terminated and duly compensated.

57
New cards

• A new owner bought an old commercial building originally designed by Architect Y and hires you to remodel its facade. Do you still need to notify Architect Y?

Yes (Violation of Sec. 7.6 if omitted). You must duly notify the original architect of the contemplated remodeling/addition even when the owner is no longer the same.

58
New cards

• A friend who is a licensed Civil Engineer or an unlicensed draftsman asks you to sign and seal their architectural plans for a fee because they don't have an architect's license. Is this legal?

No (Violation of Sec. 7.9 & RA 9266). An architect shall never affix their signature and seal to any plans or documents not prepared under their direct personal supervision ("ghost signing").

59
New cards

• You resign from an architectural firm and want to take copies of the 3D renders and CAD drawings you personally made for your portfolio. Can you just copy them and leave?

No (Violation of Sec. 7.21). Even if personally performed by you, you cannot take designs, drawings, or data when leaving an Architect-Employer without their permission (though the employer cannot unreasonably withhold permission unless confidentiality is involved).

60
New cards

• You are invited to be a Juror in an Architectural Design Competition. After the winner is chosen, the organizer offers you the job to be the main Architect of the winning project. Can you accept?

No (Violation of Sec. 7.3). A Professional Adviser or Juror in a competition cannot enter as a competitor nor accept employment as the project architect afterward, except as a Consulting Architect.

61
New cards

• A private developer asks you for a fee proposal via email without giving you a project brief, lot size, or official invitation. Should you send your fee quote?

No (Violation of Sec. 7.16). When acting as an independent consultant, you cannot quote a fee without receiving an official invitation and sufficient information on the nature and scope of the project first.

62
New cards

• You discover solid proof that a fellow architect is undercutting fees and signing fake plans. What is your ethical duty?

File a formal complaint (Sec. 7.20). If an architect possesses substantial information leading to a reasonable belief that another architect violated the Code, they shall file a formal complaint with the designated body.

63
New cards

• What happens if an architect is found guilty of violating the Code of Ethical Conduct?

Administrative and Criminal Penalties (Sec. 9). Suspension or revocation of their Certificate of Registration (or cancellation of special permit), and/or a fine of ₱100,000 to ₱5,000,000, and/or imprisonment of 6 months to 6 years.

64
New cards

• A building you designed collapses 12 years after completion due to a foundation design flaw in your plans. Are you still liable?

Yes (Civil Code Art. 1723). The architect/engineer who drew the plans is liable for damages if the building collapses within 15 years from completion due to defects in the plans/specifications or ground defects.

65
New cards

• In the same collapse scenario above, what if you also supervised the construction, and the contractor used weak concrete? Who pays the owner?

Both you and the contractor are solidarily liable (Civil Code Art. 1723). If the architect supervises construction, they share solidary liability with the contractor—meaning the owner can demand full payment from either or both of you.

66
New cards

• If a building collapses on Year 14 due to defective plans, how many years does the owner have to file a lawsuit against the architect?

10 years (Civil Code Art. 1723). The legal action must be brought within 10 years following the collapse.

67
New cards

• A building collapses and injures a pedestrian passing by. Who can the injured pedestrian sue?

Only the architect, engineer, or contractor (Civil Code Art. 2192). Third persons suffering damages from construction defects may proceed only against the architect, engineer, or contractor within the 15-year period.

68
New cards

• A client refuses to pay your architectural fees after you finished the building, and later sells the property. Do you have a legal claim on that building?

Yes (Civil Code Art. 2242). Unpaid claims of architects, engineers, and contractors engaged in constructing or repairing a building constitute a preferred lien/encumbrance on that specific immovable property.

69
New cards

• A foreign architect based in Singapore sends architectural drawings via email for a resort in Davao without partnering with a Filipino architect or getting a Temporary/Special Permit. Is this legal under RA 9266?

No (RA 9266 General Practice of Architecture). The practice of architecture in the Philippines is regulated regardless of whether the person is a Philippine resident or has their principal office in another territory.

70
New cards

• A client wants you to design a public commercial building without ramps, PWD toilets, or tactile paving to save money. What specific law are you violating if you agree?

BP 344 (Accessibility Law) — An Act to Enhance the Mobility of Disabled Persons (alongside PD 1096 / NBCP).

71
New cards

• A developer hires you to design a low-cost socialized housing subdivision. Which housing law governs the minimum lot sizes and road widths instead of the regular National Building Code?

BP 220 — Standards for Economic and Socialized Housing Projects (whereas PD 957 governs open-market Condominium and Subdivision projects).

72
New cards

• You are designing a large resort near a protected watershed and coastline. Which law requires you to secure an Environmental Compliance Certificate (ECC) before construction?

PD 1586 — Establishing the Environmental Impact Statement (EIS) System.

73
New cards

• A client owns a raw piece of land and doesn't know yet whether to build a hotel, a mall, or condos, and needs a budget and timeline first. Which SPP Document applies?

SPP Doc. 201 (Pre-Design Services) — Covers feasibility studies, site selection, budget planning, and project scheduling before design begins.

74
New cards

• A client hires you for the standard architectural scope: Schematic Design, Design Development, Contract Documents, Bidding, and Periodic Construction Supervision. Which SPP Document applies?

SPP Doc. 202 (Regular Design Services).

75
New cards

• A client asks you to design the acoustic treatment of a theater, custom lighting, and interior furniture layouts in addition to the building shell. Which SPP Document applies?

SPP Doc. 203 (Specialized Allied Services).

76
New cards

• A client wants an architect stationed at the construction site every single day to inspect work, separate from the Design Architect. Which SPP Document applies?

SPP Doc. 204-A (Full-Time Construction Supervision Services).

77
New cards

• For a massive high-rise complex, the client hires an architect to coordinate multiple specialty contractors, schedules, and costs from pre-construction to turnover. Which SPP Document applies?

SPP Doc. 204-B (Construction Management Services).

78
New cards

• After the building is occupied, the client hires you to evaluate building performance, manage maintenance schedules, and handle post-occupancy evaluation. Which SPP Document applies?

SPP Doc. 205 (Post-Construction Services).

79
New cards

• A client wants a single point of responsibility where you act as both the Architect who designs the building AND the Contractor who builds it. Which SPP Document applies?

SPP Doc. 207 (Design-Build Services).

80
New cards

• A client wants to hold a formal contest among architects to select the best design for a new museum. Which SPP Document governs the rules of this contest?

SPP Doc. 208 (Architectural Design Competition / ADC).

81
New cards

• Where do you check the official methods of compensation and schedule of fees for SPP Docs 201 to 209?

UAP-IAPOA Doc. 210 (compliant with PRBoA Resolution No. 3, s. 2010).

82
New cards

• Where do you look for the standard rules on contract time, delays, progress payments, and dispute resolution between the Owner and the General Contractor?

UAP Doc. 301 (General Conditions).