1/81
Looks like no tags are added yet.
• PD (Presidential Decree)
Issued during the Fourth Republic / Republic under Martial Law (1972–1986).
• BP (Batas Pambansa)
Issued during the Modified Semi-Presidential Republic (1978–1985).
• RA (Republic Act)
Enacted during the Republic periods (1946–1972; 1987–present).
• Section 41 of RA 9266
The legal provision requiring the Board (PRBoA), subject to PRC approval and in coordination with the IAPOA, to adopt and promulgate the IRR, Code of Ethical Conduct, and Standards of Professional Practice (SPP), taking effect 15 days after publication in the Official Gazette or two major daily newspapers.
• RA 9266
The Architecture Act of 2004 (approved March 17, 2004); an act providing for a more responsive and comprehensive regulation for the registration, licensing, and practice of architecture, repealing RA 545.
• RA 1581
Architecture Law of 1956 (June 16, 1956) – repealed/superseded.
• RA 545
Architecture Law of 1950 (June 17, 1950) – repealed by RA 9266.
• RA 8981
PRC Modernization Act of 2000 (December 5, 2000).
• PD 223
Decree Creating the Professional Regulation Commission (June 22, 1973).
• RA 386
Civil Code of the Philippines (June 18, 1949).
• Article 1723 (Civil Code)
States that the engineer or architect who drew up the plans and specifications is liable for damages if the building collapses within 15 years from completion due to a defect in those plans/specifications or ground defects. If they also supervised the construction, they are solidarily liable with the contractor. Action must be brought within 10 years following the collapse.
• Article 2192 (Civil Code)
States that if damages result from a construction defect mentioned in Art. 1723, third persons suffering damages may proceed only against the engineer, architect, or contractor within the period fixed therein.
• Article 2242 (Civil Code)
Lists preferred claims/liens on specific immovable property, including taxes due, unpaid price of real property sold, and claims of laborers, masons, mechanics, architects, engineers, and contractors engaged in the construction, reconstruction, or repair of buildings.
• PD 1096
National Building Code of the Philippines (NBCP) (February 19, 1977), revising RA 6541; latest IRR revision was in 2005.
• RA 6541
National Building Code of 1972 (June 22, 1973) – revised by PD 1096.
• RA 9514
Revised Fire Code of the Philippines of 2008 (December 19, 2008), repealing PD 1185.
• PD 1185
Old Fire Code of the Philippines (1977) – repealed by RA 9514.
• RA 9263
Bureau of Fire Protection (BFP) and Bureau of Jail Management and Penology (BJMP) Professionalization Act (2004).
• BP 344
Accessibility Law — An Act to Enhance the Mobility of Disabled Persons (February 25, 1983).
• PD 856
Sanitation Code of the Philippines (1975).
• PD 957
Condominium and Subdivision Buyer's Protective Decree (July 12, 1976).
• RA 6552
Maceda Law — Real Estate Buyer's Protective Act (1972).
• BP 220
Standards for Economic and Socialized Housing Projects (March 25, 1982).
• RA 8763
Home Guarantee Corporation Act (2000).
• RA 7279
Lina Law — Urban Development and Housing Act (1992).
• RA 1378
National Plumbing Code of the Philippines (January 28, 1959; latest revision 1999).
• RA 6234
Act Creating the Metropolitan Waterworks and Sewerage System / MWSS (1971).
• PD 1067
Water Code of the Philippines (1977).
• RA 9003
Ecological Solid Waste Management Act (2001).
• RA 3931
National Water and Air Pollution Control Commission Act (1964).
• PD 1586
Establishing the Environmental Impact Statement (EIS) System (1978).
• PD 1152
Philippine Environmental Code (1977).
• PD 984
Pollution Control Decree (1976).
• RA 8293
Intellectual Property Code of the Philippines (1997 / 1998).
• RA 3019
Anti-Graft and Corrupt Practices Act (1961).
• RA 8974
Law on Acquisition of Right-of-Way, Site, or Location for National Government Infrastructure Projects (2000).
• UAP Doc. 200
The 2006 Code of Ethical Conduct (UAP).
• SPP Annex A
Contains (a) General Definitions of SPP Documents, (b) Acronyms, and (c) General Notes on the Selection of Architects.
• SPP 201
Pre-Design Services.
• SPP 202
Design Services (Regular Design Services).
• SPP 203
Specialized Allied Services.
• SPP 204-A
Full-Time Construction Services.
• SPP 204-B
Construction Management Services.
• SPP 205
Post-Construction Services.
• SPP 206
Comprehensive Architectural Services.
• SPP 207
Design-Build Services.
• SPP 208
Architectural Design Competition (ADC).
• SPP 209
Professional Architectural Consulting Services (PACS).
• UAP Doc. 301
General Conditions (Owner-Contractor Agreement).
• A prospective client asks you to make free preliminary sketches first before signing a contract so they can "see your style." Should you accept?
No (Violation of Sec. 4.1 & 7.1). An architect cannot offer free preliminary sketches or render services without a definite written agreement for legitimate compensation.
• A client demands that you bypass a fire exit or reduce structural setbacks to maximize rentable floor area, saying "I'm paying you, follow my orders." What should you do?
Refuse (Sec. 4). While an architect must protect the client's interests, they must never do so at the expense of higher public interests, safety, and public welfare.
• A client asks you to sign a contract guaranteeing that the construction cost will not exceed ₱10 Million so they can secure a bank loan. Is this ethical?
No (Violation of Sec. 4.4). An architect must explain the conditional character of estimates and shall never guarantee construction costs to secure a commission (unless required by law in certain government projects).
• A paint and tile supplier offers you a 10% personal commission or rebate if you specify their brand in your client's project. Can you accept it?
No (Violation of Sec. 4.8 & 6.2). An architect must be compensated solely through their professional fee billed to the client. All market discounts or rebates from suppliers must be credited to the client.
• During construction, a contractor offers you free structural engineering calculations or an all-expenses-paid trip to thank you for approving their billing quickly. Is this allowed?
No (Violation of Sec. 5.4). An architect must reject any offer of free engineering services, substantial aid, gifts, or favors from a contractor that could place them under an obligation.
• You notice the contractor used substandard steel bars, but you wait until the concrete is poured before rejecting it to "teach them a lesson." Did you violate the Code?
Yes (Violation of Sec. 5.3). An architect must immediately condemn defective materials or workmanship upon personal inspection to avoid unnecessary delay and extra expense to the contractor.
• A client approaches you to take over a house project that was started by Architect X, who had a falling out with the client. What must you do before accepting?
Notify Architect X in writing and verify termination/payment (Sec. 7.5). You cannot undertake a commission previously handled by another architect unless you notify them in writing and conclusively determine that their original employment was terminated and duly compensated.
• A new owner bought an old commercial building originally designed by Architect Y and hires you to remodel its facade. Do you still need to notify Architect Y?
Yes (Violation of Sec. 7.6 if omitted). You must duly notify the original architect of the contemplated remodeling/addition even when the owner is no longer the same.
• A friend who is a licensed Civil Engineer or an unlicensed draftsman asks you to sign and seal their architectural plans for a fee because they don't have an architect's license. Is this legal?
No (Violation of Sec. 7.9 & RA 9266). An architect shall never affix their signature and seal to any plans or documents not prepared under their direct personal supervision ("ghost signing").
• You resign from an architectural firm and want to take copies of the 3D renders and CAD drawings you personally made for your portfolio. Can you just copy them and leave?
No (Violation of Sec. 7.21). Even if personally performed by you, you cannot take designs, drawings, or data when leaving an Architect-Employer without their permission (though the employer cannot unreasonably withhold permission unless confidentiality is involved).
• You are invited to be a Juror in an Architectural Design Competition. After the winner is chosen, the organizer offers you the job to be the main Architect of the winning project. Can you accept?
No (Violation of Sec. 7.3). A Professional Adviser or Juror in a competition cannot enter as a competitor nor accept employment as the project architect afterward, except as a Consulting Architect.
• A private developer asks you for a fee proposal via email without giving you a project brief, lot size, or official invitation. Should you send your fee quote?
No (Violation of Sec. 7.16). When acting as an independent consultant, you cannot quote a fee without receiving an official invitation and sufficient information on the nature and scope of the project first.
• You discover solid proof that a fellow architect is undercutting fees and signing fake plans. What is your ethical duty?
File a formal complaint (Sec. 7.20). If an architect possesses substantial information leading to a reasonable belief that another architect violated the Code, they shall file a formal complaint with the designated body.
• What happens if an architect is found guilty of violating the Code of Ethical Conduct?
Administrative and Criminal Penalties (Sec. 9). Suspension or revocation of their Certificate of Registration (or cancellation of special permit), and/or a fine of ₱100,000 to ₱5,000,000, and/or imprisonment of 6 months to 6 years.
• A building you designed collapses 12 years after completion due to a foundation design flaw in your plans. Are you still liable?
Yes (Civil Code Art. 1723). The architect/engineer who drew the plans is liable for damages if the building collapses within 15 years from completion due to defects in the plans/specifications or ground defects.
• In the same collapse scenario above, what if you also supervised the construction, and the contractor used weak concrete? Who pays the owner?
Both you and the contractor are solidarily liable (Civil Code Art. 1723). If the architect supervises construction, they share solidary liability with the contractor—meaning the owner can demand full payment from either or both of you.
• If a building collapses on Year 14 due to defective plans, how many years does the owner have to file a lawsuit against the architect?
10 years (Civil Code Art. 1723). The legal action must be brought within 10 years following the collapse.
• A building collapses and injures a pedestrian passing by. Who can the injured pedestrian sue?
Only the architect, engineer, or contractor (Civil Code Art. 2192). Third persons suffering damages from construction defects may proceed only against the architect, engineer, or contractor within the 15-year period.
• A client refuses to pay your architectural fees after you finished the building, and later sells the property. Do you have a legal claim on that building?
Yes (Civil Code Art. 2242). Unpaid claims of architects, engineers, and contractors engaged in constructing or repairing a building constitute a preferred lien/encumbrance on that specific immovable property.
• A foreign architect based in Singapore sends architectural drawings via email for a resort in Davao without partnering with a Filipino architect or getting a Temporary/Special Permit. Is this legal under RA 9266?
No (RA 9266 General Practice of Architecture). The practice of architecture in the Philippines is regulated regardless of whether the person is a Philippine resident or has their principal office in another territory.
• A client wants you to design a public commercial building without ramps, PWD toilets, or tactile paving to save money. What specific law are you violating if you agree?
BP 344 (Accessibility Law) — An Act to Enhance the Mobility of Disabled Persons (alongside PD 1096 / NBCP).
• A developer hires you to design a low-cost socialized housing subdivision. Which housing law governs the minimum lot sizes and road widths instead of the regular National Building Code?
BP 220 — Standards for Economic and Socialized Housing Projects (whereas PD 957 governs open-market Condominium and Subdivision projects).
• You are designing a large resort near a protected watershed and coastline. Which law requires you to secure an Environmental Compliance Certificate (ECC) before construction?
PD 1586 — Establishing the Environmental Impact Statement (EIS) System.
• A client owns a raw piece of land and doesn't know yet whether to build a hotel, a mall, or condos, and needs a budget and timeline first. Which SPP Document applies?
SPP Doc. 201 (Pre-Design Services) — Covers feasibility studies, site selection, budget planning, and project scheduling before design begins.
• A client hires you for the standard architectural scope: Schematic Design, Design Development, Contract Documents, Bidding, and Periodic Construction Supervision. Which SPP Document applies?
SPP Doc. 202 (Regular Design Services).
• A client asks you to design the acoustic treatment of a theater, custom lighting, and interior furniture layouts in addition to the building shell. Which SPP Document applies?
SPP Doc. 203 (Specialized Allied Services).
• A client wants an architect stationed at the construction site every single day to inspect work, separate from the Design Architect. Which SPP Document applies?
SPP Doc. 204-A (Full-Time Construction Supervision Services).
• For a massive high-rise complex, the client hires an architect to coordinate multiple specialty contractors, schedules, and costs from pre-construction to turnover. Which SPP Document applies?
SPP Doc. 204-B (Construction Management Services).
• After the building is occupied, the client hires you to evaluate building performance, manage maintenance schedules, and handle post-occupancy evaluation. Which SPP Document applies?
SPP Doc. 205 (Post-Construction Services).
• A client wants a single point of responsibility where you act as both the Architect who designs the building AND the Contractor who builds it. Which SPP Document applies?
SPP Doc. 207 (Design-Build Services).
• A client wants to hold a formal contest among architects to select the best design for a new museum. Which SPP Document governs the rules of this contest?
SPP Doc. 208 (Architectural Design Competition / ADC).
• Where do you check the official methods of compensation and schedule of fees for SPP Docs 201 to 209?
UAP-IAPOA Doc. 210 (compliant with PRBoA Resolution No. 3, s. 2010).
• Where do you look for the standard rules on contract time, delays, progress payments, and dispute resolution between the Owner and the General Contractor?
UAP Doc. 301 (General Conditions).