Leak Test Video:
When a manometer reads 2,000 psi it DOES NOT ensure that the oxygen tank is OPEN
What happens is that someone can close out the oxygen tank & NOT FLUSH OUT the oxygen that is trapped in the system - which would make the reading continue to read HIGH even though the tank is SHUT
To verify DEPRESS the O2 FLUSH
When the O2 flush is press & the needle starts DROPPING that means PRESSURE was TRAPPED

When the O2 flush is press & the needle stays UP that means the oxygen tank is OPEN & ready to go

When done with anesthetic machine CLOSE the oxygen tank & RELEASE oxygen trapped in the system w/ O2 FLUSH
Common areas for leaks:
Reservoir bag - around the rim
Breathing circuit
Connectors/hoses of the machine
Screw valves
Flowmeter
Inlet & outlet of vaporizer
Steps to perform leak test:
Plug up any possible escape of O2
CLOSE POP-OFF
This closes the scavenge so there is NO leak of O2

FLUSH the system w/ oxygen (Press O2 FLUSH), to fill the reservoir bag
Look at manometer to ensure that its OVER 40 cm of water of pressure

OPEN FLOWMETER to about 0.2 L/min
Ensures there’s NO LEAK in the flowmeter system
Count to 10 seconds to ensure the needle of manometer DOES NOT drop & bag DOES NOT DEFLATE
When completed leak test CLOSE FLOWMETER & OPEN POP-OFF & DON’T CLOSE oxygen tank
Leak Test Steps - Rebreathing:
CLOSE POP-OFF
CLOSE patient end (mouth piece) w/ finger
Press O2 FLUSH until a pressure reading of 40 cm H2O registers on the MANOMETER
Reservoir bag SHOULD INFLATE
Count to 20-40 seconds to see if the needle of manometer DOES NOT DECLINE
If the manometer DECLINES could indicate a LEAK BUT to ensure put FLOWMETER to 0.2L/min
If the manometer GOES UP again means NO LEAK & good to go
When the FLOWMETER was used CLOSE it FIRST
WITHOUT removing your finger from patient end, OPEN POP-OFF
Reservoir bag SHOULD DEFLATE
REMOVE thumb from patient end
Completely OPEN POP-OFF valve
DO NOT TURN OFF OXYGEN TANK when completed leak test
Leak Test - Non-rebreathing:
DO NOT USE O2 FLUSH - USE FLOWMETER
HOLD CLOSE POP-OFF & patient end at SAME TIME
Use FLOWMETER & put it to 4L/min until a pressure reading of 40 cm H2O registers on the MANOMETER
After the 40 cm H2O have been reach in the manometer put the flowmeter to ZERO
Reservoir bag SHOULD BE INFLATED
Count to 20-40 seconds to see if the needle of manometer DOES NOT DECLINE
If the manometer DECLINES could indicate a LEAK BUT to ensure put FLOWMETER to 0.2L/min
If the manometer GOES UP again means NO LEAK & good to go
When the FLOWMETER was used CLOSE it FIRST
WITHOUT removing your finger from patient end, OPEN POP-OFF - by releasing finger off the pop-off
Reservoir bag SHOULD DEFLATE
COMPLETED leak test
DO NOT CLOSE OXYGEN TANK
Additional Leak Test Information:
Rebreathing circuit leak-test:
CLOSE POP-OFF
CLOSE patient end of circuit w/ THUMB or PALM
PRESS FLUSH until a pressure reading of 40 cm H2O (should stay at 40 for 20-40 seconds)
Reservoir bag should INFLATE
OPEN POP-OFF
Non-rebreathing leak-test:
CLOSE patient end while HOLDING POP-OFF CLOSE
Use FLOW METER to INFLATE the reservoir bag
Release the POP-OFF to OPEN
Between switching from the REBREATHING CIRCUIT to NON-REBREATHING CIRCUIT DO NOT TURN OFF the O2 TANK
ONLY DO a LEAK TEST everytime you CHANGE CIRCUITS
How to open oxygen tank:

Vaporizer:
When filling anesthetic gas FILL it to the LINE
Keep the vaporizer at least ONE-HALF FULL at ALL times
OVERFILLING will result in ANESTHETIC OVERDOSE
UNDERFILLING will lead to an INABILITY to keep patient anesthetized

To fill the vaporizer unscrew cap located on the SIDE of vaporizer
When anesthetic liquid is LEAKING - tighten pin in the inside w/ cap
Precision vaporizer are COLORED CODED:
Isoflurane = PURPLE
Sevoflurane = YELLOW
Scavenge:
We use a PASSIVE SCAVENGING SYSTEM
Rely on GRAVITY to remove the gases from the system
The canister SHOULD be WEIGHTED w/ a gram scale BEFORE its first use
AFTER each use, the canister SHOULD be REWEIGHED
Once the canister has GAINED 50 grams from the initial weight it SHOULD be DISPOSED - b/c it will NO LONGER ABSORB the WASTE GAS

CO2 Absorber:
To see if the CO2 absorber is exhausted check GRANULES
Soft & crumbles = FRESH granules
Hard & dry = OLD granules
May exhibit a color change from WHITE to PURPLE

Granules SHOULD be CHANGED REGULARLY - to prevent the patient from REBREATHING toxic levels of CO2
When filling the granules to the FILL LINE - place screw in hole so it DOESN’T get blocked w/ granules & causes it to not attach to the circuit valves
Don’t OVER TIGHTEN screw as it can BREAK
O2 Tank:
E-tank
If you hear leak (hissing sound) in tank - CLOSE IT
Could mean tank is not attached well to YOKE
To remove tank put your foot down below tank & unscrew it to remove it
Then LINE PINS from the TANK to YOKE to fix the leaking sound
H-tank
To swap tank use wrench & screw off b/c chained against wall